Task 10 Road Design and Plan Development Sample Clauses

Task 10 Road Design and Plan Development. The CONSULTANT shall prepare preliminary plans, which shall be in accordance with the accepted standards for such work and in accordance with the Indiana Manual on Uniform Traffic control Devices (IMUTCD), INDOT Standard Specifications, INDOT Standard Drawings, INDOT Recurring Special Provisions and Plan Details, INDOT Special Provision Technical Advisories, Design Memorandums and the IDM and Town of Munster Standards. 1. The CONSULTANT shall prepare Unique Special Provisions as described in IDM Chapter 14 & 19. 2. Following approval of the hearing plans, approval of the Environmental Document, completion of the Public Hearing requirements, and any AI documents, to be completed under a separate contract, the CONSULTANT shall complete the final design and prepare contract plans, special provisions for the specifications and final cost estimates for the construction of the project. 3. The statement of probable construction costs and unit prices for construction shall be prepared according to INDOT’s current practices and shall include all items of work required for the complete construction of the work, including temporary work. 4. Develop a Traffic Control Plan that will coordinate with the construction of NICTD intersection reconstruction project of Main Street at Columbia/Sheffield Avenue, if necessary. 5. Coordinate the design with the design of adjacent projects to ensure construction compatibility and continuity. 6. The CONSULTANT shall arrange and attend such conferences with officials of INDOT and other interested agencies, as required. The CONSULTANT shall prepare presentation materials for the following meetings: a. Field Check – The CONSULTANT shall arrange and attend the preliminary field check, if necessary. The CONSULTANT shall prepare the field check notification letter and distribute it along with plans.
AutoNDA by SimpleDocs

Related to Task 10 Road Design and Plan Development

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK

  • Project Development a. Collaborate with COUNTY and project clients to identify requirements and develop a project Scope Statement. a. Develop a Work Breakdown Structure (WBS) for each project. b. Evaluate Scope Statement to develop a preliminary cost estimate and determinate whether project be vendor bid or be executed under a Job Order Contract (JOC).

  • Staff Development ‌ The County and the Association agree that the County retains full authority to determine training needs, resources that can be made available, and the method of payment for training authorized by the County. Nothing in this subsection shall preclude the right of an employee to request specific training.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.6.1. The ARCHITECT/ENGINEER shall prepare from the approved Schematic Design Studies, the Design Development Documents consisting of drawings (including at least architectural, landscaping, civil, structural, mechanical and electrical plans, building sections; and finish schedule), outline specifications following the Construction Specification Institute "CSI" Format and other necessary documents to fix and describe the size and character of the entire Project as to its site, structural, mechanical, and electrical systems, materials and other such essentials as may be appropriate, for and until approved by the State. 1.1.6.2. The ARCHITECT/ENGINEER shall conduct meetings with the State, Efficiency Vermont, and relevant members of the design team, to review the Design Development Documents for the purposes of furthering the energy efficiency objectives of the Project. 1.1.6.3. The ARCHITECT/ENGINEER shall prepare for the State a revised accounting of how the Project is responding to LEED criteria. 1.1.6.4. The ARCHITECT/ENGINEER shall submit to the State a revised Statement of Probable Construction Cost based thereon for and until approved by the State.

  • Alignment with Modernization Foundational Programs and Foundational Capabilities The activities and services that the LPHA has agreed to deliver under this Program Element align with Foundational Programs and Foundational Capabilities and the public health accountability metrics (if applicable), as follows (see Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf): a. Foundational Programs and Capabilities (As specified in Public Health Modernization Manual) b. The work in this Program Element helps Oregon’s governmental public health system achieve the following Public Health Accountability Metric: c. The work in this Program Element helps Oregon’s governmental public health system achieve the following Public Health Modernization Process Measure:

  • Technology Research Analyst Job# 1810 General Characteristics

  • TRAINING AND EMPLOYEE DEVELOPMENT 9.1 The Employer and the Union recognize the value and benefit of education and training designed to enhance an employee’s ability to perform their job duties. Training and employee development opportunities will be provided to employees in accordance with Employer policies and available resources. 9.2 Attendance at employer-required training will be considered time worked. The Employer will make reasonable attempts to schedule employer-required training during an employee’s regular work shift. The Employer will pay the registration and associated travel costs in accordance with Article 23, Travel, for employer-required training.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!