SYSTEM STARTUP Sample Clauses

SYSTEM STARTUP. A. Provide the services of manufacturer's field representative for starting up and testing boilers. 1. The boiler manufacturer's start-up technician shall be familiar with the boiler's factory control hardware configurations and be able to integrate the boiler plants communication protocol with the Building Automation System via BACnet MS/TP. B. Complete the boiler manufacturer's start-up sheet and checklist to verify installation procedures have been followed. Submit these documents along with the O&M manuals.
AutoNDA by SimpleDocs
SYSTEM STARTUP. System Startup is the process by which a SCHOOL SYSTEM’s service is established. The goal of System Startup is to import as much information as possible to EasyIEP™ so that SCHOOL SYSTEM need not perform excessive manual data entry. PCG has developed a standard set of import stubs for the data elements required by EasyIEP™. The main categories of data imports include: A. Student Information B. User Information C. School Information D. Assessments E. Accommodations (if formalized) F. Annual Goals (if available)
SYSTEM STARTUP. A. Supply initial charge of refrigerant and oil for each refrigeration system. Replace losses of oil or refrigerant prior to end of correction period.
SYSTEM STARTUP. A. Prepare and start equipment. Adjust for proper operation. CONDENSING UNIT AND ALL RELATED COMPONENTS TO REMAIN 1/8" = 1'-0" MD-101 EXHIBIT G: MECHANICAL PLANS 2 1 NOTE # MECHANICAL NOTES REMOVE CONDENSING UNIT AND RELATED CONTROLS AND PIPING AS SHOWN. ABANDON ELECTRICAL WIRE AND CONDUIT AT GRADE LEVEL REMOVE REFRIGERANT PIPING AS SHOWN NOTE DESCRIPTION 1 SHEET NUMBER MD-101 CAMP XXXXXX - BUILDING 8-196 AHU AND BOILER UPGRADES 00000 XXX. 000 XXXXXX XXXXX, XX 00000 DATE:7/01/2020 DWN BY:C.D.T. L A CKD BY:J.J.T. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER UNDER THE LAWS OF THE XXXXX XX XXXXXXXXX. T I O N A L G U A N N E S O T A N A R D M I X X X X X X X MECHANICAL DEMOLITION SITE PLAN A W PROJECT NO.:XXXXXX REV. DESCRIPTION ADD./PR XXXXXX X. XXXXXXX DATE: 07/01/2020 LIC. # 47942 000.000.0000 FAX 000.000.0000 PLOT DATE:7/1/2020 7:54:21 AM FILE PATH: C:\Users\1513260250\Desktop\Revit at home\8-196\8-196 Mech.rvt 7 5 1 EXISTING RPZ TO REMAIN 1/4" = 1'-0" MD-102 EXHIBIT G: MECHANICAL PLANS REMOVE AHU, CONTROLS, AND REFRIGERANT PIPING. DUCTWORK, MIXING BOX, AND DAMPERS TO REMAIN REMOVE REFRIGERANT PIPING AS SHOWN REMOVE MAKE-UP WATER PIPING AS SHOWN REMOVE BOILER FLUE AND INTAKE THROUGH THE WALL REMOVE GAS PIPING AND REGULATOR AS SHOWN REMOVE HOT WATER PIPING AS SHOWN REMOVE BOILER PUMP, ALL RELATED CONTROLS AND PIPING AS SHOWN REMOVE BOILER, ALL RELATED CONTROLS AND PIPING AS SHOWN NOTE DESCRIPTION 1 3 1/2" = 1'-0" MD-102 PRIMARY PUMP TO REMAIN 6 EXPANSION TANK TO REMAIN 3 1/2" = 1'-0" MD-102 SHEET NUMBER MD-102 CAMP XXXXXX - BUILDING 8-196 AHU AND BOILER UPGRADES 00000 XXX. 000 XXXXXX XXXXX, XX 00000 DATE:7/01/2020 DWN BY:C.D.T. L A CKD BY:J.J.T. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 5 5 T I O N A L G U A N N E S O T A N A R D M I X X X X X X X MECHANICAL DEMOLITION FLOOR PLAN A W PROJECT NO.:XXXXXX REV. DESCRIPTION ADD./PR XXXXXX X. XXXXXXX DATE: 07/01/2020 LIC. # 47942 000.000.0000 FAX 000.000.0000 NOTE # NOTE DESCRIPTION 1 INSTALL NEW ELECTRICAL WIRING AND CONDUIT. INSTALL NEW REFRIGERANT PIPING PER MANUFACTURERS RECOMMENDATIONS, SEE DETAIL 1 / M-601. SEE DETAIL 2 / M-101 FOR EXTERIOR PIPING SUPPORT 2 INSTALL NEW CONDENSING UNIT ON 12" HIGH FABRICATED STEEL STAND M I N N E S Y O D T A A E R N A S T I Y O A ...
SYSTEM STARTUP. The first screen that any user sees after logging into Parole LEADS shall display the Terms and Conditions for using the application.
SYSTEM STARTUP. ‌ .1 Upon completion of the project, demonstrate the operation, care and maintenance of all system equipment and components in the presence of The City, or his representative, and the Contract Administrator. Obtain signed certification from The City that such equipment was shown to be fully operational and that all necessary operating instructions have been provided. .2 Arrange and pay for services of manufacturer's factory service engineer to supervise start- up of installation, check, adjust, balance and calibrate components and instruct operating personnel. .3 Provide these services for such period, and for as many visits as necessary to put equipment in operation, and ensure that operating personnel are conversant will aspects of its care and operation.
SYSTEM STARTUP. ‌ The HVI 900 is a sophisticated instrument that requires specific instruction and training to be used properly. Only operators that have received proper training should use the HVI system. Before beginning to use the instrument, make sure the system has been properly installed (see Chapter 2). Power should be ON for the instrument, monitor, and balance.
AutoNDA by SimpleDocs
SYSTEM STARTUP. The goal of this task is to complete training orientation for operations personnel, initiate system feeding and start-up, initiate automatic controls, and attain operational status for the transportation fuel production. This also includes the introduction of “biological seed” in the form of anaerobic sludge and VERDE pre-digestion bacteria to initiate the AD process and steady increase of loading to achieve steady-state conditions at the designed loading rate.
SYSTEM STARTUP. A. Coordinate schedule for start-up of various equipment and systems. B. Coordinate start-up schedule with Architect and Owner prior to start-up of each item. C. Verify that each piece of equipment or system has been checked for proper lubrication, drive rotation, belt tension, control sequence, and for conditions that may cause damage. D. Verify tests, meter readings, and specified electrical characteristics agree with those required by the equipment or system manufacturer. E. Verify that wiring and support components for equipment are complete and tested. F. Execute start-up under supervision of applicable Contractor personnel and manufacturer's representative in accordance with manufacturers' instructions. G. When specified in individual specification Sections, require manufacturer to provide authorized representative to be present at site to inspect, check, and approve equipment or system installation prior to start-up, and to supervise placing equipment or system in operation. H. Submit a written report that equipment or system has been properly installed and is functioning correctly.

Related to SYSTEM STARTUP

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Commissioning Commissioning tests of the Interconnection Customer’s installed equipment shall be performed pursuant to applicable codes and standards. The ISO and Connecting Transmission Owner must be given at least five Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • System Access CUSTOMER agrees to provide to PROVIDER, at CUSTOMER’S expense, necessary access to the mainframe computer and related information technology systems (the “System”) on which CUSTOMER data is processed during the times (the “Service Hours”) specified in the PSAs, subject to reasonable downtime for utility outages, maintenance, performance difficulties and the like. In the event of a change in the Service Hours, CUSTOMER will provide PROVIDER with at least fifteen (15) calendar days written notice of such change.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2

  • System Timeout The system providing access to PHI COUNTY discloses to 11 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY 12 must provide an automatic timeout, requiring re-authentication of the user session after no more than 13 twenty (20) minutes of inactivity.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.