Xxxxxx Building. That certain building located generally at 00 X. Xxxxxxx Street, Jacksonville, Florida, to which the Xxxxxx Building Improvements will be made by Developer.
Xxxxxx Building. The renter agrees to rent the Xx. X. X. Xxxxxx Building at the Pleasant Garden Community Center located at 0000 Xxxxxxxx Xxxxxx Xxxx, Xxxxxxxx Xxxxxx, XX 00000 from the Town of Pleasant Garden. My signature above verifies that I understand the following rules and guidelines and agree to abide by them. Xxxxxx agrees to hold the Town of Pleasant Garden harmless in the event of injury or accident.
Xxxxxx Building. WSDOT will minimize the adverse effects of the Project to the Xxxxxx Building in the following manner.
Xxxxxx Building. This change enhances the building’s vertical character compared to the original sheathing with the spandrel panels that created horizontal bands between each floor. The exterior improvements were made through the City of Wichita’s facade program. The only other known modification was the addition of glass block on the west side of the 2nd floor in 2005 to address water infiltration in the parking garage. County Records include building permits in 2017 in the amount of $145,000 and $40,000 in 2020. The transition to luxury apartments was completed in 2015 and the building was renamed 000 Xxxxxxx Xxxxx. Today there are 157 apartments with recreational space on the 6th floor and a resident lounge on the 26th floor. 000 Xxxxxxx Xxxxx offers unique and distinctive living in an iconic downtown building with upscale amenities such as secure access, indoor reserved parking, on-site laundry, fitness center, and 24-hour maintenance staff.
Xxxxxx Building. 0000 Xxxx Xxxxx Xx, Xxxxxxx, XX (Enter at Gate 9, off of Trinity Rd.) The undersigned below agrees to the following terms:
Xxxxxx Building. Building Automation and Integration A JACE BAS is to be installed with communicating network thermostats on heat pump units. Control parameters are as follows: Heat Pump Units (Typical of 2) Control Points Monitoring Points ▪ Cooling Enable/Disable ▪ Heating Enable/Disable ▪ Supply Fan Command ▪ Space Temperature ▪ Space Temperature Setpoint Adj. ▪ Space Override ▪ Supply Air Temperature ▪ Supply Fan Status
Xxxxxx Building. Exterior – Wet seal the perimeter of each window pane only at all windows. Wet seal all curtain wall systems including perimeter of each window frame and the perimeter of each window pane. Wet sealing will not be performed at any entrance doors, sidelights, or windows at entrance doors other than the entrances at the curtain wall systems. Not including any windows of the smaller office/addition area where there is glass block windows or sidelights at this area. (Entrance 6 area). Interior – Interior elastomeric caulking of the perimeter of the window frame will be performed only at identified in scope windows Jail: No wet sealing of windows. The following summarizes the recommendations: Door Sealing: repair or replace the Weatherstripping, door sweeps, and/or vertical sweeps in the locations identified in Attachment 5. Seal Windows/Penetration/Penetration Wall: seal window perimeter, penetrations, penetration walls in the locations identified in Attachment 5 – Schedule 1 FIMs with premium wet seal urethanized elastomeric sealants (DOWSIL™ 000 Xxxxxxxx Xxxxxxxx Xxxxxxx) per the manufacturers’ recommendation. Final Engineering Development of submittals (product datasheets only). Demolition and Removal Work None. Installation This scope is based upon the following sites: Table 9.1 Building Quantity Length (ft) East End Annex Door Sealing 10 66.00 Seal Penetration 6 72.40 Seal Penetration Wall 6 402.33 Seal Windows 78 337.04 Extension Office Door Sealing 6 21.00 Seal Penetration Wall 1 782.00 Seal Windows 341 1,019.33 Extension Office Agricultural Building Door Sealing 4 18.00 Seal Windows 18 67.54 Xxxxxx Memorial Library Door Sealing 23 112.02 Seal Penetration 5 6.58 Seal Penetration Wall 2 85.00 Seal Windows 70 265.35 Xxx Xxxxxx Training Academy Door Sealing 7 74.33 Seal Penetration Wall 2 690.50 Seal Windows 4,035 1,618.90 Precinct One Facility Door Sealing 5 18.00 Seal Windows 1,494 637.88 Building Quantity Length (ft) Sugar Land Annex Door Sealing 4 15.00 Seal Penetration Wall 25 380.50 Seal Windows 285 1,129.40 Tax Office Door Sealing 5 21.00 Seal Penetration 2 52.67 Seal Windows 1,353 590.54 Xxxxxx Building Door Sealing 8 39.67 Seal Penetration Wall 4 116.53 Seal Windows 540 1,135.71 Training None. Warranties 1-Year workmanship guarantee beginning upon final acceptance of this FIM. Manufacturer’s stated warranties on materials installed as part of this FIM. Closeout JCI shall provide the following closeout documents: Product data for new...
Xxxxxx Building. Lansing Existing bulletin boards shall not be moved or removed. In the event of a building remodel or other event necessitating the removal of current bulletin boards, the Employer will provide space for one (1) bulletin board per one hundred (100) Bargaining Unit employees or fraction thereof, but no less than one (1) bulletin board on each floor occupied by Bargaining Unit members employed by the Department of Treasury.
Xxxxxx Building. Lease is month to month, disclosed on contracts certification of even date.
Xxxxxx Building. Location Surveyed Applicable Accessibility Standard for Element, Space, or Area Existing Measurements or Summary of Non-compliance Photographs or Diagrams if Available (enlarge electronically ) Remedial Action7 2010 Standards (unless noted otherwise) Xxxxxx Building Constructed: 1971 Accessibility Standards: Existing facility standards (34 C.F.R. §§ 104.21 and 104.22) for unaltered elements, spaces, and areas of the Xxxxxx Building, unless a path of travel requirement is applicable. See specific surveyed element, space, or area, below, for applicable accessibility standard if altered. The Xxxxxx Building has four levels: ground, first, second, and third floors. Xxxxxx Building All Gender Restroom #120 (also referred to as a single-user or unisex restroom) First Floor of Xxxxxx Building Applicable accessibility standards: 2010 Standards Alterations: Restroom # 120 (former male restroom) was altered in the summer of 2015 to create a single- user restroom. All gender restroom #120 on first floor.