SYSTEM STARTUP Sample Clauses

SYSTEM STARTUP. A. Provide the services of manufacturer's field representative for starting up and testing boilers.
AutoNDA by SimpleDocs
SYSTEM STARTUP. The goal of this task is to complete training orientation for operations personnel, initiate system feeding and start-up, initiate automatic controls, and attain operational status for the transportation fuel production. This also includes the introduction of “biological seed” in the form of anaerobic sludge and VERDE pre-digestion bacteria to initiate the AD process and steady increase of loading to achieve steady-state conditions at the designed loading rate.
SYSTEM STARTUP. The first screen that any user sees after logging into Parole LEADS shall display the Terms and Conditions for using the application.
SYSTEM STARTUP. System Startup is the process by which a SCHOOL SYSTEM’s service is established. The goal of System Startup is to import as much information as possible to EasyIEP™ so that SCHOOL SYSTEM need not perform excessive manual data entry. PCG has developed a standard set of import stubs for the data elements required by EasyIEP™. The main categories of data imports include:
SYSTEM STARTUP. A. Supply initial charge of refrigerant and oil for each refrigeration system. Replace losses of oil or refrigerant prior to end of correction period.
SYSTEM STARTUP. A. Prepare and start equipment. Adjust for proper operation. END OF SECTION PLOT DATE:7/1/2020 7:54:17 AM FILE PATH: C:\Users\1513260250\Desktop\Revit at home\8-196\8-196 Mech.rvt CONDENSING UNIT AND ALL RELATED COMPONENTS TO REMAIN 1/8" = 1'-0" MD-101 EXHIBIT G: MECHANICAL PLANS
SYSTEM STARTUP. ‌ The HVI 900 is a sophisticated instrument that requires specific instruction and training to be used properly. Only operators that have received proper training should use the HVI system. Before beginning to use the instrument, make sure the system has been properly installed (see Chapter 2). Power should be ON for the instrument, monitor, and balance.
AutoNDA by SimpleDocs
SYSTEM STARTUP. A. Coordinate schedule for start-up of various equipment and systems.

Related to SYSTEM STARTUP

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • System Timeout The system providing access to PHI COUNTY discloses to 11 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY 12 must provide an automatic timeout, requiring re-authentication of the user session after no more than 13 twenty (20) minutes of inactivity.

  • Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

Time is Money Join Law Insider Premium to draft better contracts faster.