Xxxxxx Building. That certain building located generally at 00 X. Xxxxxxx Street, Jacksonville, Florida, to which the Xxxxxx Building Improvements will be made by Developer.
Xxxxxx Building. The renter agrees to rent the Xx. X. X. Xxxxxx Building at the Pleasant Garden Community Center located at 0000 Xxxxxxxx Xxxxxx Xxxx, Xxxxxxxx Xxxxxx, XX 00000 from the Town of Pleasant Garden. My signature above verifies that I understand the following rules and guidelines and agree to abide by them.
Xxxxxx Building. WSDOT will minimize the adverse effects of the Project to the Xxxxxx Building in the following manner.
1. Inject compensation grouting below grade to offset any settlement from the proposed tunneling.
2. Monitor the Xxxxxx Building in accordance with the monitoring provisions in Stipulation I.A. See Appendix B for building specific monitoring information.
3. Follow the provisions for intervention, if warranted, in accordance with the settlement management plan developed under Stipulation I.B.
4. Follow the claims and repair process, if warranted, in accordance with Stipulation I.C.
5. Ensure that all work is done in compliance with the City of Seattle's Municipal Code, as appropriate, with review and approval, as required, by the Pioneer Square Preservation Board.
Xxxxxx Building. Location Surveyed Applicable Accessibility Standard for Element, Space, or Area Existing Measurements or Summary of Non-compliance Photographs or Diagrams if Available (enlarge electronically ) Remedial Action7 2010 Standards (unless noted otherwise) Xxxxxx Building Constructed: 1971 Accessibility Standards: Existing facility standards (34 C.F.R. §§ 104.21 and 104.22) for unaltered elements, spaces, and areas of the Xxxxxx Building, unless a path of travel requirement is applicable. See specific surveyed element, space, or area, below, for applicable accessibility standard if altered. The Xxxxxx Building has four levels: ground, first, second, and third floors. Xxxxxx Building All Gender Restroom #120 (also referred to as a single-user or unisex restroom) First Floor of Xxxxxx Building Applicable accessibility standards: 2010 Standards Alterations: Restroom # 120 (former male restroom) was altered in the summer of 2015 to create a single- user restroom. All gender restroom #120 on first floor.
Xxxxxx Building. 0000 Xxxx Xxxxx Xx, Xxxxxxx, XX (Enter at Gate 9, off of Trinity Rd.) The undersigned below agrees to the following terms:
Xxxxxx Building. Building Automation and Integration Heat Pump Units (Typical of 2)
Xxxxxx Building. Exterior – Wet seal the perimeter of each window pane only at all windows. Wet seal all curtain wall systems including perimeter of each window frame and the perimeter of each window pane. Wet sealing will not be performed at any entrance doors, sidelights, or windows at entrance doors other than the entrances at the curtain wall systems. Not including any windows of the smaller office/addition area where there is glass block windows or sidelights at this area. (Entrance 6 area). Interior – Interior elastomeric caulking of the perimeter of the window frame will be performed only at identified in scope windows The following summarizes the recommendations: Door Sealing: repair or replace the Weatherstripping, door sweeps, and/or vertical sweeps in the locations identified in Attachment 5. Seal Windows/Penetration/Penetration Wall: seal window perimeter, penetrations, penetration walls in the locations identified in Attachment 5 – Schedule 1 FIMs with premium wet seal urethanized elastomeric sealants (DOWSIL™ 000 Xxxxxxxx Xxxxxxxx Xxxxxxx) per the manufacturers’ recommendation. Development of submittals (product datasheets only). None. This scope is based upon the following sites: Door Sealing 10 66.00 Seal Penetration 6 72.40 Seal Penetration Wall 6 402.33 Seal Windows 78 337.04 Door Sealing 6 21.00 Seal Penetration Wall 1 782.00 Seal Windows 341 1,019.33 Door Sealing 4 18.00 Seal Windows 18 67.54 Door Sealing 23 112.02 Seal Penetration 5 6.58 Seal Penetration Wall 2 85.00 Seal Windows 70 265.35 Door Sealing 7 74.33 Seal Penetration Wall 2 690.50 Seal Windows 4,035 1,618.90 Door Sealing 5 18.00 Seal Windows 1,494 637.88 Door Sealing 4 15.00 Seal Windows 285 1,129.40 Door Sealing 5 21.00 Seal Penetration 2 52.67 Seal Windows 1,353 590.54 Door Sealing 8 39.67 Seal Windows 540 1,135.71 None. 1-Year workmanship guarantee beginning upon final acceptance of this FIM. Manufacturer’s stated warranties on materials installed as part of this FIM. JCI shall provide the following closeout documents: Product data for new equipment installed. Warranty information for new material installed. Work not specifically described in Attachment 5. Repair or replacement of existing exterior doors and windows is excluded in this scope of work other than as described in scope. If any doors are found to be inoperable, or windows are found to be broken, JCI will report the deficiency to the customer for repair or replacement prior to JCI retrofitting the seals. ...
Xxxxxx Building. Lansing Existing bulletin boards shall not be moved or removed. In the event of a building remodel or other event necessitating the removal of current bulletin boards, the Employer will provide space for one (1) bulletin board per one hundred (100) Bargaining Unit employees or fraction thereof, but no less than one (1) bulletin board on each floor occupied by Bargaining Unit members employed by the Department of Treasury.
Xxxxxx Building. Lease is month to month, disclosed on contracts certification of even date.
Xxxxxx Building. Location Surveyed Applicable Accessibility Standard for Element, Space, or Area Existing Measurements or Summary of Non-compliance Photographs or Diagrams if Available (enlarge electronically ) Remedial Action7 2010 Standards (unless noted otherwise)