AMENDED AND RESTATED SYSTEM EQUIPMENT PURCHASE AGREEMENT
*** | Certain information on this page has been omitted and filed separately with the Commission. |
2
*** | Certain information on this page has been omitted and filed separately with the Commission. |
3
4
5
6
*** | Certain information on this page has been omitted and filed separately with the Commission. |
7
*** | Certain information on this page has been omitted and filed separately with the Commission. |
8
9
10
11
12
13
*** | Certain information on this page has been omitted and filed separately with the Commission. |
14
15
16
17
*** | Certain information on this page has been omitted and filed separately with the Commission. |
18
19
20
21
22
*** | Certain information on this page has been omitted and filed separately with the Commission. |
23
*** | Certain information on this page has been omitted and filed separately with the Commission. |
24
*** | Certain information on this page has been omitted and filed separately with the Commission. |
25
*** | Certain information on this page has been omitted and filed separately with the Commission. |
26
27
28
29
30
31
*** | Certain information on this page has been omitted and filed separately with the Commission. |
32
33
34
35
*** | Certain information on this page has been omitted and filed separately with the Commission. |
36
*** | Certain information on this page has been omitted and filed separately with the Commission. |
37
*** | Certain information on this page has been omitted and filed separately with the Commission. |
38
*** | Certain information on this page has been omitted and filed separately with the Commission. |
39
Network Element | Measurement | Outage Limit | ||
[***] | Total Outage | [***]per [***] pair per [***]period | ||
[***] | Total Outage | [***] per [***] per [***] period | ||
[***] | Total Outage | [***] per [***] per [***] period | ||
[***] | Total Outage | [***] per [***] per [***] period | ||
[***] | Total Outage | [***] per [***] per [***] period |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
40
Impaired Sector-Carriers as a % | Liquidated Damages ($ | Maximum Liquidated | ||
of total Sector Carriers per | per Minute of | Damages per Month for | ||
Market During Month | Impairment Time) | Such Impairment | ||
Less than 5% | [***] | [***] | ||
At least 5% but less than 15% | [***] | [***] | ||
At least 15% but less than 25% | [***] | [***] | ||
At least 25% but less than 50% | [***] | [***] | ||
More than 50% | [***] | [***] |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
41
*** | Certain information on this page has been omitted and filed separately with the Commission. |
42
*** | Certain information on this page has been omitted and filed separately with the Commission. |
43
*** | Certain information on this page has been omitted and filed separately with the Commission. |
44
45
46
(a) | failure by the Person against whom indemnification is asserted to observe or perform any duties or obligations to Subcontractors or any third parties within the reasonable contemplation of this Agreement; | ||
(b) | the death or bodily injury of any agent, employee, customer, business invitee or any other person caused by the negligence, willful misconduct or strict liability of the Person against whom indemnification is asserted, its subcontractors or its or their respective employees, contractors, agents or representatives; provided that, no Company shall have any liability for any act or omission of Vendor or any Subcontractor, and Vendor shall have no liability for any act or omission of any Company; | ||
(c) | the damage, loss or destruction of any real or tangible personal property caused by the negligence, willful misconduct or strict liability of the Person against whom indemnification is asserted, its subcontractors or its or their respective employees, contractors, agents or representatives; provided that, no Company shall have any liability for any act or omission of Vendor or any Subcontractor, and Vendor shall have no liability for any act or omission of any Company; | ||
(d) | any claim, demand, charge, action, cause of action or other proceeding asserted against the Person seeking indemnification but arising out of or resulting from an act or omission of the Person against whom indemnification is asserted, its subcontractors or its or their respective employees, contractors, agents or representatives in its or their respective capacities as an employer; provided that, no Company shall have any liability for any act or omission of Vendor or any Subcontractor, and Vendor shall have no liability for any act or omission of any Company; and | ||
(e) | any breach or inaccuracy of any representation or warranty made by the Person against whom indemnification is asserted in or pursuant to this Agreement and any breach of any covenant or |
47
agreement made by the Person against whom indemnification is asserted in or pursuant to this Agreement. |
48
49
50
51
52
53
54
00000 Xxxxxxx Xxxxxx Xxxxx
Xxx Xxxxx, Xxxxxxxxxx 00000
Attention: Chief Executive Officer
Facsimile: (000) 000-0000
55
Sr. Vice President, General Counsel
00000 Xxxxxxx Xxxxxx Xxxxx
Xxx Xxxxx, Xxxxxxxxxx 00000
Facsimile: (000) 000-0000
0000 Xxxx Xxxxx, Xxxxx 000
Xxxxx, Xxxxx 00000
Attention: Contracts Department
Telephone: (000)-000-0000
Facsimile: (000)-000-0000
56
57
58
(i) | is published or is otherwise in the public domain through no fault of the receiving Person at the time of any claimed disclosure or unauthorized use by the receiving Person; |
59
(ii) | prior to disclosure pursuant to this Agreement is properly within the possession of the receiving Person as evidenced by reasonable documentation to the extent applicable; | ||
(iii) | subsequent to disclosure pursuant to this Agreement is lawfully received from a third party having rights in the information without restriction of the third party’s right to disseminate the information and without notice of any restriction against its further disclosure; | ||
(iv) | is independently developed by the receiving Person or is otherwise received through parties who have not had, either directly or indirectly, access to or knowledge of such Proprietary Information; | ||
(v) | is transmitted to the receiving Person after the disclosing Person has received written notice from the receiving Person after termination or expiration of this Agreement that it does not desire to receive further Proprietary Information; | ||
(vi) | is obligated to be produced under order of a court of competent jurisdiction or other similar requirement of a Governmental Entity, so long as the Person required to disclose the information provides the other Person with prior notice of such order or requirement and its cooperation to the extent reasonable in preserving its confidentiality; or | ||
(vii) | the disclosing Person agrees in writing is free of such restrictions. |
60
61
62
63
VENDOR: | ||||
FUTUREWEI TECHNOLOGIES, INC., | ||||
a Texas corporation | ||||
By:
|
/s/ Hu Hou Kun | |||
Name: Hu Hou Kun | ||||
Title: President | ||||
CRICKET: | ||||
CRICKET COMMUNICATIONS, INC., | ||||
a Delaware corporation | ||||
By:
|
/s/ Xxxxx Xxxxxx | |||
Name: Xxxxx Xxxxxx | ||||
Title: EVP & CTO |
64
1 OF 26 PAGES
I. SCOPE OF WORK |
3 | |||
II. INSTALLATION AND COMMISSIONING |
5 | |||
III. ACCEPTANCE TESTING AND HANDOVER |
8 | |||
IV. APPENDIX A |
10-22 | |||
V. APPENDIX B |
23-26 | |||
VI. APPENDIX C |
26 | |||
VII. APPENDIX D |
26 | |||
VIII. APPENDIX E |
27 | |||
VIII. APPENDIX F |
27 |
2 OF 26 PAGES
1. | PURPOSE |
• | Vendor shall design, engineer, and supply all specified tasks to meet the requirements as stipulated in the contract. | ||
• | Both Owner and Vendor have the right to request written clarification on the SOW and such requests must be in writing with one calendar week response time from date of receipt. |
2. | SCOPE |
3 OF 26 PAGES
• | Drawings for cabinet installation locations or placements | |
• | Lists of cabinets types and interfaces to include connectors | |
• | Cable lengths and specifications | |
• | Grounding requirements | |
• | Earthquake bracing | |
• | Earthquake cable requirements (if required) |
2.2 | Installation and Delivery Services |
• | Vendor will provide Equipment and will also be responsible for delivery of all Products to Purchaser’s initial specified location, Purchaser shall provide detailed location address to Vendor before shipment, the Equipment shall be distributed to such Purchaser’s initial location at Vendor’s cost; if such initial specified location is Purchaser’s designed warehouse, Purchaser will be responsible for the delivery from warehouse to installation site; if such initial specified location is the final installation Site, site must be ready to receive the Equipment within 30 days after such Equipment arrive at Vendor’s warehouse, if the Site can not be ready within 30 days, those Equipment will be delivered to Purchaser’s designated warehouse at vendor’s cost, the corresponding cost and expense for the transportation from Purchaser’s warehouse to the specified location for such delivery shall be born by Purchaser. | ||
• | Vendor will provide all materials for the installation of Vendor supplied Equipment unless otherwise specified in the attached responsibility matrix. | ||
• | Vendor will perform work in accordance with applicable government and industry safety codes. | ||
• | Vendor and its Subcontractors will maintain the immediate work area in a clean and safe manner. The immediate work area shall be kept free of all loose materials such as cartons, tie-wraps, etc. and cleaned at the end of each work day and all Equipment shall be vacuum-dusted; floors cleaned and extraneous or excess items removed following each installation. |
4 OF 26 PAGES
• | Damaged or faulty Equipment, Spare Parts, and replacement parts are the responsibility of Vendor during the installation and delivery period. | ||
• | Vendor will provide Spare Parts on Sites for all non-redundant System Cards during the installation and delivery period. | ||
• | Third-party deliverables are the responsibility of Vendor. | ||
• | Vendor shall obtain approval from Owner in the form of a MOP (method of procedure) before removing or returning to service any System Element in a live System or making any changes to Software parameters or System data in a live system. |
• | Owner will be billed at cost for any special heavy Equipment requirements (i.e. cranes) to locate Equipment to Sites. | |||
• | Any variations from the standards/plans used for installation of Equipment shall require prior written approval by Owner. | |||
• | Owner will provide such approval on a timely basis, not to exceed twentyfour (24) hours for any variations in approved plans and use of special heavy Equipment. | |||
• | Owner will provide the locations and addresses for all Sites | |||
• | Owner will provide access to all Sites as required. Delays due to the inability of Vendor to gain Site access due solely to Owner’s fault will be the responsibility of Owner. | |||
• | All documentation under Owner control that is deemed necessary by Vendor to meet deliverables must be made available to the Vendor Project Manager and ensure the correct document deliver to the Vendor( e.g. CDC) | |||
• | Owner will provide good preparation to all Sites as schedule required. Delays due to the inability of Vendor to gain good site preparation due solely to Owner’s fault will be the responsibility of Owner. | |||
• |
5 OF 26 PAGES
1. | Installation Planning |
2. | Equipment Installation |
3. | Equipment Test |
4. | Software Commissioning |
6 OF 26 PAGES
5. | System Integration |
6. | Shakedown Testing |
1. | RF Design & Optimization |
• | Link Budget Analysis | ||
• | CW Testing | ||
• | Model Tuning | ||
• | Site plan | ||
• | PN plan | ||
• | Neighbor list | ||
• | Site Parameter plan (i.e. Datafill) | ||
• | Coverage plots | ||
• | Traffic plan | ||
• | CDMA analysis | ||
• | Interference Analysis | ||
• | conduct the 911 test call during the shakedown testing or other determined time. |
7 OF 26 PAGES
2. | General RF Engineering Requirements |
• | 3. Owner should provide all requirement specification for the installation, Any variations from the standards/plans used for installation of Equipment shall require prior written approval by Vendor. |
8 OF 26 PAGES
• | Owner will make maintenance personnel available on Site as required to resolve any problems during installation and commissioning. | ||
• | Vendor and Owner will jointly determine engineering documentation changes as required and sign off on any corresponding design changes. | ||
• | All Site locations shall be a safe working environment for all personnel | ||
• | Provide all DC and AC power requirements. | ||
• | T1 facilities and transmission plan shall be provided for all Sites. |
9 OF 26 PAGES
• | T1 transmission shall be error free for all phases of work and operations. | ||
• | Adequate grounding shall be provided as defined in Exhibit L. | ||
• | All antennas and feeders shall be in working order as specified in Appendix E. | ||
• | The Network Planning and Optimization performing. | ||
• | Ensure placement of Vendor supplied Plenum at each Site prior to installation. (Reference Appendix D.) |
||
• | 24 hour security and access must be provided to Vendor and all approved Subcontractors. Any restrictions need to be defined and agreed upon before any work proceeds. |
• | Vendor personnel and Subcontractors shall follow all agreed upon methods of procedure throughout project implementation. | ||
• | Required insurance coverage will be provided. | ||
• | Provide tools for equipment installation, exclude the RF Tools. |
Provided by | ||||||||
No. | Item | VENDOR | OWNER | |||||
1 | Site Survey |
|||||||
1.1 | Identify Test Facility, MSC & Gateway MSC Sites, Site address, longitude
/ latitude coordinates.
|
Y | ||||||
1.2 | Test Facility, MSC and Gateway MSC Site requirements and evaluation of
proposed Sites
|
Y | ||||||
1.3 | Site Compliance with Government Regulation/Approval
|
Y | ||||||
1.4 | Provide existing Site drawings in electronic format.
|
Y | ||||||
1.5 | Provide access to Sites as required
|
Y | ||||||
1.6 | Perform Site survey and prepare Site survey reports/drawings( Switch
room only)
|
Y | Y | |||||
1.7 | Define technical System requirements for Sites
|
Y |
10 OF 26 PAGES
Provided by | ||||||||
No. | Item | VENDOR | OWNER | |||||
1.8 | Provide Site Specification requirements for size, floor loading,
raised-floor needs, floor material, physical & operational enclosure
requirements, cooling, air-conditioning, grounding & utility/emergency
power needs
|
Y | ||||||
1.9 | Provide Equipment layout plan for Vendor offered Equipment including
cabling, racks, grounding and termination(Switch room only)
|
Y | ||||||
1.10 | Provide Equipment loading requirements
|
Y | ||||||
1.11 | Floor Loading assessment
|
Y | ||||||
1.12 | Approve completed Equipment layout plan.
|
Y | ||||||
2 | SITE ENGINEERING |
|||||||
2.1 | Define technical System requirements for Sites
|
Y | ||||||
2.2 | Design Vendor Equipment components and rack layout
|
Y | ||||||
2.3 | Specify power and cabling requirements for Vendor Equipment
|
Y | ||||||
2.4 | Design System Element termination’s
|
Y | ||||||
2.5 | Verify and finalize the engineered Site design
|
Y | ||||||
2.6 | Approve engineered Site design and variance (if any)
|
Y | ||||||
2.7 | Preparation of Owner ODF / DDF with sufficient available ports.
|
Y | ||||||
3 | SITE PREPARATION & CONSTRUCTION |
|||||||
3.1 | Site preparation/construction of Equipment room as per the engineering
requirements as schedule required. Note: Prior to commencement of any
installation by Owner or its designated subcontractors, the Site shall
be suitably prepared to allow works to progress in a controlled, safe
and secure manner.
|
Y | ||||||
3.2 | Install raised Floor (if required) as per specification
|
Y | ||||||
3.3 | Install false ceiling (if required)
|
Y | ||||||
3.4 | Supply and install grounding from Grounding Rod to the distributed Main
Ground Window/Bar
|
Y | ||||||
3.5 | Install grounding from Owner distributed Main Ground Window/Bar to
Vendor supplied Equipment
|
Y | Y | |||||
3.6 | Provide DC battery backup for Vendor supplied Equipment.(BTS Only)
|
Y | ||||||
3.7 | Provide Commercial AC and install AC Power panel within Vendor supplied
Equipment locations
|
Y | ||||||
3.8 | Provide DC Power for all DC-based Vendor supplied Equipment
|
Y | ||||||
3.9 | Provide Uninterrupted Power System (UPS) for AC-based Vendor supplied
Equipment.
|
Y | ||||||
3.10 | Cable and connections from AC Power Panel to Vendor Equipment
|
Y | ||||||
3.11 | Install cable rack/ladder for Vendor Power and Feeder Cables
|
Y | ||||||
3.12 | Assemble and install fiber protection duct work to Vendor Equipment
location.
|
Y | ||||||
3.13 | Open and close existing cable holes and slots and provide new cable
holes (if necessary)
|
Y | ||||||
11 OF 26 PAGES
Provided by | ||||||||
No. | Item | VENDOR | OWNER | |||||
3.14 | Install air conditioning
|
Y | ||||||
3.15 | Site Physical Security (fence, security guards, etc.)
|
Y | ||||||
3.16 | Supply basic facilities e.g. lights, power, water, sanitary, telephone
connection in Sites.
|
Y | ||||||
3.17 | Provide all environmental alarms, sensors and alarm connecting
points(Switch site)
|
Y | ||||||
3.18 | Connect alarms to Vendor alarm panel (Switch Site)
|
Y | ||||||
3.18 | Provide and install DSX/NIU Equipment in the transmission room for T1/T3
interconnection
|
Y | ||||||
3.19 | Note: All necessary power supply and grounding provisions for the
Equipment shall be fully commissioned and operational. Such provisions
may include distribution networks and appropriate protection devices
(fuses, breakers, surge/lightning protection, etc. All signal and
circuit protective earthing and lightning protection shall be installed
and available. All necessary containment for cable and fiber (cable
ladder, cable tray, trunking, baskets, fiber guides, conduits, etc.)
shall be installed as required. All necessary cable penetrations through
walls, soffits, risers, etc. shall be formed. In addition, all cut-outs
and trims required in floor tiles shall be complete. Review and approval
prior to installation. This includes any associated civil / structural
works as needed to accommodate the Equipment on Site.
|
Y | ||||||
4 | STAGING |
|||||||
4.1 | Secure suitable staging location in market area
|
Y | ||||||
4.2 | Store Equipment in staging warehouse for maximum 30days
|
Y | Y | |||||
5 | PERMITS & LICENSING |
|||||||
5.1 | Determine Transmission requirements & the frequency band permits from
regulatory agency
|
Y | ||||||
5.2 | Obtain Import License or permits
|
Y | ||||||
5.3 | Obtain US Export Control Approvals
|
Y | ||||||
5.4 | Obtain all frequency and operating permits and clearances from
regulatory approvals (all operating areas)
|
Y | ||||||
5.5 | Obtain all government permits and clearances
|
Y | ||||||
5.6 | Approved Frequency Plan and license
|
Y | ||||||
5.7 | Obtain required Spectrum approvals
|
Y | ||||||
5.8 | Spectrum Clearance
|
Y | ||||||
5.9 | Spectrum availability
|
Y | ||||||
5.10 | Obtain all licenses for testing the System before launch
|
Y | ||||||
5.11 | Obtain clearance for PSTN interconnect
|
Y | ||||||
5.12 | Obtain all environmental permits and clearances
|
Y | ||||||
5.13 | Obtain aviation/height permits and clearance for tower heights
|
Y |
12 OF 26 PAGES
Provided by | ||||||||
No. | Item | VENDOR | OWNER | |||||
5.14 | Compliance with local Labor Safety and Health law and its regulated
regulations
|
Y | ||||||
5.15 | Vendor Equipment compliance with US requirements.
|
Y | ||||||
6 | NETWORK PLANNING |
|||||||
6.1 | Identify Network Planning requirements including Access and Backhaul
network, Data network and OMP network and design
|
Y | ||||||
6.2 | Provide complete detailed documentation on any of Owner’s existing
services/infrastructure that may impact/involve the current deployment.
|
Y | ||||||
6.3 | Provide skilled engineers familiar in Owner’s current and proposed
System infrastructure to assist with technical queries and questions
relevant to the project.
|
Y | ||||||
6.4 | Provide information on the forecast demand for services
|
Y | ||||||
6.5 | Define proposed service offerings
|
Y | ||||||
6.6 | Capacity planning and growth forecast for inputs into System and element
sizing
|
Y | ||||||
6.7 | Detailed requirements and services definition
|
Y | ||||||
6.8 | Provide design guidelines for the System
|
Y | ||||||
6.9 | Provide Network Configuration
|
Y | ||||||
6.10 | Develop/Provide interface to ALL support systems (Billing Management
System, SMS, Provisioning, etc.)
|
Y | Y | |||||
6.11 | Provide information on System security policy |
|||||||
6.12 | Design of security policy on supplied firewalls
|
Y | ||||||
6.13 | Provide IP VPN and ATM/FR network designs where applicable
|
Y | ||||||
6.14 | Provide design of System management and support system
|
Y | ||||||
6.15 | Provide IP addressing block and its design
|
Y | ||||||
6.16 | IP design and addressing plan
|
Y | ||||||
6.17 | ATM Addressing Plan, if any
|
Y | ||||||
6.18 | Design of System Elements naming conventions
|
Y | ||||||
6.19 | Third Party Interconnect agreements and support systems.
|
Y | ||||||
6.20 | IP routing policy study (based on Interconnect agreement)
|
Y | ||||||
6.21 | Provide IP routing design
|
Y | ||||||
6.22 | Approval of Network Planning
|
Y | ||||||
6.23 | Provide Network Planning documentation
|
Y | ||||||
6.24 | Conduct engineering review
|
Y | ||||||
6.25 | Provide the necessary capacities per Owner’s Network Planning
|
Y | ||||||
7 | RF PLANNING AND DESIGN |
|||||||
7.1 | Define Site location-coordinates, ground level (meters at level),
building/poles and guides height.
|
Y |
13 OF 26 PAGES
Provided by | ||||||||
No. | Item | VENDOR | OWNER | |||||
7.2 | Antenna specifications including: type, height (meters above ground
level), direction, sectorization and electrical tilt
|
Y | ||||||
7.3 | Specify the signal requirements for coverage
|
Y | ||||||
7.4 | Forecast traffic demand and location for service
|
Y | ||||||
7.5 | Define coverage objectives
|
Y | ||||||
7.6 | Specify the signal requirements for coverage (indoor and outdoor)
|
Y | ||||||
7.7 | Preliminary and Final RF design
|
Y | ||||||
7.8 | Provide the RF Network Planning reports which includes the base station
drawing and Site configuration
|
Y | ||||||
7.9 | Provide the preliminary design and final network planning
|
Y | ||||||
7.10 | Prepare the RF system parameter datafill
|
Y | ||||||
7.11 | Submit RF design & coverage plots
|
Y | ||||||
7.12 | Specify transmitter Output power
|
Y | ||||||
7.13 | Generate the traffic data
|
Y | ||||||
7.14 | Plotting of composite coverage
|
Y | ||||||
7.15 | Bandwidth filters if necessary
|
Y | ||||||
7.16 | Antenna system sweep test
|
Y | ||||||
8 | Preparation Activities |
|||||||
8.1 | All Site acquisition / lease / Site construction required for Equipment
installation.
|
Y | ||||||
8.2 | Obtain carrier license and establish relations with other carriers for
sharing facilities including negotiation
|
Y | ||||||
9.1.0 | Equipment Supply |
|||||||
9.1.1 | Agree on Xxxx Of Quantity (BOQ)
|
Y | ||||||
9.1.2 | Raise Purchase Order
|
Y | ||||||
9.1.3 | NSS, BSC/PCF, BTS, battery Equipment(BTS)
|
Y | ||||||
9.1.4 | DC power distribution cabinet
|
Y | ||||||
9.1.5 | DC power Equipment
|
Y | ||||||
9.1.6 | AC distribution plate
|
Y | ||||||
9.1.7 | Generator
|
Y | ||||||
9.1.8 | DSX
|
Y | ||||||
9.1.9 | Air conditioner
|
Y | ||||||
9.1.10 | Raised floor (or Cable tray)
|
Y | ||||||
9.1.11 | Grounding plate
|
Y | ||||||
9.1.12 | Desks for the OMC
|
Y | ||||||
9.1.13 | Feeder window
|
Y | ||||||
9.1.14 | Battery(Switch room)
|
Y | ||||||
9.1.15 | Inverter (or UPS)
|
Y | ||||||
9.1.16 | GPS antenna System
|
Y | ||||||
9.2.0 | Digital Trunk Cables & Optical Cable |
|||||||
9.2.1 | T1/T3 digital trunk cables between the BSC Equipment and the DSX.
|
Y | ||||||
9.2.2 | Connectors on the side of BSC Equipment
|
Y |
14 OF 26 PAGES
Provided by | ||||||||
No. | Item | VENDOR | OWNER | |||||
9.2.3 | Connectors on the side of the DSX panel
|
Y | ||||||
9.2.4 | 100 Ohm digital trunk cables between the DSX and transmission Equipment
|
Y | ||||||
9.2.5 | Connectors on side of transmission Equipment
|
Y | ||||||
9.2.6 | Internal cables and connectors between the BSC Equipment and the NSS
Equipment
|
Y | ||||||
9.3.0 | Power Cable |
|||||||
9.3.1 | DC power cable between the DC power Equipment and DC power distribution
cabinet
|
Y | ||||||
9.3.2 | Connectors on the side of the DC power Equipment
|
Y | ||||||
9.3.3 | Connectors on the side of the DC power distribution cabinet
|
Y | ||||||
9.3.4 | AC power cable between the AC distribution plate and the DC power
Equipment
|
Y | ||||||
9.3.5 | Connectors on the side of the AC distribution plate
|
Y | ||||||
9.3.6 | DC power cable between the DC distribution cabinet and BSC/MSC Equipment
|
Y | ||||||
9.3.7 | AC surge protector
|
Y | ||||||
9.4.0 | Protective Grounding Cable |
|||||||
9.4.1 | Protective grounding cable between the DC power Equipment and the
grounding plate
|
Y | ||||||
9.4.2 | Connectors on the side of the grounding plate
|
Y | ||||||
9.4.3 | Protective grounding cable between the DC power distribution cabinet and
the grounding plate
|
Y | ||||||
9.4.4 | Protective grounding cable between the DSX and the grounding plate
|
Y | ||||||
9.4.5 | Protective grounding cable between the BSC/MSC Equipment and the
grounding plate
|
Y | ||||||
9.5.0 | OMC Cables
|
Y | ||||||
9.6.0 | Air Conditioner
|
Y | ||||||
10.1.0 | Installation Materials |
|||||||
10.1.1 | BTS/Outdoor Battery Equipment
|
Y | ||||||
10.1.2 | BTS/Outdoor Battery cabinet Cement platform
|
Y | ||||||
10.1.3 | AC distribution plate
|
Y | ||||||
10.1.4 | Antenna
|
Y | ||||||
10.1.5 | Tower
|
Y | ||||||
10.1.6 | Grounding plate (outdoor))
|
Y | ||||||
10.1.7 | Generator
|
Y | ||||||
10.1.8 | Transmission Equipment
|
Y | ||||||
10.1.9 | GPS antenna System
|
Y | ||||||
10.2.0 | Digital Trunk Cables |
|||||||
10.2.1 | T1/T3 digital trunk cables between the BTS Equipment and Transmission
Equipment.
|
Y | ||||||
10.2.2 | Connectors on the side of the BTS Equipment
|
Y | ||||||
10.2.3 | Connectors on the side of the Transmission Equipment
|
Y | ||||||
10.3.0 | Power Cable |
|||||||
10.3.1 | AC power cable between the AC distribution plate and the outdoor BTS
Equipment
|
Y |
15 OF 26 PAGES
Provided by | ||||||||
No. | Item | VENDOR | OWNER | |||||
10.3.2 | Connectors on the side of the AC distribution plate
|
Y | ||||||
10.3.3 | DC power cable between BTS and Outdoor Battery cabinet
|
Y | ||||||
10.3.4 | Connector on the both side of the BTS and Outdoor Battery cabinet
|
Y | ||||||
10.3.5 | AC surge protector
|
Y | ||||||
10.4.0 | Protective Grounding Cable |
|||||||
10.4.1 | Protective grounding cable between the feeder and the grounding plate
(outdoor))
|
Y | ||||||
10.4.2 | Protective grounding cable between the BTS Equipment and the grounding
plate (outdoor))
|
Y | ||||||
10.4.3 | Connectors on the side of the BTS/Outdoor Battery Equipment
|
Y | ||||||
10.4.4 | Connectors on the side of the grounding plate (outdoor))
|
Y | ||||||
10.5.0 | Feeder |
|||||||
10.5.1 | Feeder between the BTS Equipment and the antenna
|
Y | ||||||
10.5.2 | Jumper between coax and antenna w/connectors
|
Y | ||||||
10.5.3 | Jumper between coax and BTS w/connectors
|
Y | ||||||
10.6.0 | Tower |
|||||||
10.6.1 | Feeder ladder
|
Y | ||||||
10.6.2 | Antenna support
|
Y | ||||||
10.6.3 | Lightning rod
|
Y | ||||||
10.7.0 | Cable Tray |
|||||||
10.7.1 | Outdoor cable tray
|
Y | ||||||
11.0.0 | SHIPMENT AND IMPORTATION |
|||||||
11.1.1 | Delivery of Equipment and Software of all System Elements/Equipment
required to provide the functionality specified
|
Y | ||||||
11.1.2 | Delivery of Tools/Test Equipment and Documentation
|
Y | ||||||
11.1.3 | Insurance
|
Y | ||||||
11.1.4 | Determine Equipment requirements for each Site and provide Equipment
List to Owner
|
Y | ||||||
11.1.5 | Ship contracted Equipment and Software
|
Y | ||||||
11.1.6 | Ship installation tools and test Equipment
|
Y | ||||||
11.1.7 | Ship to warehouse in designated market (Pay freight charges and
Insurance coverage)
|
Y | ||||||
11.1.8 | Clear Equipment from customs and pay custom duties and handling charges
|
Y | ||||||
11.1.9 | Deliver Vendor material to Owner Specified sites
|
Y | ||||||
11.1.10 | Obtain special installation permits e.g. crane, street blocking etc.
|
Y | ||||||
11.1.11 | Pay for required hoisting of Equipment to Sites, if required
|
Y | ||||||
11.1.12 | Handle miss-shipments, faulty Equipment and shortages
|
Y | ||||||
12.0.0 | Site Engineering |
|||||||
12.1.1 | Define technical System requirements for Sites
|
Y | ||||||
12.1.2 | Design Equipment components and rack layout
|
Y | ||||||
12.1.3 | Specify power and cabling requirements for Equipment
|
Y | ||||||
12.1.4 | Design Equipment termination’s
|
Y | ||||||
12.1.5 | Verify and finalize the engineered Site design(Switch room only)
|
Y |
16 OF 26 PAGES
Provided by | ||||||||
No. | Item | VENDOR | OWNER | |||||
12.1.6 | Approve engineered Site design and variance (if any)
|
Y | ||||||
12.1.7 | Assign places to fix the BTS/outdoor battery Equipment racks
|
Y | ||||||
12.1.8 | BTS/outdoor Battery Equipment racks
|
Y | ||||||
12.1.9 | AC / DC distribution plate
|
Y | ||||||
12.1.10 | Antennas
|
Y | ||||||
12.1.11 | Tower
|
Y | ||||||
12.1.12 | Grounding plate (outdoor)
|
Y | ||||||
12.1.13 | Generator
|
Y | ||||||
12.1.14 | Transmission Equipment
|
Y | ||||||
12.1.15 | GPS antenna System
|
Y | ||||||
12.2 | Digital Trunk Cables |
|||||||
12.2.1 | T1/T3 digital trunk cables between the BTS Equipment and Transmission
Equipment.
|
Y | ||||||
12.2.2 | Connectors on the side of the BTS Equipment
|
Y | ||||||
12.2.3 | Connectors on the side of the Transmission Equipment
|
Y | ||||||
12.2.4 | Optical fibers between the ODU3601CE and the ODF transmission Equipment
|
Y | ||||||
12.3 | Power Cable |
|||||||
12.3.1 | AC power cable between the AC distribution plate and the outdoor BTS
Equipment
|
Y | ||||||
12.3.3 | Connectors on the side of the AC distribution plate
|
Y | ||||||
12.3.5 | DC power cable between BTS and Outdoor Battery cabinet
|
Y | ||||||
12.3.7 | Connector on the both side of the BTS and Outdoor Battery cabinet
|
Y | ||||||
12.3.9 | AC surge protector
|
Y | ||||||
12.3.`10 | DC power cable between the DC distribution and the ODU3601CE
|
Y | ||||||
12.3.11 | Connectors on the side of the DC distribution plate
|
Y | ||||||
12.4 | Protective Grounding Cable |
|||||||
12.4.1 | Protective grounding cable between the feeder and the grounding plate
(outdoor)
|
Y | ||||||
12.4.2 | Protective grounding cable between BTS Equipment and the grounding plate
(outdoor)
|
Y | ||||||
12.4.3 | Connectors on the side of the BTS/outdoor battery Equipment
|
Y | ||||||
12.4.4 | Connectors on the side of the grounding plate (outdoor)
|
Y | ||||||
12.5 | Feeder |
|||||||
12.5.1 | Feeder between the BTS Equipment and the antenna
|
Y | ||||||
12.5.2 | Jumper between coax and antenna w/connectors
|
Y | ||||||
12.5.3 | Jumper between coax and BTS w/connectors
|
Y | ||||||
12.6 | Tower |
|||||||
12.6.1 | Feeder ladder
|
Y | ||||||
12.6.2 | Antenna support
|
Y | ||||||
12.6.3 | Lightning rod
|
Y | ||||||
12.7 | Cable Tray |
|||||||
12.7.1 | Outdoor cable tray
|
Y | ||||||
12.8 | Connector |
17 OF 26 PAGES
Provided by | ||||||||
No. | Item | VENDOR | OWNER | |||||
12.8.1 | Connectors (connecting material) for Vendor Equipment to be provided by
the Vendor
|
Y | ||||||
12.8.2 | Connectors (connecting material) for Owner Equipment to be provided by
the Owner
|
Y | ||||||
12.9 | Lighting Apparatus in the Equipment Room
|
Y | ||||||
12.10 | Power Socket
|
Y | ||||||
12.11 | Wiring Trough Frame/Ladder
|
Y | ||||||
13.0 | Installation — System Elements |
|||||||
13.1.1 | Inspection and acknowledgement of the inventory of such Equipment/materials
in the presence of and signed off by Vendor and Owners
authorized representative.
|
Y | Y | |||||
13.1.2 | Provide access to Sites
|
Y | ||||||
13.1.3 | Verify all items on Site readiness checklist
|
Y | ||||||
13.1.4 | Provide storage space for installation material and Equipment for Core
network on Switching Site
|
Y | ||||||
13.1.5 | Assign places to fix the BSC Equipment racks
|
Y | ||||||
13.1.6 | Mount and assemble the Equipment
|
Y | ||||||
13.1.7 | Connect and secure all interfaces to the Vendor-supplied Equipment, to
include circuit interface cables, alarms, ground cables etc.
|
Y | ||||||
13.1.8 | Power on Equipment and verify proper power-up.
|
Y | ||||||
13.1.9 | Install Equipment and connect to Owner Equipment
|
Y | ||||||
13.1.10 | Complete acceptance walkthrough of physical installation. Vendor
demonstrate / Owner accepts
|
Y | Y | |||||
13.1.11 | Clean up Site remove temporary works and staging after installation work
is completed
|
Y | ||||||
13.1.12 | DC power distribution cabinet
|
Y | ||||||
13.1.13 | DC power Equipment (Rectifiers)
|
Y | ||||||
13.1.14 | AC distribution plate
|
Y | ||||||
13.1.15 | Generator
|
Y | ||||||
13.1.16 | DSX
|
Y | ||||||
13.1.17 | Air conditioner
|
Y | ||||||
13.1.18 | Raised floor (or Cable tray)
|
Y | ||||||
13.1.19 | Grounding plate
|
Y | ||||||
13.1.20 | Desks for the OMC & SERVER
|
Y | ||||||
13.1.21 | Feeder window
|
Y | ||||||
13.1.22 | Battery
|
Y | ||||||
13.1.23 | Inverter (or UPS)
|
Y | ||||||
13.1.24 | GPS antenna System
|
Y | ||||||
13.2 | Digital Trunk Cables &Optical cable |
|||||||
13.2.1 | T1/T3 digital trunk cables between the BSC Equipment and the DSX.
|
Y | ||||||
13.2.2 | Connectors on the side of the BSC Equipment
|
Y | ||||||
13.2.3 | Connectors on the side of the DSX
|
Y | ||||||
13.2.4 | 100W digital trunk cables between the DSX and transmission Equipment
|
Y |
18 OF 26 PAGES
Provided by | ||||||||
No. | Item | VENDOR | OWNER | |||||
13.2.5 | Connectors on the side of the transmission Equipment
|
Y | ||||||
13.2.6 | Connectors of digital trunk cable which connect the transmission on the
side of the DSX
|
Y | ||||||
13.2.7 | Internal cables and connectors between the BSC Equipment and the NSS
Equipment
|
Y | ||||||
13.3 | Power Cable |
|||||||
13.3.1 | DC power cable between the DC power Equipment and DC power distribution
cabinet
|
Y | ||||||
13.3.2 | Connectors on the side of the DC power Equipment
|
Y | ||||||
13.3.3 | Connectors on the side of the DC power distribution cabinet
|
Y | ||||||
13.3.4 | DC power cable between the DC power distribution cabinet and the
BSC/ODU3601CE Equipment
|
Y | ||||||
13.3.5 | AC power cable between the AC distribution plate and the DC power
Equipment
|
Y | ||||||
13.3.6 | Connectors on the side of the AC distribution plate
|
Y | ||||||
13.3.7 | AC surge protector
|
Y | ||||||
13.4.1 | Protective Grounding Cable |
|||||||
13.4.2 | Protective grounding cable between the DC power Equipment and the
grounding plate
|
Y | ||||||
13.4.3 | Connectors on the side of the grounding plate
|
Y | ||||||
13.4.4 | Protective grounding cable between the DC power distribution cabinet and
the grounding plate.
|
Y | ||||||
13.4.5 | Protective grounding cable between the DSX and the grounding plate.
|
Y | ||||||
13.4.6 | Protective grounding cable between the BSC Equipment and the grounding
plate.
|
Y | ||||||
13.5.0 | OMC Cables and Internal Cables
|
Y | ||||||
13.6.0 | Air-conditioner
|
Y | ||||||
13.7.0 | Connector |
|||||||
13.7.1 | Connectors (connecting material) provided by the Vendor, except in
special applications
|
Y | ||||||
13.7.2 | Connectors (connecting material) provided by the Owner, except in
special applications
|
Y | ||||||
13.8.0 | Lighting Apparatus in the Equipment Room
|
Y | ||||||
13.9.0 | Power Socket
|
Y | ||||||
13.10.0 | Wiring Trough (Frame/Ladder)
|
Y | ||||||
14.0 | Project Management |
|||||||
14.1 | Identify single point of contact by Owner with Program Management
authority
|
Y | ||||||
14.2 | Program Management and establish Project Team
|
Y | ||||||
14.3 | Project Planning and Controls including maintaining action item list
|
Y | ||||||
14.4 | Coordinate and facilitate project kickoff meeting
|
Y | ||||||
14.5 | Communication Management — hold regular status meeting in an agreed time
schedule.
|
Y |
19 OF 26 PAGES
Provided by | ||||||||
No. | Item | VENDOR | OWNER | |||||
14.6 | Develop, maintain and tracking Master Project schedule on all activities
showing critical paths, including installation plans for each location &
entity
|
Y | ||||||
14.7 | Contract Administration and Change Management
|
Y | ||||||
14.8 | Subcontractor Management — manage Subcontractor relationship and
assigned resource
|
Y | ||||||
14.9 | Logistics Management and tracking shipment
|
Y | ||||||
14.10 | Provide project office and facilities for personnel
|
Y | ||||||
14.11 | Provide project warehousing and logistics for Equipment supplies and
installation materials
|
Y | ||||||
14.12 | Provide installation tools and test sets, exclude RF tools
|
Y | ||||||
14.13 | In-land transport costs and insurance coverage on Equipment
|
Y | ||||||
14.14 | Provide in-country transportation for project personnel
|
Y | ||||||
14.15 | Obtain work visas as required
|
Y | ||||||
14.16 | Provide invitation letters for overseas employees.
|
Y | ||||||
15 | TRAINING |
|||||||
15.1 | Conduct domestic training classes
|
Y | ||||||
15.2 | Conduct overseas training
|
n/a | ||||||
15.3 | Conduct on Site (OJT) installation and testing training for Base Station
|
Y | ||||||
15.4 | Conduct OJT training for OAM before maintenance turnover
|
Y | ||||||
15.5 | Provide designated offices/rooms for Owner location training.
|
Y | ||||||
15.6 | For training, Vendor will provide all materials, documents and software
packages
|
Y | ||||||
16 | TURN UP |
|||||||
16.1 | Provide the Equipment configuration information.
|
Y | ||||||
16.2 | Attach all physical connections between the Owner supplied interfaces
and the Vendor Equipment.
|
Y | ||||||
16.3 | Verify that all local interconnections and connectivity are in place and
functional so Vendor can perform local test.
|
Y | ||||||
16.4 | Test connectivity.
|
Y | ||||||
16.5 | Owner will be responsible for removing and placing back into service all
live circuits (e.g., Trunks, T1s).
|
Y | ||||||
16.6 | Vendor will be responsible for all physical connections to its Equipment.
|
Y | ||||||
17 | EQUIPMENT ACCEPTANCE |
|||||||
17.1 | Identify point of contact for signoff by Owner.
|
Y | ||||||
17.2 | Develop Equipment acceptance plan
|
Y | ||||||
17.3 | Approve Equipment acceptance plan
|
Y | ||||||
17.4 | Witness and sign acceptance documentation upon the completion of
Equipment installation.
|
Y | ||||||
17.5 | Vendor’s Equipment ATP Test with Owner’s support
|
Y | ||||||
17.6 | Owner’s third parties’ service layer ATP Test Plan and test Execution
with Vendor’s support
|
YY |
20 OF 26 PAGES
Provided by | ||||||||
No. | Item | VENDOR | OWNER | |||||
18 | SITE INSTALLATION AND INTEGRATION SUBSTANTIAL COMPLETION |
|||||||
18.1 | Identify Owner point of contact for acceptance of each Site.
|
Y | ||||||
18.2 | Perform Software commissioning and integration for all System Element
and provide test results to Owner ( testing will consist of Vendor test
sections to insure Equipment functionality)
|
Y | ||||||
18.3 | Issue a Punch List of all incomplete items which items shall be
completed by Vendor prior to Final Acceptance.
|
Y | ||||||
18.4 | Provide manuals, as-built drawings and documentation for all Equipment
to Owner
|
Y | ||||||
18.5 | Approve Site Acceptance results
|
Y | ||||||
19.0 | INTERCONNECTION TO PSTN/PLMN |
|||||||
19.1 | Provide T1 Transmission and access circuits meeting performance and
schedule criteria for: Gateway, Soft switch and BTS
|
Y | ||||||
19.2 | Provide PSTN lines per MSC for Optimization Testing
|
Y | ||||||
19.3 | Provide (STP) points as required for testing
|
Y | ||||||
20.0 | SYSTEM INTEGRATION |
|||||||
20.1 | Develop and verify a detailed turn up plan for each market and major
subsystem. The turn up plan will cover the connections within subsystem
itself; and also the connections between each subsystem.
|
Y | Y | |||||
20.2 | Develop an integration back out plan
|
NA | NA | |||||
20.3 | Conduct basic tests to insure System functionality
|
Y | ||||||
20.4 | Conduct E911 certification testing with Owner E911 third party suppliers
|
Y | ||||||
20.5 | Any elements which are deemed to be of sub-standard quality will be
recorded in the Punch and resolved by Final Acceptance.
|
Y | ||||||
20.6 | Owner will provide all necessary System related translation parameter
data to Vendor
|
Y | ||||||
20.7 | Vendor will perform all System related translation into the Vendor System
|
Y | ||||||
20.8 | Owner will conduct adjunct test(include but not limit to CALEA,
E911,Billing,Network Management)
|
Y | ||||||
21 | RF OPTIMIZATION |
|||||||
21.1 | System-wide Optimization
|
Y | ||||||
21.2 | System O&M stats and testing data analyze and conduct the parameter
adjustment
|
YY | ||||||
21.3 | Implement the adjustment recommendations
|
Y |
21 OF 26 PAGES
Provided by | ||||||||
No. | Item | VENDOR | OWNER | |||||
21.4 | Replacement of Feeders and Antenna’s if required (based on results of
sweep (VSWR ) test
|
Y | ||||||
21.5 | Achieve KPIs as part of optimization.
|
Y | ||||||
22 | SUBSTANTIAL COMPLETION |
|||||||
22.1 | Issue Certificate of Substantial Completion
|
Y | ||||||
22.2 | Approve Certificate of Substantial Completion
|
Y | ||||||
23 | CERTIFICATE OF FINAL ACCEPTANCE |
|||||||
23.1 | 90 days of continuous operation within specification
|
Y | ||||||
23.2 | Completion of punch list items
|
Y | ||||||
23.3 | Issue Certificate of Final Acceptance
|
Y | ||||||
23.4 | Approve Certificate of Final Acceptance
|
Y |
22 OF 26 PAGES
23 OF 26 PAGES
24 OF 26 PAGES
25 OF 26 PAGES
26 OF 26 PAGES
EXHIBIT B |
i) | The detail Initial System Configuration will only be finalized after Company Radio and Core Network planning response. Please refer to Table-1.1 for Initial System Configuration Infrastructure list. Huawei will work together with Company on detail network configuration. | ||
ii) | In the event of actual delivery of BTS/Cell site(s) quantity differs with the predetermined quantity as stated in Table-1.1, the actual BTS/Cell site(s) quantity will be determined by Table-2. | ||
iii) | Table-1 represents the BTS/Cell sites number according to Company RNP. Table-2 is the BTS/Cell sites quantity ratio to represent the pricing. | ||
iv) | Should the actual delivery of BTS/Cell site(s) exceed the quantity as stated in Table-1.1 the additional BTS/Cell site(s) will be charged according to “Exhibit D Equipment Upgrade Pricing". | ||
v) | Should the actual delivery of BTS/Cell sites(s) is fewer than the quantity as stated in Table-1.1, Company could use the remaining credit in other market and/or for future BTS expansion according to “Exhibit D Equipment Upgrade Pricing". | ||
vi) | All outdoor BTSs come standard with 4 hours of battery backup regardless of the configuration. XXXx come standard with 1 hour of battery backup. Additional backup capacity can be purchased. | ||
vii) | BTSs configured with more than 256 channel elements will be provided with channel element cards utilizing the CSM 6700 chip. |
Covered | F2 6 | |||||||||||||||||||||||||||||||||||||||||||
Market | Pops | Subs | Erlangs | Sites | F1 | F2 | F3 | Sec | 1xCE | MSCe | MGW | BSC | ||||||||||||||||||||||||||||||||
Market A |
[***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | ||||||||||||||||||||||||||||||||
Market B |
[***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | ||||||||||||||||||||||||||||||||
Market C |
[***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | ||||||||||||||||||||||||||||||||
OWNER Total |
[***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Site Type | Configuration | |
F1
|
3606AE (S111 1x + S111 XXXX) (128 0xXX, 000 XXXxxX CE) | |
F2
|
3606AE (S222 1x + S111 XXXX) (192 0xXX, 000 XXXxxX CE) | |
F3
|
3606AE (S333 1x + S111 XXXX) (256 0xXX, 000 XXXxxX CE) | |
F2 6 Xxxxxx
|
0000XX (S222222 1x + S111111 XXXX) (384 0xXX, 000 XXXxxX CE) |
Market/Location | BTS | |
[***]
|
3606AE (32 1xCE, 192 XXXX) | |
[***]
|
3606A (32 1xCE, 192 XXXX) | |
[***]
|
3606AE (32 1xCE, 192 XXXX) +ODU3601CE | |
Market A
|
3606AE (32 1xCE, 000 XXXX) | |
Xxxxxx X
|
3606AE (32 1xCE, 192 XXXX) | |
Market C
|
3606AE (32 1xCE, 192 XXXX) |
BTS Quantity Ratio | ||||
Compare to *F1 | ||||
BTS Model | BTS Configuration | (Normalized to *F1) | ||
BTS3606AE
|
*F1 (S111 1x + S111 XXXX) (128 0xXX, 000 XXXxxX CE) | [***] | ||
BTS3606AE
|
F2 (S222 1x + S111 XXXX) (192 0xXX, 000 XXXxxX CE) | [***] | ||
BTS3606AE
|
F3 (S333 1x + S111 XXXX) (256 0xXX, 000 XXXxxX CE) | [***] | ||
BTS3606AE
|
F4 (S444 1x + S111 XXXX) (320 0xXX, 000 XXXxxX CE) | [***] | ||
BTS3606AE
|
F5 (S555 1x + S111 XXXX) (384 0xXX, 000 XXXxxX CE) | [***] | ||
BTS3606AE
|
F1 (S1111 1x + S1111 XXXX) (128 0xXX, 000 XXXxxX CE) | [***] | ||
BTS3606AE
|
F1 (S11111 1x + S11111 XXXX) (128 0xXX, 000 XXXxxX CE) | [***] | ||
BTS3606AE
|
F1 (S111111 1x + S111111 XXXX) (128 0xXX, 000 XXXxxX CE) | [***] | ||
BTS3606AE
|
F2 (S2222 1x + S1111 XXXX) (256 0xXX, 000 XXXxxX CE) | [***] | ||
BTS3606AE
|
F2 (S22222 1x + S11111 XXXX) (256 0xXX, 000 XXXxxX CE) | [***] | ||
BTS3606AE
|
F2 (S222222 1x + S111111 XXXX) (384 0xXX, 000 XXXxxX CE) | [***] | ||
ODU3601CE
|
ODU 1-Carrier (1x) | [***] | ||
ODU3601CE
|
ODU 2-Carrier (1x + XXXX) | [***] | ||
ODU3601CE
|
ODU 3-Carrier (1x + XXXX) | [***] |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
BTS Quantity Ratio | ||
Compare to *F1 | ||
Channel Element (1x RTT only) | (Normalized to *F1) | |
32 CE Step
|
[***] | |
64 CE Step
|
[***] | |
128 CE Step
|
[***] |
F1 (S111 1x + S111 XXXX) (64 0xXX, 000 XXXxxX CE) x 100
F2 (S222 1x + S111 XXXX) (192 0xXX, 000 XXXxxX CE) x 220
F2 (S222 1x + S111 XXXX) (256 0xXX, 000 XXXxxX CE) x 50
F3 (S333 1x + S111 XXXX) (256 0xXX, 000 XXXxxX CE) x 200
F1 (S111 1x + S111 XXXX) (128 0xXX, 000 XXXxxX CE) x 1000
|
= 1.00 x 780 | = 780 | |||
F1 (S111 1x + S111 XXXX) (64 0xXX, 000 XXXxxX CE) x 100
|
= (1.00 — 0.16) x 100 | = 84 | |||
F2 (S222 1x + S111 XXXX) (192 0xXX, 000 XXXxxX CE) x 220
|
= 1.20 x 220 | = 264 | |||
F2 (S222 1x + S111 XXXX) (256 0xXX, 000 XXXxxX CE) x 50
|
= (1.20 + 0.16 ) x 50 | = 68 | |||
F3 (S333 1x + S111 XXXX) (256 0xXX, 000 XXXxxX CE) x 200
|
= 1.60 x 200 | = 320 | |||
Total | = 1516 |
a) | 3.0% of the total population of each non-redundant replaceable Core network unit for each city where the core network products are located. | ||
Example: there are 2 MSCe in one city, and if each has x identical replaceable cards that is non-redundant (if the card fails, we lose the MSC, a rack, or a shelf), then the spares package must include 3% of 2x. If that quantity is less than 1, then 1 is the minimum. |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
b) | 1.0% of the total population of each redundant replaceable Core network unit for each city where the core network products are located. | ||
Example: there are 3 BSCs in one city, and if each has y identical replaceable cards that is redundant, then the spares package must include 1% of 3y. If that quantity is less than 1, then 1 is the minimum. | |||
c) | 0.5% of each sector carrier replaceable unit and 1.0% of the remaining replaceable unit in a BTS. | ||
Example: if there are 1000 BTSs in a market with an average of 4 sector carriers per BTS, then the Spares Kit would contain a minimum of 20 sector carrier replaceable units and 10 BTS replaceable units. | |||
d) | A supply of replaceable units in a BTS that is expected to be repaired in a two week period as calculated using the mean time between repair (MTBR) and the total population of a replaceable unit in a market. | ||
Example: if there are 3650 identical replaceable units in a market with a 10 years MTBR, then, on average, 1 unit would require repair every day. Hence, the Spares Kit would contain a minimum 14 of these replaceable units. | |||
e) | The BTS spares kit should be the maximum of duplicates identified in c and d, not the cumulative effect. | ||
Example: if 5 Amplifier cards are needed according to criteria c, 8 Amplifier cards are needed according to criteria d, then maximum 8 Amplifier cards should be included in the spares kit. |
Exhibit C |
EV-DO Rev A | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Market | Covered Pops | Subs | Erlangs | BHCA | Sites | POP’s/Site | F1 | F2 | F3 | F2 6 sec | Carrier | MSCe | MGW | BSC | ||||||||||||||||||||||||||||||||||||||||||
Market A |
[***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | ||||||||||||||||||||||||||||||||||||||||||
Market B |
[***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | |||||||||||||||||||||||||||||||||||||||||||
Market C |
[***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | |||||||||||||||||||||||||||||||||||||||||||
OWNER Total |
[***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] | [***] |
Site Type | Configuration | |
F1
|
3606AE (S111 1x + S111 XXXX) (128 0xXX, 000 XXXxxX CE) | |
F2
|
3606AE (S222 1x + S111 XXXX) (192 0xXX, 000 XXXxxX CE) | |
F3
|
3606AE (S333 1x + S111 XXXX) (256 0xXX, 000 XXXxxX CE) | |
F2 6 Xxxxxx
|
0000XX (S222222 1x + S111111 XXXX) (384 0xXX, 000 XXXxxX CE) |
Capex Per Covered Pop |
[***] | |||
Equipment Total CAPEX |
[***] | |||
Executive Incentive for Market A |
[***] | |||
Equipment Total CAPEX After Incentive |
[***] | |||
CAPEX Per Covered Pop After Incentive |
[***] | |||
Opex Per Covered Pop Annual |
[***] | |||
Opex per BTS Annual |
[***] |
Price USD | Price USD | |||||||||||
Final Contract Pricing Per Market | Covered Pops | CAPEX | OPEX | |||||||||
Market A |
[***] | [***] | [***] | |||||||||
Market B |
[***] | [***] | [***] | |||||||||
Market C |
[***] | [***] | [***] | |||||||||
Executive Incentive for Market A |
[***] | |||||||||||
Grand Total |
[***] | [***] | [***] |
* | 18 months Warranty Included. | |
* | In the event of actual delivery of quantity BTS/Cell site(s) differ from the predetermined
quantity stated in “CAPEX & OPEX PRICING”, “Exhibit B Table 2: BTS/Cell Quantity Ratio” will be
applied as a reference to determine the actual BTS/Cell site(s) quantity. |
|
* | Should the actual delivery BTS/Cell site(s) exceed the quantity stated in “CAPEX & OPEX PRICING”, the additional BTS/Cell site(s) will be charged according to “Expansion Pricing”. | |
* | Should the actual delivery BTS/Cell site(s) be less than the quantity stated in “CAPEX & OPEX PRICING”, the remaining BTS/Cell site(s) can be used in other markets or their value can be used as a credit according to “Expansion Pricing”. | |
* | Should Cricket and a Company owned by Cricket (70% or more) contract and purchase from Huawei [***] million Covered Pops including the [***] market, then Cricket and Company will be provided incentives reducing the CAPEX price per Covered Pop to $[***]. | |
* | Should the actual market awards differ from this Cluster (Market A, B, & C), the Capex Per Covered POP “$[***]” and [***] Executive Incentive for Market A will be applied as long as (a) the awards include the Market A market, and (b) total awarded covered population is no less than [***]M, and (c) Covered POP per site is no less than [***], and (d) the penetration rate is no more than [***]%, and (e) average busy hour erlang per subscriber is no more than [***], and (f) the number of multi-carrier BTS is no more than [***]% of that of total BTS, and (g) total number of BTS covered per MSCe is no less than [***], total number of BTS covered per BSC is no less than [***] and total number of BTS per UMG is no less than [***] and (h) other configuration assumptions are same as “Cricket RF Design Reference” . |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Market A | Market B | Market C | Official Design | |||||
Vendor Awarded | Huawei | Huawei | Huawei | Huawei | ||||
License Type (REAG, EA, CMA)
|
[***] | [***] | [***] | [***] | ||||
Block (A, B, C, D, E)
|
[***] | [***] | [***] | [***] | ||||
Spectrum Available (10MHz or 20MHz)
|
[***] | [***] | [***] | [***] | ||||
Phase 2 POPs
|
[***] | [***] | [***] | [***] | ||||
Phase 2 BTSs
|
[***] | [***] | [***] | [***] | ||||
Phase 2 F1s
|
[***] | [***] | [***] | [***] | ||||
Phase 2 F2s
|
[***] | [***] | [***] | [***] | ||||
Phase 1 and 2 Total Covered Pops
|
[***] | [***] | [***] | [***] | ||||
Final Pops/Site
|
[***] | [***] | [***] | [***] | ||||
Total Sites
|
[***] | [***] | [***] | [***] | ||||
PCS-banded sites to offset clearing
|
[***] | [***] | [***] | [***] | ||||
F1s+ EVDO
|
[***] | [***] | [***] | [***] | ||||
F2s+ EVDO
|
[***] | [***] | [***] | [***] | ||||
F3s+ EVDO
|
[***] | [***] | [***] | [***] | ||||
F4s+ EVDO
|
[***] | [***] | [***] | [***] | ||||
F5s+ EVDO
|
[***] | [***] | [***] | [***] | ||||
6 Sector F2 BTSs+ EVDO
|
[***] | [***] | [***] | [***] | ||||
Total number of 1X Carriers beyond F1
|
[***] | [***] | [***] | [***] | ||||
% Multi-carrier
|
[***] | [***] | [***] | [***] |
Switch Location & Backhaul | ||||
Market | Vendor | Type | ||
A |
HU | [***] | ||
B |
HU | [***] | ||
C |
HU | [***] |
Engineering Details Market Specific |
||||||
Overal Sub Penetration
|
[***] | [***] | [***] | |||
mE Per Sub
|
[***] | [***] | [***] | |||
Engineering Details |
||||||
% Erlang overhead to run the switch/BSC at a [***]% of Max Capcity
|
[***] | |||||
Traffic distribution of Cricket.
Local call ratio
Long Distance Call ratio through Cricket VOIP network
Outgoing call ratio to other carriers
|
[***] | |||||
Prepaid user penetration:
|
[***] | |||||
Prepaid BHCA:
|
[***] | |||||
Prepaid Traffic/BH/SUB:
|
[***] | |||||
VMS User penetration rate:
|
[***] | |||||
VMS Traffic in VMS/BH/SUB:
|
[***] | |||||
SMS User penetration rate:
|
[***] | |||||
Number of SMS/BH/SUB(MO):
|
[***] | |||||
Number of SMS/BH/SUB(MT):
|
[***] | |||||
1X Data Usage:
|
[***] | |||||
Average 1x Data Hold time
|
[***] | |||||
WAP Portal ([***]% of $[***] rate plan takers use)
|
[***] | |||||
WAP Off Portal / Storefront (1 download / mo)
|
[***] | |||||
BREW Downloads ([***]% ringtones / graphics, [***]per mo)
|
[***] |
movie downloads: [***] at [***] MB per movie
music downloads: [***] at [***] MB per song
web page: [***] at [***] MB per web page
email: [***] at [***] MB per email
Sales Forecast = [***]
Subs @ [***]% = [***] subs, Subs @[***]% = [***]
• | web page: [***] @ [***] MB | |
• | email: [***] @ [***] MB per email | |
• | music download = [***] @ [***] MB per song | |
• | WAP/Brew hits = [***] @ [***] | |
• | Stream Video = [***] @ [***] MB |
Sales Forecast = [***]% Q108 and [***]% 3Q09
Subs @ [***]% = [***], Subs @ [***]% = [***]
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Exhibit D |
Category | AWS Value | Remarks | ||
Minimum Voice Erlang “Increment” |
[***] | |||
Cost per Voice Erlang “Increment” |
[***] | |||
Core Cost / Incremental BTS |
[***] | |||
Minimum Data MB “Increment” (in MB) |
[***] | |||
Cost per Data MB “Increment” |
[***] | |||
Growth Outdoor Macro 1X F1 (EVDO Rev. A, 128 CE) |
[***] | Outdoor Macro BTS comes with standard 4 hours backup | ||
Growth Outdoor Macro 1X F2 (EVDO Rev. A, 192 CE) |
[***] | Outdoor Macro BTS comes with standard 4 hours backup | ||
Growth Outdoor Macro 1X F3 (EVDO Rev. A, 256 CE) |
[***] | Outdoor Macro BTS comes with standard 4 hours backup | ||
Growth Outdoor Macro 1X F4 (EVDO Rev. A, 320 CE) |
[***] | Outdoor Macro BTS comes with standard 4 hours backup | ||
Growth Outdoor Macro 1X F5 (EVDO Rev. A, 384 CE) |
[***] | Outdoor Macro BTS comes with standard 4 hours backup | ||
Growth Indoor Macro 1X F1 (EVDO Rev. A, 128 CE) |
[***] | |||
Growth Indoor Macro 1X F2 (EVDO Rev. A, 192 CE) |
[***] | |||
Growth Indoor Macro 1X F3 (EVDO Rev. A, 256 CE) |
[***] | |||
Growth Indoor Macro 1X F4 (EVDO Rev. A, 320 CE) |
[***] | |||
Growth Indoor Macro 1X F5 (EVDO Rev. A, 384 CE) |
[***] | |||
Growth ODU 1X F1 |
[***] | ODU and one hour battery backup only, no baseband included | ||
Growth ODU 1X F2 |
[***] | ODU and one hour battery backup only, no baseband included | ||
Growth ODU 1X F3 |
[***] | ODU and one hour battery backup only, no baseband included | ||
Growth BBC (24ODU) |
[***] | BBC with 24 ODU connection capability(Total 1472 1x CE included, Support up to 9*F1 ODU, 9*F2 ODU, 6*F3 ODU) |
||
32 CE Card |
[***] | |||
64 CE Card |
[***] | |||
128 CE Card |
[***] | |||
192 CE Card |
[***] | |||
256 CE Card |
[***] | |||
F1-F2, F2-F3, F4-F5 Carrier Growth Kit (64 CE) |
[***] | |||
F3-F4 Carrier Growth Kit (64 CE) |
[***] | |||
Growth Battery Cabinet |
[***] | |||
Growth Battery (300AH) |
[***] |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Exhibit E |
Requirement for | ||||||||||||
peripheral network | Unit Price | |||||||||||
No | Feature ID | Basic Software | Delivery Type | entities | Unit | (USD) | ||||||
1 |
SWP-CMSCF-OSMS | Short Message Service (SMS) | Included | SMSC | Per 1k Service Subscriber | [***] | ||||||
2 |
SWP-CMSCF-VMS | Voice Mailbox Service | Included | VMS Server | Per 1k Service Subscriber | [***] | ||||||
3 |
SWP-CMSCF-CW | Call Waiting (CW) | Included | HLR | Per 1k Service Subscriber | [***] | ||||||
4 |
SWP-CMSCF-3WC | Three-Way Calling (3WC) | Included | HLR | Per 1k Service Subscriber | [***] | ||||||
5 |
SWP-CMSCF-DATA | Packet Data Serving Node (PDSN) | Included | Per 1k Service Subscriber | [***] | |||||||
6 |
SWP-CMSCF-CC | Conference Calling (CC) (Per 1k Service Subscriber) | Included | HLR | Per 1k Service Subscriber | [***] | ||||||
7 |
SWP-CMSCF-ICS | Incoming Call Screen(ICS)(Per 1k Service Subscriber) | Included | HLR | Per 1k Service Subscriber | [***] | ||||||
8 |
SWP-CMSCF-SIPT | SIP/SIP-T Protocol Interface ( Per 1k Service Subscriber) | Included | Per 1k Service Subscriber | [***] | |||||||
9 |
SWP-CMSCF-LI | Lawful Interception(Per Service Subscriber) | Included | CALEA | Per Service Subscriber | [***] | ||||||
10 |
SWP-CMSCF-MTC | Markov Test Call (Per MSC) | Included | Per MSC | [***] | |||||||
11 |
SWP-CMSCF-LTC | Loopback Test Call (Per MSC) | Included | Per MSC | [***] | |||||||
12 |
SWP-CMSCF-TRACE | Trace (Per 1k Service Subscriber) | Included | Per 1k Service Subscriber | [***] | |||||||
13 |
SWP-CMSCF-RMA | Remote Maintenance Agent(Per MSC) | Included | Per MSC | [***] | |||||||
14 |
SWP-CMSCF-OTASP | OTA Service Provisioning (OTASP)(Per 1k Service Subscriber) | Included | OTA Server, HLR | Per 1k Service Subscriber | [***] | ||||||
15 |
SWP-CMSCF-OTAPA | OTA Parameter Administration (OTAPA)(Per 1k Service Subscriber) | Included | OTA Server, HLR | Per 1k Service Subscriber | [***] | ||||||
16 |
SWP-CMSCF-NP | Wireless Number Portability(Per 1k Service Subscriber) | Included | Per 1k Service Subscriber | [***] | |||||||
17 |
SWP-CMSCF-E911 | E911 Emergency Call(Per 1k Service Subscriber) | Included | Per 1k Service Subscriber | [***] | |||||||
18 |
SWP-CMSCF-ATCD | Automatic Timed Call Disconnect(Per 1k Service Subscriber) | Included | Per 1k Service Subscriber | [***] | |||||||
19 |
SWP-CMSCF-TrFO/RTO | TrFO/RTO (Per 1k Service Subscriber) | Included | MGW, BSC | Per 1k Service Subscriber | [***] | ||||||
20 |
SWP-CMSCF-LSDH | LOAD SHARE Mode of Dual homing from MGW to MSCe (Per 1k Service Subscriber) | Included | Per 1k Service Subscriber | [***] | |||||||
21 |
SWP-CMSCF-SG | SG Function (Per MSC) | Included | Per MSC | [***] | |||||||
22 |
SWP-CMSCF-XXXX | Customized Operating System for Security(Per BAM) | Included | Per BAM | [***] | |||||||
23 |
SWP-CMSCF-CPT | Call Progress Tone (Per 1k Service Subscriber) | Included | Per 1k Service Subscriber | [***] | |||||||
24 |
SWP-CMSCF-VM | Virtual MSC (Per MSC) | Included | Per MSC | [***] | |||||||
25 |
SWP-CMSCF-TTY/TTD | TTY/TTD (Per 1k Service Subscriber) | Included | Per 1k Service Subscriber | [***] | |||||||
26 |
SWP-CMSCF-CT | Call Transfer (CT) (Per 1k Service Subscriber) | Included | HLR | Per 1k Service Subscriber | [***] | ||||||
27 |
SWP-CMSCF-DND | Do Not Disturb (DND) (Per 1k Service Subscriber) | Included | HLR | Per 1k Service Subscriber | [***] | ||||||
28 |
SWP-CMSCF-CRBT | Customized Ring Back Tone (CRBT) (Per 1k Service Subscriber) | Included with note3 | CRBT Server | Per 1k Service Subscriber | [***] | ||||||
29 |
SWP-CMSCF-PPC | Pre-Paid Charging (PPC) (Per 1k Service Subscriber) | Available | HLR, SCP | Per 1k Service Subscriber | [***] | ||||||
30 |
SWP-CMSCF-SMSBRO | Short Message Broadcast (Per 1k Service Subscriber) | Available | Broadcast Server | Per 1k Service Subscriber | [***] | ||||||
31 |
SWP-CMSCF-RFC | Remote Feature Control (Per 1k Service Subscriber) | Available | Per 1k Service Subscriber | [***] | |||||||
32 |
SWP-CMSCF-FPH | Free-Phone (FPH) (Per 1k Service Subscriber) | Available | HLR, SCP | Per 1k Service Subscriber | [***] | ||||||
33 |
SWP-CMSCF-VPDC | Voice and Packet Data Concurrent (VPDC)(Per 1k Service Subscriber) | Available | BSC, BTS, MS | Per 1k Service Subscriber | [***] | ||||||
34 |
SWP-CMSCF-2MSL | 1.544-Mbit/s Signaling Link(Per Link) | Available | Per Link | [***] | |||||||
35 |
SWP-CMSCF-ROAMB | Roaming Restriction (Per 1k Service Subscriber) | Available | Per 1k Service Subscriber | [***] | |||||||
36 |
SWP-CMSCF-CDAN | Call Delivery to Appointed Number (CDAN)(Per 1k Service Subscriber) | Available | Per 1k Service Subscriber | [***] | |||||||
37 |
SWP-CMSCF-USCF | USCF (Per 1k Service Subscriber) | Available | HLR/MS | Per 1k Service Subscriber | [***] | ||||||
38 |
SWP-CMSCF-ISPAGING | ISPAGING (Per 1k Service Subscriber) | included with note4 | MSC | Per 1k Service Subscriber | [***] | ||||||
39 |
SWP-CMSCF-MAH | MAH (Per 1k Service Subscriber) | Available | HLR | Per 1k Service Subscriber | [***] | ||||||
40 |
SWP-CMSCF-HB | Hot Billing (Per 1k Service Subscriber) | Available | HLR, Billing Platform | Per 1k Service Subscriber | [***] | ||||||
41 |
SWP-CMSCF-CAB | Call Attempt Xxxx (Per 1k Service Subscriber) | Available | Billing Platform | Per 1k Service Subscriber | [***] | ||||||
42 |
SWP-CMSCF-FL | Free Locking (Per 1k Service Subscriber) | Excluded | Huawei HLR | Per 1k Service Subscriber | [***] | ||||||
43 |
SWP-CMSCF-XXXXX | Subscriber PIN Access (XXXXX)) (Per 1k Service Subscriber) | Excluded | HLR | Per 1k Service Subscriber | [***] | ||||||
44 |
SWP-CMSCF-SPINI | Subscriber PIN Intercept (SPINI) (Per 1k Service Subscriber) | Excluded | HLR | Per 1k Service Subscriber | [***] | ||||||
45 |
SWP-CMSCF-MVPN | Mobile Virtual Private Network (MVPN) (Per 1k Service Subscriber) | Excluded | Huawei HLR, SCP | Per 1k Service Subscriber | [***] | ||||||
46 |
SWP-CMSCF-FreeCall | Temp-Credit Call(Per 1k Service Subscriber) | Excluded | SCP, Billing Center | Per 1k Service Subscriber | [***] | ||||||
47 |
SWP-CMSCF-AOC | Advice of Charge (AOC) (Per 1k Service Subscriber) | Excluded | Huawei SCP, Billing Center | Per 1k Service Subscriber | [***] | ||||||
48 |
SWP-CMSCF-PRC | Premiun Rate Charging (PRC) (Per 1k Service Subscriber) | Excluded | SCP, Billing Center | Per 1k Service Subscriber | [***] | ||||||
49 |
SWP-CMSCF-MTSCP | Mutliple Subscriber Number Based on SCP(Per 1k Service Subscriber) | Excluded | Per 1k Service Subscriber | [***] | |||||||
50 |
SWP-CMSCF-SIWF | SIWF (Per 1k Service Subscriber) | Excluded | IWF | Per 1k Service Subscriber | [***] | ||||||
51 |
SWP-CMSCF-CIWF | CIWF(Per 1k Service Subscriber) | Excluded | IWF | Per 1k Service Subscriber | [***] | ||||||
52 |
SWP-CMSCF-VPOP | Voice Call Precedence Over Active Packet Data Call (VPOP)(Per 1k Service Subscriber) | Included | Huawei BSC and HLR only. | Per 1k Service Subscriber | [***] | ||||||
53 |
SWP-CMSCF-V2F | Voice to Fax (Per 1k Service Subscriber) | Excluded | IWF | Per 1k Service Subscriber | [***] | ||||||
54 |
SWP-CMSCF-QOS | Data Service QoS (Per 1k Service Subscriber) | Excluded | Packet Data Subsystem | Per 1k Service Subscriber | [***] | ||||||
00 |
XXX-XXXXX-XXXX | XXX Function (Per Link) | Excluded | Per Link | [***] | |||||||
56 |
SWP-CMSCF-VMSP | Multi-Signaling Point (Per Direction) | Excluded | Per Direction | [***] | |||||||
57 |
SWP-CMSCF-ASDH | ACTIVE/STANDBY Mode of Dual homing from MGW to MSCe (Per 1k Service Subscriber) | Excluded | Per 1k Service Subscriber | [***] | |||||||
58 |
SWP-CMSCF-R2 | R2 Protocol Interface(Per 1k Service Subscriber) | Excluded | Per 1k Service Subscriber | [***] | |||||||
59 |
SWP-CMSCF-PRA | PRA Protocol Interface(Per 1k Service Subscriber) | Excluded | Per 1k Service Subscriber | [***] | |||||||
60 |
SWP-CMSCF-LBSCI | LBS (CELL-ID Based) (Per 1k Service Subscriber) | Available with Note4 | HLR, LBS Server | Per 1k Service Subscriber | [***] | ||||||
61 |
SWP-CMSCF-LBSLSE | Location Services Enhancements (PN-4747) (Per 1k Service Subscriber) | Available with Note4 | HLR, LBS Server | Per 1k Service Subscriber | [***] | ||||||
62 |
SWP-CMSCF-SRD | Specified Resource Diagnosis (Per MSC) | Excluded | Per MSC | [***] | |||||||
63 |
SWP-CMSCF-AOWADT | Automatic One-Way Audio Dialing Test (Per MSC) | Excluded | Per MSC | [***] | |||||||
64 |
SWP-CMSCF-SYSPATRON | SysPatron(Per BAM) | Excluded | Per BAM | [***] | |||||||
65 |
SWP-CMSCF-VCT | Vicious Call Trace(Per 1k Service Subscriber) | Available with Note4 | Huawei HLR only | Per 1k Service Subscriber | [***] | ||||||
66 |
SWP-CMSCF-RESTR | Enhanced Roaming Restriction (Per 1k Service Subscriber) | Excluded | Huawei HLR only | Per 1k Service Subscriber | [***] | ||||||
67 |
SWP-CMSCF-CS | Carrier Selection (Per 1k Service Subscriber) | Excluded | Huawei HLR only | Per 1k Service Subscriber | [***] | ||||||
68 |
SWP-CMSCF-ONLY | One Number Link You (ONLY) (Per 1k Service Subscriber) | Excluded | HLR | Per 1k Service Subscriber | [***] | ||||||
69 |
SWP-CMSCF-PL | Preferred Language (PL) (Per 1k Service Subscriber) | Excluded | HLR, SCP | Per 1k Service Subscriber | [***] | ||||||
70 |
SWP-CMSCF-EPACA | Enhanced Priority Access Channel Assignment (EPACA) (Per 1k Service Subscriber) | Excluded | Huawei BSC and HLR only. | Per 1k Service Subscriber | [***] | ||||||
71 |
SWP-CMSCF-WPP | Wireless Pay Phone (Per 1k Service Subscriber) | Excluded | Huawei HLR, Huawei SCP | Per 1k Service Subscriber | [***] | ||||||
72 |
SWP-CMSCF-OPOS | Overlay PPC to Other SSP (Per MSC) | Excluded | HLR | Per MSC | [***] | ||||||
73 |
SWP-CMSCF-SOCWI | SSP for CDMA WIN Incoming Overlay (Per MSC) | Excluded | WIN | Per MSC | [***] | ||||||
74 |
SWP-CMSCF-VP | Voice Privacy Function (Per 1k Service Subscriber) | Excluded | HLR, BSC, BTS, MS | Per 1k Service Subscriber | [***] | ||||||
75 |
SWP-CMSCF-NNAN | New Number Notification (Per 1k Service Subscriber) | Excluded | Huawei HLR only | Per 1k Service Subscriber | [***] | ||||||
76 |
SWP-CMSCF-WCN | Wireless Call Navigation (WCN)(Per 1k Service Subscriber) | Excluded | Huawei HLR only | Per 1k Service Subscriber | [***] | ||||||
77 |
SWP-CMSCF-FMC | Flexible Metering Charging (FMC)(Per 1k Service Subscriber) | Excluded | Metering charging platform | Per 1k Service Subscriber | [***] | ||||||
78 |
SWP-CMSCF-INIP | Built-in IP function (Per 1k Service Subscriber) | Excluded | Inteligent peripherial platform | Per 1k Service Subscriber | [***] | ||||||
79 |
SWP-CMSCF-IDIP | Independent IP function (Per 1k Service Subscriber) | Excluded | Inteligent peripherial platform | Per 1k Service Subscriber | [***] | ||||||
80 |
SWP-CMSCF-BYPASS | ByPass(Per 1k Service Subscriber) | Excluded | Per 1k Service Subscriber | [***] | |||||||
81 |
SWP-CMSCF-UZ | User Zone (Per 1k Service Subscriber) | Excluded | Per 1k Service Subscriber | [***] | |||||||
82 |
SWP-CMSCF-AH | Answer Hold (AH) (Per 1k Service Subscriber) | Excluded | Per 1k Service Subscriber | [***] | |||||||
83 |
SWP-CMSCF-RRUZID | Roaming restriction based on UZID authorized (Per 1k Service Subscriber) | Excluded | Per 1k Service Subscriber | [***] | |||||||
84 |
SWP-CMSCF-LBSSP | LoopBack SSP (Per 1k Service Subscriber) | Excluded | Per 1k Service Subscriber | [***] | |||||||
85 |
SWP-CMSCF-CT800 | CDMA CT800 Function (Per 1K Service Subscriber) | Excluded | Per 1k Service Subscriber | [***] |
1. | Definition of Software Delivery Type: |
Included - | Vendor Standard or optional Software, included in Initial System Configuration where the system capacity has been considered. |
Available - | Vendor Optional Software, not included in Initial System Configuration but available upon request in the future. Cricket get all “available” features license without software license fee. However Cricket is required to pay for any additional hardware expansion/upgrade should any of these feature(s) incurred expansion/upgrade due to increase of system performance and/or capacity. |
Excluded - | Vendor Optional Software, not included in Initial System Configuration. |
2. | Some features require additional hardware to support as stated in “Requirement for Peripheral Network Entities” column (e.g., SMS, VMS, XXX, XXXXX, X000, CRBT, etc). | |
3. | 2% subscribers capacity has been included in initial system. If beyong this penetration rate, Owner need to expand system capacity as per vendor’s recommendation | |
4. | If third parties’ platforms provide standard open interface, this feature is included. If there is any customized development, Owner need to pay for the cost based on the work hours |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Exhibit E |
Requirement for | ||||||||||||
peripheral | Unit Price | |||||||||||
No | Feature ID | Optional Software | Delivery Type | network entities | Unit | (USD) | ||||||
1 |
SWP-UMGV-TrFO | TrFO Function per k subs | Included | BSC | Per 1k Service Subscriber | [***] | ||||||
2 |
SWP-UMGVG-64SG | 64K MTP2/MTP3-M2UA/M3UA Signaling Gateway per Link | Included | MSCe | Per Link | [***] | ||||||
3 |
SWP-UMGVGT-DH | Dual Homing to VMSC\GMSC\TMSC Server(per k subs) | Included | Per 1k Service Subscriber | [***] | |||||||
4 |
SWP-UMGV-STLI | Lawful Interception per subs | Included | CALEA | Per Service Subscriber | [***] | ||||||
5 |
SWP-UMGVG-TRACE | Trace Management(per MGW) | Included | Per MGW | [***] | |||||||
6 |
SWP-UMGV-RTO | Remote Transcoder Operation (RTO)(per k subs) | Included | Per 1k Service Subscriber | [***] | |||||||
7 |
SWP-UMGV-VMGW | Virtual MGW (per virtual MGW) | Included | Per Virtual MGW | [***] | |||||||
8 |
SWP-UMGV-QOS | IP QoS speciality (per k subs) | Included | Per 1k Service Subscriber | [***] | |||||||
9 |
SWP-UMGVT-BFD | Bidirectional Forwarding Detection (BFD) (per MGW) | Included | Per MGW | [***] | |||||||
10 |
SWP-UMGV-Remote DialMainten | Remote Dialing Maintenance(per k subs) | Included | Per 1k Service Subscriber | [***] | |||||||
11 |
SWP-UMGV-A-IP | IP Transmission at A Interface(per k subs) | Included | BSC | Per 1k Service Subscriber | [***] | ||||||
12 |
SWP-UMGVG-TTY/TDD | TTY/TDD(TeleTYpe/Text telephone Devices for the Deaf)(per MGW) | Included | Per MGW | [***] | |||||||
13 |
SWP-UMGVGT-IPHC | IPHC (IP Header Compression) Function(per MGW) | Included | Per MGW | [***] | |||||||
14 |
SWP-UMGVGT-IPSG | Transmit IP Signaling(A1p/SIP-T/H.248/Sigtran)(per MGW) | Included | Per MGW | [***] | |||||||
00 |
XXX-XXXXX-XXXX XXX | ANSI MTP(per link) | Included | Per Link | [***] | |||||||
16 |
SWP-UMGVGT-IPOE1 | IP over T1/E1 function | Included | MGW, BSC | Per T1 | [***] | ||||||
17 |
SWP-UMGVG-2MSG | 1.544M MTP2/MTP3-M2UA/M3UA Signaling Gateway per Link | Available | Per Link | [***] | |||||||
18 |
SWP-UMGV-MPTY | MultiParty SS(MPTY) per subs | Excluded | Per Subscriber | [***] | |||||||
19 |
SWP-UMGV-IUA | IUA Protocol | Excluded | Per T1 | [***] | |||||||
20 |
SWP-UMGV-MCSTM | Satellite Transmission Mode | Excluded | Per T1 | [***] | |||||||
21 |
SWP-UMGVG-MicroTM | Microwave Transmission Mode | Excluded | Per T1 | [***] | |||||||
22 |
SWP-UMGV-PTIN | Playing of Tone for Intelligent Service per k subs | Excluded | SCP | Per 1k Service Subscriber | [***] | ||||||
23 |
SWP-UMGVGT-R2 | R2 Signaling | Excluded | Per T1 | [***] | |||||||
24 |
SWP-UMGV-R1.5 | Russia R1.5 Signaling | Excluded | Per T1 | [***] | |||||||
25 |
SWP-UMGVG-R2 | Adaptation to multinational R2 Signaling | Excluded | Per T1 | [***] | |||||||
26 |
SWP-UMGVG-R1 | R1 Signaling | Excluded | Per T1 | [***] | |||||||
27 |
SWP-MGW-IWF | IWF services Per 1K Service Subscriber | Excluded | IWF | Per 1k Service Subscriber | [***] | ||||||
28 |
SWP-UMGV-AMR | AMR(per k subs) | Excluded | Per 1k Service Subscriber | [***] | |||||||
29 |
SWP-UMGV-AMR2 | UMTS AMR2 per k subs | Excluded | Per 1k Service Subscriber | [***] |
1. | Definition of Software Delivery Type: |
Included - | Vendor Standard or optional Software, included in Initial System Configuration where the system capacity has been considered. |
Available - | Vendor Optional Software, not included in Initial System Configuration but available upon request in the future. Cricket get all “available” features license without software license fee. However Cricket is required to pay for any additional hardware expansion/upgrade should any of these feature(s) incurred expansion/upgrade due to increase of system performance and/or capacity. |
Excluded - | Vendor Optional Software, not included in Initial System Configuration. |
2. | Some features require additional hardware to support as stated in “Requirement for Peripheral Network Entities” column (e.g., SMS, VMS, OTA, CALEA, E911, CRBT, etc). |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Exhibit E |
Requirement for | ||||||||||||
peripheral network | Unit Price | |||||||||||
No | Feature ID | Optional Software | Delivery Type | entities | Unit | (USD) | ||||||
1 |
SWP-CBSCF-ALC | Automatic Level Control Per Service CH | Included | Per Service CH | [***] | |||||||
2 |
SWP-CBSCF-TTY/TTD | Teletype/Text Telephone Per Service CH | Included | Per Service CH | [***] | |||||||
3 |
SWP-CBSCF-TRACE | Signaling Tracing Per Service CH | Included | Per Service CH | [***] | |||||||
4 |
SWP-CBSCF-SH | Inter-CBSC Soft Handoff Per Service CH | Included | A3/A7 interface | Per Service CH | [***] | ||||||
5 |
SWP-CBSCF-QCS | Quasi-concurrent Service Per CH | Included | Per Service CH | [***] | |||||||
6 |
SWP-CBSCF-E911 | E911 Per Service CH | Included | Per Service CH | [***] | |||||||
7 |
SWP-CBSCF-TrFO/RTO | TrFO/RTO Per Service CH | Included | Per Service CH | [***] | |||||||
8 |
SWP-CBSCF-DO TRACE | Signaling Tracing Per DO Service CH | Included | Per DO Service CH | [***] | |||||||
9 |
SWP-CBSCF-InterQoS DO | Inter-User QoS Support Per DO Service CH | Included | Per DO Service CH | [***] | |||||||
10 |
SWP-CBSCF-AEC | AEC (Acoustic Echo Canceller) Per Service CH | Included | Per Service CH | [***] | |||||||
11 |
SWP-CBSCF-TFO | Tandem Free Option Per Service CH | Included | Per Service CH | [***] | |||||||
12 |
SWP-CBSCF-CMS | Clone MS Detection Per Service CH | Included | Per Service CH | [***] | |||||||
13 |
SWP-CBSCF-EFLT | EFLT-based Location Service Per Service CH | Included | Per Service CH | [***] | |||||||
14 |
SWP-CBSCF-InterQoS | Inter-User QoS Per Service CH | Included | Per Service CH | [***] | |||||||
15 |
SW-CBSCF-ATEE | ABIS Transmission Efficiency Enhancement Per Service CH | Included | Per Service CH | [***] | |||||||
16 |
SWP-CBSCF-AccChannelAuc DO | Access Channel Authentication Per DO Service CH | Included | Per DO Service CH | [***] | |||||||
17 |
SWP-CBSCF-DO IUQ | Intra-User Qos & Inter-user Qos Per DO Service CH | Included | Per DO Service CH | [***] | |||||||
18 |
SWP-CBSCF-DO VoIP | VoIP/Video Telephony Per DO Service CH | Included | Per DO Service CH | [***] | |||||||
19 |
SWP-CBSCF-VPOP | Voice Priority over Packet in EV-DO Per DO Service CH | Included | MS | Per DO Service CH | [***] | ||||||
20 |
SWP-CBSCF-DO TA | Test Application Per DO Service CH | Included | Per DO Service CH | [***] | |||||||
21 |
SWP-CBSCF-ST | Satellite Transmission Per T1 | Available | Per T1 | [***] | |||||||
22 |
SWP-CBSCF-FATM | Fractional ATM in Abis interface Per Service CH | Excluded | Per Service CH | [***] | |||||||
23 |
SWP-CBSCF-FAX | G3 FAX Per Service CH | Excluded | IWF | Per Service CH | [***] | ||||||
24 |
SWP-CBSCF-IWF | Asynchronous data Per Service CH | Excluded | IWF | Per Service CH | [***] | ||||||
25 |
SWP-CBSCF-VP | Voice Privacy in Air Interface Per Service CH | Excluded | BTS/MS | Per Service CH | [***] | ||||||
26 |
SWP-CBSCF-PTT | Push to Talk Per Service CH | Excluded | Huawei only PTT Platform and MS impact | Per Service CH | [***] | ||||||
27 |
SWP-CBSCF-1xRelA | 1xRelA Support Per Service CH | Excluded | Per Service CH | [***] | |||||||
28 |
SWP-CBSCF-BMCS DO | Broadcast and Multicast Service Per DO Service CH | Excluded | BCMCS | Per DO Service CH | [***] |
1. | Definition of Software Delivery Type: |
Included - | Vendor Standard or optional Software, included in Initial System Configuration where the system capacity has been considered. |
Available - | Vendor Optional Software, not included in Initial System Configuration but available upon request in the future. Cricket get all “available” features license without software license fee. However Cricket is required to pay for any additional hardware expansion/upgrade should any of these feature(s) incurred expansion/upgrade due to increase of system performance and/or capacity. |
Excluded - | Vendor Optional Software, not included in Initial System Configuration. |
2. | Some features require additional hardware to support as stated in “Requirement for Peripheral Network Entities” column (e.g., SMS, VMS, OTA, CALEA, E911, CRBT, etc). |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Exhibit E |
Requirement for | ||||||||||||
peripheral network | ||||||||||||
No | Feature ID | Optional Software | Delivery Type | entities | Unit | Unit Price (USD) | ||||||
1 |
SWP-M2000-CPRS | Customizable reports system Per NE | Included | Per NE | [***] | |||||||
2 |
SWP-M2000-CORBA | CORBA Alarm Interfaces per NE | Included | Per NE | [***] | |||||||
3 |
SWP-File-Performance | File Performance Interface per NE | Included | Per NE | [***] | |||||||
4 |
SWP-File-Configuration | File Configuration Interface per NE | Included | Per NE | [***] | |||||||
5 |
SWP-File-Alarm | File Alarm Interface per NE | Included | Per NE | [***] | |||||||
6 |
SWP-Alarm Streaming | Alarm Streaming Interface per NE | Included | Per NE | [***] | |||||||
7 |
SWP-SNMP-Alarm | SNMP Alarm Interface per NE | Included | Per NE | [***] | |||||||
8 |
SWP-Vector-Map | Support Vector Map On Topology | Included | Per Function | [***] |
1. | Definition of Software Delivery Type: |
Included - | Vendor Standard or optional Software, included in Initial System Configuration where the system capacity has been considered. |
Available - | Vendor Optional Software, not included in Initial System Configuration but available upon request in the future. Cricket get all “available” features license without software license fee. However Cricket is required to pay for any additional hardware expansion/upgrade should any of these feature(s) incurred expansion/upgrade due to increase of system performance and/or capacity. |
Excluded - | Vendor Optional Software, not included in Initial System Configuration. |
2. | Some features require additional hardware to support as stated in “Requirement for Peripheral Network Entities” column (e.g., SMS, VMS, OTA, CALEA, E911, CRBT, etc). |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
1 OF 33 PAGES
TABLE OF CONTENTS | 2 | |||||
1 | EXECUTIVE SUMMARY |
5 | ||||
1.1 | Overview |
5 | ||||
1.2 | Summary of Services |
5 | ||||
2 | TECHNICAL SERVICES |
6 | ||||
3 | TECHNICAL SUPPORT SERVICE |
6 | ||||
3.1 | Brief Introduction |
6 | ||||
3.2 | TAC Service Support |
7 | ||||
3.2.1 | Helpdesk |
7 | ||||
3.2.2 | Remote Access Diagnosis |
9 | ||||
3.2.3 | Web-based Support |
9 | ||||
3.2.4 | On-Site Support |
9 | ||||
3.2.5 | On-Site Emergency Service |
10 | ||||
3.2.6 | Routine Check |
11 | ||||
3.3 | Software Update |
11 | ||||
3.3.1 | General |
11 | ||||
3.3.2 | Documentation |
12 | ||||
3.3.3 | Implementation |
12 | ||||
3.4 | Equipment Support |
13 | ||||
3.4.1 | Spare Parts Management Structure |
13 | ||||
3.4.2 | Service Options |
14 | ||||
· | Repair and Return |
14 |
2 OF 33 PAGES
· | Local Swapping |
15 | ||||
· | Advance Replacement |
15 | ||||
3.4.3 | Turn Around Time |
16 | ||||
3.5 | Training |
16 | ||||
4 | SERVICE LEVEL AGREEMENT |
17 | ||||
4.1 | Definitions |
17 | ||||
4.2 | Service Level Agreement |
17 | ||||
5 | ENHANCED SERVICES (OPTIONAL) |
18 | ||||
5.1 | Network Optimization |
18 | ||||
5.2 | Equipment Relocation |
19 | ||||
5.3 | Software feature Upgrade |
19 | ||||
5.4 | Equipment Renovation |
20 | ||||
5.5 | Skilled Engineer On-Site |
20 | ||||
6 | PRICING |
22 | ||||
6.1 | Pricing Philosophy |
22 | ||||
6.2 | Service Package Price (Technical Service & Support OPEX) |
23 | ||||
u | On-Site Support Service Pricing |
23 | ||||
u | On-Site Emergency Support Service |
23 | ||||
u | Advance Replacement |
24 | ||||
6.3 | Global Service Support Organization |
24 | ||||
6.4 | Local Service Support Organization |
25 | ||||
7 | ANNEX1 CUSTOMER REQUESTS HANDLING PROCEDURE |
28 |
3 OF 33 PAGES
8 | ANNEX2 RMA PROCEDURE |
31 | ||||
8.1 | Terms and Definitions |
31 | ||||
8.2 | RMA Procedure |
31 |
4 OF 33 PAGES
1 | Executive Summary | |
1.1 | Overview | |
Vendor service strategy for customers aims at a quick and effective response in case of a malfunction of either the Equipment or Software as well as at the provisioning of professional solutions based on the knowledge of central competence centers. | ||
1.2 | Summary of Services | |
The services described in this Exhibit are focused on Equipment/Software fault preventive and corrective actions in support of Owner during the operation phase of the Network. The detailed scope of services is defined in the succeeding sections. |
• | TAC Service (See Section 3.2) | ||
• | Software Update (See Section 3.3) | ||
• | Equipment Support (See Section 3.4) | ||
• | Training (See Section 3.5) | ||
• | Enhanced Services (See Section 5) |
5 OF 33 PAGES
2 | Technical Services | |
Vendor commits to make all reasonable efforts to maintain optimum system performance. | ||
The services covered by Vendor, at no charge during the Warranty Period, consist of the following: |
• | TAC Service (including Help desk 7x24, Web based support, Remote Diagnosis and Routine Check) |
• | Software Update | ||
• | Equipment Support (7-day Local Swapping) | ||
• | All Services described in the Agreement with respect to any Warranty Period. |
3 | TECHNICAL SUPPORT SERVICE | |
3.1 | Brief Introduction | |
The main objective of Vendor Technical Support Service offering is to keep the system running to specification operational levels and in case of network failures, to restore the system to those same operational levels as soon as possible. | ||
The following support services are offered to Owner: |
1) | Technical Assistance Center (TAC) Support Service |
Ø | Help Desk | ||
Ø | Remote Access Diagnosis |
6 OF 33 PAGES
Ø | Web-based Support | ||
Ø | On-Site Support (optional service for an additional charge) | ||
Ø | Routine Check | ||
Ø | Emergency Service (optional service for an additional charge) |
2) | Software Update | ||
3) | Equipment Support |
Ø | Repair and Return | ||
Ø | Local Swapping | ||
Ø | Advance Replacement |
4) | Training |
3.2 | TAC Service Support | |
TAC support takes place in the event of a fault or problem caused by the Equipment and/or Software, and provides operation and maintenance assistance in order to rectify the problem in a timely and efficient manner. | ||
Following contact with the TSD and/or receipt of a fault report, Vendor shall provide: |
• | Consultation for daily operation and maintenance, equipment running prompts, equipment functions and configuration, networking characteristics, and equipment structure. | ||
• | Assistance and/or implementation on analyzing, diagnosing, and setting priorities for dealing with the problems; | ||
• | Assistance and/or implementation on corrective measures; | ||
• | Generate a resolution report. |
3.2.1 | Helpdesk | |
The Helpdesk provides via telephone, fax, and/or e-mail, a convenient way to consult 7x24 (24 hours a day, 7 days a week, 365 days a year) with trained |
7 OF 33 PAGES
professionals on specific maintenance problems, solve network faults, and provide efficient know-how and experience to Owner. Reported problems will be addressed on a priority basis, and will be quickly and competently responded and resolved within a defined Service Level Agreement time period. Vendor will remain in contact with Owner until the problem has been fully resolved. | ||
Local TSD location: Plano, Texas, USA | ||
The Hotline number: 1-877-4HUAWEI or 0-000-000-0000 | ||
Email: xxxxxxxxxxx.xxx@Xxxxxx.xxx | ||
The intent of the Helpdesk is: |
• | Establish priorities upon receipt of the problem report to set the wheels in motion to resolve the problem; | ||
• | Provide consultation service for daily operation and maintenance, equipment running prompts, equipment functions and configuration, networking characteristics and equipment structure; | ||
• | Provide advice and assistance in analyzing, diagnosing, locating and isolating the problem; | ||
• | Assist and instruct the Owner in generating solutions to the problem; | ||
• | Provide advice on the implementation of corrective measures; | ||
• | Facilitate Remote Access Diagnosis where a fault or a problem can not be resolved by telephone recommendation (Helpdesk); |
If technical problems occur, Owner is encouraged to contact the Vendor Local TSD, and provide a detailed problem description, service request time, contact person, contact times, and any other relevant information. | ||
Owner is requested to provide prompt feed back to Vendor as to the effectiveness of the solution, in such a manner that Vendor can determine if other services are needed. |
8 OF 33 PAGES
3.2.2 | Remote Access Diagnosis | |
In the case that the Helpdesk can not effectively solve the Equipment problems, Vendor will provide, with Owner’s permission, Remote Access Diagnosis. | ||
During the Remote Access Diagnosis process, Vendor engineers will either dial-up or connect via IP provided connection the target equipment, performing diagnosis and providing the appropriate solutions. Owner shall make any necessary connectivity arrangements and provide assistance according to the requirements presented by Vendor, and provide feedback on the effectiveness of the solution. | ||
If the solution requires On-Site support, Owner has the option of requesting said On-Site Support service, for an additional charge, performed by a Vendor engineer. There is no charge, however, when these services are required to satisfy obligations of the Agreement. | ||
3.2.3 | Web-based Support | |
Vendor website will allow Owner to access the latest Vendor products’ maintenance information and procedures, such as preventative steps necessaries for Equipment maintenance, acquire the latest product knowledge and download product new releases, case studies, past experiences, Software patches, recommendations and notices. | ||
Vendor Online Trouble Ticket System (GCRMS) encourages Owner to submit requests for Technical Support Services and enables Owner to track progress on the resolution of trouble ticket, online. | ||
Vendor will provide email notification of product bulletins and alerts. | ||
3.2.4 | On-Site Support | |
Upon receipt of Owner’s approval and based on the established Service Level Agreement between Owner and Vendor, Vendor will initiate its On-Site Support service. During their presence on Site, the Vendor engineer(s) shall be continuously assisted by Owner’s Vendor product trained representative. | ||
Owner is responsible for making spare parts available at Sites either for day-to-day operation, maintenance performed by its own staff, or for authorized support activities performed by the Vendor engineer(s). |
9 OF 33 PAGES
At the end of each service performed on Site, an On-Site Support Service Report will be completed and signed by the Vendor engineer, and co-signed by the Owner’s representative. This report will document the tasks performed, the time spent and the recommendations provided by the Vendor engineer. | ||
The departure time of the engineer from the actual base is defined by the response time quoted in Section 4.2 Service Level Agreement | ||
As these interventions are mainly to cope with urgent matters of maintenance, the engineer’s work will prioritize at restoring the system to acceptable conditions. This means that some technical studies may be carried out after completion of the intervention via Remote Access Diagnosis. | ||
On-Site support is available during business hours, Monday to Friday. Owner is requested to schedule on-Site service with Vendor, prior to dispatch Vendor expert to the Owner Site. For non scheduled interventions or emergency situations, Owner has the option to request the Emergency Service. | ||
On-Site support is a value-added service available to Owner for an additional charge and subject to schedule. There is no charge, however, when these services are required to satisfy obligations of the Agreement. | ||
3.2.5 | On-Site Emergency Service | |
In critical operating situations where system availability is seriously affected, an On-Site Emergency Service is available to Owner 24 hours a day, 7 days a week. The main objective of this service is to keep the system running or, in case of a failure, to restore the system to an operational level as soon as possible. This service may also be utilized to restore operations and support systems that are critical to provisioning, billing, and customer service functions. For this purpose, even operational restrictions are acceptable in order to prevent a loss of service to Owner. | ||
Emergency | ||
“Emergency” means a critical and acute operating situation that caused, or that has the potential to cause, a considerable and intolerable service, or management restrictions. | ||
Definition of typical emergencies: |
• | Total outage of a system, service interruption, lost of redundancy |
10 OF 33 PAGES
• | Partial outage of a system with considerable restrictions to subscribers. “Considerable restrictions” is the situation when the capacity (available ports) of resources, is lower or equal to 50 percent for each Network Element | ||
• | Total outage of the management system | ||
• | Loss of billing data | ||
• | Loss of subscriber registration, or activation capability | ||
• | Other emergencies defined by Owner and agreed by the parties. |
Emergency Service is a value-added service available to Owner upon request for an additional charge. There is no charge, however, when these services are required to satisfy obligations of the Agreement. In the case where the Emergency Service is required to resolve an emergency within the Vendor’s Span of Control, there is no charge to the Owner. | ||
3.2.6 | Routine Check | |
To ensure Equipment and systems are operating at peak performance, Vendor assigns engineers to conduct On-Site Equipment health checks two times a year, and telephone health checks four times a year. In this case, Owner should provide necessary assistance for these On-Site health checks, such as permission to access the Owner’s Equipment and Sites. | ||
Such preventative maintenance activities shall be scheduled or requested at least fifteen (15) days in advance. The Equipment list to be reviewed, and the measure of On-Site or remote access via OSS, should be confirmed by both parties. | ||
3.3 | Software Update | |
3.3.1 | General | |
Vendor shall provide the Owner with the Software Update Service. | ||
Vendor agrees to continuously develop and improve the operation and quality of our Software releases delivered to Owner. This service includes timely updates and corrections of errors reported by Owner, as well as from other users, or those detected by Vendor (as in preventive maintenance). Vendor will deliver, normally once a year, corrections, enhancements, and modifications to |
11 OF 33 PAGES
the Software release in the form of Software Update covering one or more of the Software releases included in Owner’s network. The Software Update does not include issuing new Software releases for new functionality provision. | ||
Additional required Software Update documentation shall be provided to Owner free of charge. | ||
Any modifications to the network and its procedures, connected to technical support activities shall be agreed by both parties (e.g., approval or rejection, time schedule, responsibility matrix and other). Vendor will install no more than two Software Updates per year, not including any Software Updates that Owner requests Vendor to install. . | ||
3.3.2 | Documentation | |
Updated documentation describing the corrections, enhancements and/or improved functionalities provided, shall accompany any Software Update supplied. | ||
Generally, provided documentation should contain the following information: |
• | Previous version Software bugs removed, if any, | ||
• | Current Software bugs, as far as it is known by Vendor at the time of delivery to Owner, and the preventive rules on how to treat these bugs. |
“Bugs” are defined as the undesirable glitches or results that adversely affect smooth operations, usually originating in Software or undocumented features. | ||
3.3.3 | Implementation | |
The parties shall agree on the implementation details five (5) working days before the implementation of each Software Update. | ||
If Owner performs the Software Update implementation, Vendor’s technical personnel is available at Owner’s request to supervise the implementation of the Software Update, for a reasonable number of Sites. The number of Vendor’s personnel involved and their roles and location during the Software Update shall be agreed between the parties before such implementation. | ||
If Vendor recommends and Owner agrees, the Software Update can be performed by Vendor. The acceptance procedure of the Software Update shall be agreed by both parties, if needed, before the implementation. |
12 OF 33 PAGES
The implemented Software Update shall be tested and an acceptance procedure carried out by Owner in accordance with the agreed acceptance procedure. Owner can skip the acceptance testing in total or partly, if Owner decides that such procedure is not required. In that case, both parties shall automatically sign the acceptance certificate. | ||
Owner can determine, at its own discretion, the Software Update implementation, as well as the schedule. | ||
3.4 | Equipment Support | |
3.4.1 | Spare Parts Management Structure | |
The Spare Part Center is located in Dallas, Texas. |
Headquarters Spare Parts Center | |||
• | Supplies stock to regional and local spare parts centers. | ||
• | Repair or Replaces Faulty units, | ||
• | Provides the strategy for Spare parts purchases, | ||
• | Enforces Supply chain optimization, | ||
• | Provides Spare parts quality control, | ||
Regional Spare Parts Center | |||
• | Accommodates and distributes stock between Local Spare Parts Centers in the region | ||
• | Support local spare parts centers during an emergency. | ||
Local Spare Parts Center | |||
• | Provides a single point of contact for services to its customers | ||
• | Provides Local Spares Swapping service to its customers |
13 OF 33 PAGES
3.4.2 | Service Options | |
Vendor Equipment Repair and Replacement Services are intended to offer Owner, with the following service options: |
• | Repair and Return | ||
• | Local Swapping | ||
• | Advance Replacement |
● | Repair and Return | |
When a faulty part needs to be repaired, the Owner can request our Repair and Return Service. | ||
Under Agreement, Owner shall send the faulty part(s) to the specified place according to the contract agreed to by both parties. | ||
The Vendor Spare Parts Center will process the faulty part within three (3) business days after receiving the Repair-and-Return service request from the Owner’s authorized representative. Vendor at its option can repair or replace the faulty part. The repaired or replaced spare part(s) of the same model will be shipped from Vendor within 45 calendar days after receiving the faulty part(s) from Owner. The service hours of the Vendor Local Spare Parts Center are from 9:00am to 6:00pm CST, during business days. | ||
Subject to Section 16 of the Agreement, Owner is responsible for sending the faulty part(s) to the Vendor Spare Parts Center. Owner will bear all freight charges and other local associated fees for shipping all such shipments from the Owner Site to Vendor’s facility. Vendor will ship the repaired or replaced part back to the Owner, and Vendor will bear with this returning freight charge. | ||
Repair and Return service is available to Owner at no charge during the Warranty Period. |
14 OF 33 PAGES
● | Local Swapping | |
There are times when the standard 45-day turn around time for repaired cards will not suffice. For those situations, Vendor offers a Local Parts Swapping Service. Compared to our standard repair and return offering, the Vendor Local Swapping Service offers several advantages, as well as assures the Owner with the following benefits: |
• | Quicker turn-around time minimizes service outage times. | ||
• | Avoidance of maintaining a large spare parts inventory. The investment in spare parts and operation costs, such as storage expenses, logistics and personnel, can be reduced dramatically |
Under the Local Swapping Service, Vendor Local Spare Parts Center will process the requested unit(s) within one (1) business day, after receiving the Local Swapping service request in writing from the Owner’s authorized representative. The repaired or replaced spare parts of the same model will be shipped to Owner’s designated facility within seven (7) calendar days beginning when Vendor receives the faulty part(s) from Owner. | ||
Owner bears the cost of sending the faulty units to the Local Spare Parts Center; Vendor will bear the costs of delivering the replaced parts back to Owner. | ||
Local Swapping service is available to Owner at no charge during the Warranty Period, from Monday to Friday, 9am to 6pm, CST. | ||
● | Advance Replacement | |
Under Advance Replacement, Vendor will process the advanced replacement part(s) within the next four (4) business hours after receiving a confirmed service request from the Owner, provided that the Owner agrees to return the original faulty part(s) to the Vendor Spare Parts Center within 15 calendar days. | ||
If the Owner sends the request before 2:00pm (Central Time) during a business day, the replaced part will be shipped in the same day. The replaced spare part(s) of the same model is expected to arrive, to Owner’s designated facility, the next business day. |
15 OF 33 PAGES
Advance Replacement service is available 24 hours a day, 7 days a week. | ||
Owner bears the cost of sending the faulty units to the Local Spare Parts Center; Vendor will bear the costs of delivering the replaced parts back to Owner. | ||
Advancement Replacement service is available to Owner at an extra charge from Monday to Friday, 9am to 6pm CST. | ||
3.4.3 | Turn Around Time | |
Repaired or replacement parts will be delivered to the Owner’s warehouse within the specified timeframe, as follows: |
• | Repair and Return: 45 calendar days | ||
• | Local Swapping: 7 calendar days | ||
• | Advance Replacement: 1 business day |
RMA | ||||||||
Equipment | Processing | Part Shipment | Available | |||||
Support | Time | Time | Availability | days | ||||
Repair and
Return
|
3 Business days | 45 Calendar days | Monday - Friday 09h00 ~ 18h00 |
5 days a week | ||||
Local Swapping | 1 Business day | 7 Calendar days | Monday - Friday 09h00 ~ 18h00 |
5 days a week | ||||
Advance Replacement | 4 Business hours | 1 Business day | 7 days 00h00 ~ 24h00 |
7 days a week |
3.5 | Training | |
Vendor will provide various training services related to the daily maintenance of the Owner’s Equipment to enhance the maintenance level of the Owner. The training options include regional short-term centralized training at Owner’s premise or at Vendor’s facility. The courses cover computer and database, telecom network and product knowledge of Vendor Equipment. |
16 OF 33 PAGES
Vendor will provide regional short-term centralized training for Owner either at Site or at the Vendor regional training center in Plano Texas, according to contractual requirements. The content of training is focused on the daily maintenance and operation, including handling of daily faults and introduction of equipment functions. The target audience of this training is the Owner’s Equipment maintenance and operations personnel. | ||
Specific training commitments are contained in Exhibit H. | ||
4 | Service Level Agreement | |
4.1 | Definitions | |
“Response Time” shall mean the time measured between the call from the Owner, received by Vendor, and the time of the first telephone reply by one of Vendor experts. | ||
“Departure time” shall mean the time between the receipt of the request from the Owner, for an On-Site intervention by Vendor, and the time when the Vendor expert is dispatched to the Owner’s Site. The traveling time is excluded. | ||
“Resolution Time” shall mean the time measured between the call from the Owner, received by Vendor, and the time when the problem is definitively remedied. | ||
4.2 | Service Level Agreement | |
“Service Level Agreement” shall mean the level of service which the Owner purchases from Vendor with respect to the maintenance and technical support services. |
Services | Support | |||
Service availability language |
English | |||
Emergency Service availability period |
7 days x 24 hours | |||
On-Site support availability period |
8 hours x 5 days (subject to schedule) | |||
Severity Level | ||||
Critical (S1) | Major (S2) | Minor (S3) |
17 OF 33 PAGES
Severity Level | ||||||
Critical (S1) | Major (S2) | Minor(S3) | ||||
Response Time
|
Within 15min | Within 60min | Within 120min | |||
Departure time (On-Site Service is needed) |
4 hours | Next business day | Scheduled | |||
Target Issue Resolution Time |
Within 8 hours | Within 3 days | Within 30 days | |||
Final Issue Resolution Time (Without Software Defect) |
Within 24 hours | Within 12 days | Within 60 days | |||
Final Resolution Time
|
30 days permanent fix | 60 days permanent fix | 180 days | |||
(With Software Defect)
|
permanent fix |
• | 85% of problems of each level of severity reported to Vendor TSD are solved before Target Issue Resolution. | ||
• | 100% of problems of each level of severity reported to Vendor TSD are solved before Final Issue Resolution. |
If the On-Site Service is requested, the traveling time is excluded from the resolution time mentioned above, and is defined according to the distance as follows: |
Distance | Traveling time | |
Less than 30 miles | 2 hours | |
31 miles ~ 60 miles | 4 hours | |
61 miles ~ 120 miles | 6 hours | |
121 miles ~ 240 miles | 8 hours | |
More than 240 miles | Next day |
5 | Enhanced Services (optional) | |
5.1 | Network Optimization | |
Vendor will provide a network optimization plan to Owner to help the Owner improve the quality and results of network operation. | ||
Vendor will arrange maintenance experts to provide a network optimization service. The result of the network optimization service (such as network connection rate) will be jointly confirmed by Vendor and Owner. |
18 OF 33 PAGES
5.2 | Equipment Relocation | |
Vendor will provide the services of Equipment relocation, including the design of an Equipment relocation plan, Equipment dismantling, installation and technical guidance at the Site of Equipment relocation to minimize the risk of Equipment damage that may be incurred during the Equipment relocation. | ||
Design of Equipment relocation plan | ||
Vendor will provide design plans for Equipment dismantling and installation. | ||
Equipment dismantling | ||
Vendor will arrange technical personnel to assist Owner in dismantling the Equipment according to the design plan of Equipment relocation. | ||
Equipment installation | ||
Vendor will arrange technical personnel to install and test the dismantled Equipment and assist the Owner in putting the Equipment into operation. | ||
Equipment Relocation Guidance On-Site | ||
Vendor will arrange technical personnel to provide technical guide at the Equipment Site during the Equipment relocation. | ||
5.3 | Software feature Upgrade | |
When necessary, Vendor will appoint a technical expert to provide Software Upgrade services and optimize the Software structure to utilize any new functions requested by Owner. | ||
The time of any Software Upgrade will be jointly confirmed by Vendor and Owner, under the premise of not affecting the normal business of Owner. This includes the following: |
• | New Software feature releases |
19 OF 33 PAGES
• | Release notes outlining new features, Software modifications and upgrade/installation procedures |
The following are guidelines for Vendor Software Maintenance service: |
• | Vendor will notify the Owner of all generally available Software releases. | ||
• | Release notes outlining Software modifications, known deficiencies, and upgrade/installation procedures are provided as part of the service. | ||
• | Customer documentation updates, if applicable, are provided as part of the service. | ||
• | Vendor will provide revision and enhancement release information, relating to availability of code corrections, work-around procedures and limitations of covered products. | ||
• | This service is exclusive of the labor cost for executing the upgrade. This will be made available at Vendor’s then-current prices subject to Section 5.1 of the Agreement. |
5.4 | Equipment Renovation | |
Vendor will provide an Equipment renovation service to Owner upon the Owner’s stated intent for capacity expansion, new functions, network optimization, and keeping up with the development of new technology. | ||
Vendor will arrange senior experts to provide the service of Equipment renovation. The plan of Equipment renovation will jointly be confirmed by Vendor and Owner. | ||
5.5 | Skilled Engineer On-Site | |
When the Owner has a special situation (such as an important event day or holiday) preventing their own craftspeople from performing a specific engineering task and a schedule to meet, Vendor will send its own engineers to the Equipment Site and assist the Owner by performing the contracted engineering tasks while maintaining strict confidentiality regarding Site content. |
20 OF 33 PAGES
On duty Vendor engineers are readily available to provide services such as technical support, technical consultation and daily maintenance, at the Equipment Site. |
21 OF 33 PAGES
6 | Pricing | |
6.1 | Pricing Philosophy |
Technical Support Services | Service Package for Owner | |||
TAC Service
|
Help Desk (7X24 ) | Ö | ||
Remote Diagnostic | Ö | |||
Web based Support | Ö | |||
On-Site Support | Available upon request after Final Acceptance | |||
On-Site Emergency Support | Available upon request after Final Acceptance | |||
Routine Check | Ö | |||
Software Support
|
Software Updates | Ö | ||
Equipment Support
|
45 Day Repair and Return | Ö | ||
7 Day Local Swapping | Ö | |||
1 Day Advance Replacement | Available upon request | |||
Enhanced Service
|
Customer Tailored Service | Available upon request |
No Charge: |
• | At the initial Markets the Service Package for Owner described above will be provided to the Owner, at no charge during the Warranty Period. | ||
• | For test bed product, the service package for Owner described above will be provided to the Owner at no charge. | ||
• | Additionally, On-Site support and On-Site Emergency support will be provided to Owner as necessary at all times up to Final Acceptance and during the Warranty Period as described in Section 16.3 of the Agreement. After Final Acceptance of a System, On-Site support, On-Site Emergency Service, 1-day Advance Replacement, and Enhanced Services, are available to the Owner for an additional charge except all is available at no charge to the Owner as described in Section 16.3 of the Agreement. |
22 OF 33 PAGES
Labour Hourly Rate: | ||
The following event based services will be billed at an hourly rate. |
• | On-Site Support Service | ||
• | On-Site Emergency Support Service |
6.2 | Service Package Price (Technical Service & Support OPEX) | |
Annual fees for the Service package begin after the Warranty Period expires. The annual fees for the Service package of the initial markets are calculated on a per-covered-pop basis at $0.34 USD per year. | ||
On-Site Support Service pricing for the initial markets and test bed | ||
$100/hour plus expenses* (Normal Working Hours) | ||
$150/hour plus expenses* (Out of Normal Working Hours) | ||
On-Site support service will be charged for a minimum of 8 hours, per visit | ||
Normal Working Hours mean 9:00 am — 6:00 pm, Local Time | ||
Out of Normal Working Hours, 6:00 pm — 9:00 am, Local Time |
* | Expenses include: Accommodation, meals, and transportation. |
u | On-Site Emergency Support Service for the initial markets and test bed | |
$160/hour plus expenses* (Normal Working Hours) | ||
$240/hour plus expenses* (Out of Normal Working Hours) | ||
Emergency support service will be charged for a minimum of 8 hours, per visit | ||
Normal Working Hours mean 9:00 am — 6:00 pm, Local Time | ||
Out of Normal Working Hours, 6:00 pm — 9:00 am, Local Time |
* | Expenses include: Accommodation, meals, and transportation. |
23 OF 33 PAGES
u | Advance Replacement for the initial markets and test bed | |
Under Advance Replacement, Vendor will process the advanced replacement part(s) within the next four (4) business hours after receiving a confirmed service request from the Owner, provided that the Owner agrees to return the original faulty part(s) to the Vendor Spare Parts Center within 15 calendar days. | ||
If the Owner sends the request before 2:00 pm (Central Time) during a business day, the replaced part will be shipped in the same day. The replaced spare part(s) of the same model is expected to arrive, to Owner’s designated facility, the next business day. | ||
Vendor bears the cost of sending the faulty units to the Local Spare Parts Center; Vendor will bear the costs of delivering the replaced parts back to Owner. | ||
Advance Replacement service is available to Customers and an extra charge of $166.00 US for shipments of 10 pounds or less from Monday to Friday, 9am to 6pm CST. | ||
Advance Replacement service out of normal business hours is available 24 hours a day, 7 days a week for an additional fee of $75.00. | ||
6.3 | Global Service Support Organization | |
In order to support its global operations Vendor has set up a 3-level global service network: the Headquarters, the Regional Divisions, and the Local branch offices. | ||
Vendor’s headquarters is located in Shenzhen China. Vendor Regional offices are located in North America; Latin America; CIS (the Commonwealth of Independent States), Europe, North Africa & Middle East; Southern Africa, East Pacific, and Asia Pacific. | ||
The global customer service system contains a three-level structure. This is shown in Figure 1. |
24 OF 33 PAGES
6.4 | Local Service Support Organization | |
In Vendor, we regard customer satisfaction as the only standard by which we measure our service. To safeguard the Owner’s operation, Vendor has setup a Regional and Local Technical Service Departments which can provide a more responsive and effective service to our Owner. Establishment of this local TSD is based on the Owner’s service requirement, and consists of a competent engineering team, project management, product specialists, and spare part management teams. | ||
Vendor’s North American Regional Technical Service Department is located in Plano, Texas, 3 miles away from the Telecom Corridor of Dallas. This office provides Technical support nation-wide in all the available Vendor’s products, such as Optical Networks, Fixed Networks, Wireless Networks, and Application & Service. | ||
In addition, there are Local offices near the principal markets to support customers in a timely and appropriate manner. In the US, local offices are settled in Plano (TX), Seattle (WA), and San Diego (CA). |
25 OF 33 PAGES
North American Region Technical Service Director | ||
Chief of Vendor’s Local Representative TSD office. | ||
Call Center (Technical Assistance Center) | ||
Receive and register the complaint and technical inquiry from the Owner and transfer technical support engineers according to problem severity level, offer the solution of the problems. Follow up the issue statement and implementation of the solution. | ||
Engineering & Proposals Management Team | ||
Responsible for Management of the Projects, the Pre-sales support and the Outsourcing/Partners activities according to Owner requirements. Evaluate and qualify our EF&I partners, analyze and prepare proposals, and control and manage the projects. | ||
Products Technical Support Team | ||
After receiving the issue reported from Call Center or from Owner directly, carry out the technical support activities. Provide resolution or escalate the issue to higher level TSD. Instruct Owner to implement the resolution remotely or perform the On-Site Service if required by Owner. |
26 OF 33 PAGES
Logistics & Spare Part Management Team | ||
Register and deal with the requirement of faulty parts repair and replacement from Owner. Manage local spare parts stocks and logistics affairs. |
Training Team |
Organize a local centralized training purchased by Owner. The SOW (Scope of Work) of the team covers customized course development, training schedule and arrangement of classroom and practice lab. |
27 OF 33 PAGES
7 | Annex1 Customer Requests Handling Procedure |
u | Introduction to TAC access methods : |
u | Roles & Responsibilities |
Roles | Responsibilities | |
Local Office * Customer Care Representative (CCR) |
Receives, handles, and filtrates the local customer requests; conducts customer survey. | |
Local Office * Product Support Engineer (PSE) |
Handles the local customer requests that related to products and technology, performs escalation, and implements the solution given by the regional expert team or HQ expert team. |
28 OF 33 PAGES
Roles | Responsibilities | |
Local Office * Product Manager |
Designates the field engineer, and monitors the local customer request handling procedure. | |
Regional Office * Regional Expert Team |
Handles customer requests escalated to the regional department, and performs re-escalation. | |
Head Quarters * HQ Expert Team |
Handles customer requests escalated to headquarters |
u | Receiving (CCR) |
u | Telephone Direction (PSE) |
u | Remote Access (PSE) |
u | On-Site Support (PSE, Local Office Product Manager) |
u | Regional Expert Team Support (Regional Expert Team) |
29 OF 33 PAGES
u | HQ Expert Team Support (HQ Expert Team) |
u | Implementation (PSE) |
u | Customer Survey (CCR) |
u | Report (CCR) |
30 OF 33 PAGES
8 | Annex2 RMA Procedure |
8.1 | Terms and Definitions |
8.2 | RMA Procedure |
001
|
Owner |
a. | The Owner’s name, Billing address and Shipping address; | |
b. | The name and telephone number of a person that Vendor may contact for further information; | |
c. | A description of the faulty unit; | |
d. | An explanation of the defect or malfunction; | |
e. | The Vendor hardware’s serial number, Model number and BOM (Xxxx of Material) number, |
31 OF 33 PAGES
002
|
Vendor Spare Parts Center |
003
|
Owner |
004
|
Owner |
0000 Xxxx Xx. Xxxxx 000
Xxxxx, XX 00000
Attn: XXX Xxxx. XXX #
005
|
Vendor Spare Parts Center |
32 OF 33 PAGES
006
|
Vendor Repair Center |
• | Vendor manufactured Product which Vendor considers has exceeded its useful live (lifecycle), based upon Vendor’s engineering review process; | ||
• | Vendor manufactured Products in which Vendor has identified the same defect or fault more than three (3) times; | ||
• | Vendor manufactured Products in which Vendor has identified “no trouble found”. |
008
|
Vendor Repair Center |
009
|
Owner |
33 OF 33 PAGES
§ | Workers’ Compensation insurance with statutory limits as required in the state(s) of operation; and providing coverage for Subcontractor’s employees entering onto Owner premises, even if not required by statute. Employers’ Liability or “Stop Gap” insurance with limits of not less than $500,000 for each occurrence. | ||
§ | Commercial General Liability Insurance covering claims for bodily injury, death, personal injury or property damage, including coverage for independent contractor’s protection (required if any work will be subcontracted), premises-operations, products/completed operations and contractual liability. | ||
The limits of insurance shall be: |
Each Occurrence (Bodily Injury/Property Damage) |
$ | 1,000,000.00 | ||
General Aggregate Limit (Annual Aggregate) |
$ | 2,000,000.00 | ||
Products-Completed Operations Limit (Annual Aggregate) |
$ | 1,000,000.00 |
§ | Comprehensive Automobile Liability Insurance covering ownership, operation and maintenance of all owned, non-owned and hired motor vehicles used in connection with the performance of this Agreement, with limits of at least $1,000,000 combined single limit for bodily injury and property damage. |
Exhibit H | Training |
1 Required Training Programs |
2 | |||
2 Training credit and price for additional training |
3 |
Exhibit H | Training |
Duration | ||||||||||||
Course | (working | Class | ||||||||||
Code | Course Name | days) | Size | |||||||||
NOC Engineer Training (18 Days) | ||||||||||||
ORE10 | CDMA BSS Product Fundamental |
3 | 6-12 | |||||||||
ORE23 | CDMA BSS/AN Operation and Maintenance |
8 | 6-12 | |||||||||
XXX00 | XXXXXX0000 Hardware Structure |
1 | 6-12 | |||||||||
ORL21 | CSOFTX3000 Operation and Maintenance |
1 | 6-12 | |||||||||
ORM10 | UMG8900 Hardware Structure |
1 | 6-12 | |||||||||
ORM21 | UMG8900 Operation and Maintenance |
1 | 6-12 | |||||||||
OWL10 | M2000V2 System Overview |
0.5 | 6-12 | |||||||||
OWL30 | M2000V2 Server Operation and Maintenance |
0.5 | 6-12 | |||||||||
OWL31 | M2000V2 Client Operation and Maintenance |
2 | 6-12 | |||||||||
Field Engineer Training (6 Days) | ||||||||||||
ORA01 | CDMA Access Network Fundamental |
2 | 6-12 | |||||||||
ORA03 | CDMA2000 1 x EV-DO Fundamental |
1 | 6-12 | |||||||||
ORF10 | CDMA BTS/AP Product Fundamental |
1 | 6-12 | |||||||||
ORF20 | CDMA BTS/AP Local Operation and Maintenance |
2 | 6-12 | |||||||||
Switch Technician Training (23 Days) | ||||||||||||
ORE24 | CDMA BSS/AN Testing and Commissioning |
8 | 6-12 | |||||||||
XXX00 | XXXXXX0000 Hardware Structure |
1 | 6-12 | |||||||||
ORL20 | CSOFTX3000 Software Installation and Commissioning |
1 | 6-12 |
Page 2 of 5
Exhibit H | Training |
Duration | ||||||||||||
Course | (working | Class | ||||||||||
Code | Course Name | days) | Size | |||||||||
XXX00 | XXXXXX0000 Operation and Maintenance |
1 | 6-12 | |||||||||
XXX00 | XXXXXX0000 Data Configuration |
6 | 6-12 | |||||||||
ORM10 | UMG8900 Hardware Structure |
1 | 6-12 | |||||||||
ORM20 | UMG8900 Software Installation and Commissioning |
1 | 6-12 | |||||||||
ORM21 | UMG8900 Operation and Maintenance |
1 | 6-12 | |||||||||
ORM30 | UMG8900 Data Configuration |
3 | 6-12 | |||||||||
Translation Engineer Training (25.5 Days) | ||||||||||||
ORA01 | CDMA Access Network Fundamental |
2 | 6-12 | |||||||||
ORA03 | CDMA2000 1 x EV-DO Fundamental |
1 | 6-12 | |||||||||
ORE10 | CDMA BSS Product Fundamental |
3 | 6-12 | |||||||||
ORE24 | CDMA BSS/AN Testing and Commissioning |
8 | 6-12 | |||||||||
ORL01 | CDMA NSS Softswitch Fundamental |
2 | 6-12 | |||||||||
XXX00 | XXXXXX0000 Data Configuration |
6 | 6-12 | |||||||||
ORM30 | UMG8900 Data Configuration |
3 | 6-12 | |||||||||
OWL10 | M2000V2 System Overview |
0.5 | 6-12 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Page 3 of 5
Exhibit H | Training |
Number of | Training | Number of | Total Training | |||||
Position | personnel | Days | Teams | Days | ||||
Manager | [***] | [***] | [***] | [***] | ||||
Supervisor | [***] | [***] | [***] | [***] | ||||
Switch Tech | [***] | [***] | [***] | [***] | ||||
Field Tech | [***] | [***] | [***] | [***] | ||||
Translations | [***] | [***] | [***] | [***] | ||||
Fixed Net | [***] | [***] | [***] | [***] | ||||
RF Eng | [***] | [***] | [***] | [***] | ||||
NOC Tech | [***] | [***] | [***] | [***] | ||||
TFS Eng | [***] | [***] | [***] | [***] | ||||
total credit | [***] |
Duration(Working | Translations | |||||||||||||||||||||||||||||||
System | Code | Courses | Days) | NOC Engineer | Field Engineer | Switch Technician | Engineer | RF engineer | ||||||||||||||||||||||||
BSS | ORA01 | CDMA Access Network Fundamental |
2 | x | x | x | ||||||||||||||||||||||||||
XXX00 | XXXX0000 1 x EV-DO Fundamental |
1 | x | x | x | |||||||||||||||||||||||||||
ORF10 | CDMA BTS/AP Product Fundamental |
1 | x | x | ||||||||||||||||||||||||||||
ORF20 | CDMA BTS/AP Local Operation and Maintenance |
2 | x | x | ||||||||||||||||||||||||||||
ORE10 | CDMA BSS Product Fundamental |
3 | x | |||||||||||||||||||||||||||||
ORE23 | CDMA BSS/AN Operation andMaintenance |
8 | x | |||||||||||||||||||||||||||||
ORE24 | CDMA BSS/AN Testing and Commissioning |
8 | x | x | x | |||||||||||||||||||||||||||
NSS | ORL01 | CDMA NSS Softswitch Fundamental |
2 | x | ||||||||||||||||||||||||||||
XXX00 | XXXXXX0000 Hardware Structure |
1 | x | x | x | |||||||||||||||||||||||||||
XXX00 | XXXXXX0000 Software Installation and Commissioning |
1 | x | x | ||||||||||||||||||||||||||||
XXX00 | XXXXXX0000 Operation and Maintenance |
1 | x | x | x | |||||||||||||||||||||||||||
XXX00 | XXXXXX0000 DataConfiguration |
6 | x | x | x | |||||||||||||||||||||||||||
ORM10 | XXX0000 Xxxxxxxx Structure |
1 | x | x | x | |||||||||||||||||||||||||||
ORM20 | UMG8900 Software Installation and Commissioning |
1 | x | x | ||||||||||||||||||||||||||||
ORM21 | UMG8900 Operation and Maintenance |
1 | x | x | x | |||||||||||||||||||||||||||
ORM30 | UMG8900 Data Configuration |
3 | x | x | x |
Page 4 of 5
Exhibit H | Training |
Duration(Working | Translations | |||||||||||||||||||||||||||||||
System | Code | Courses | Days) | NOC Engineer | Field Engineer | Switch Technician | Engineer | RF engineer | ||||||||||||||||||||||||
M2000 | OWL10 | M2000V2 System Overview |
0.5 | x | x | |||||||||||||||||||||||||||
OWL30 | M2000V2 Server Operation and Maintenance |
0.5 | x | |||||||||||||||||||||||||||||
OWL31 | M2000V2 Client Operation and Maintenance |
2 | x | |||||||||||||||||||||||||||||
Training days for each role | 15 | 6 | 15 | 25.5 | 21 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Page 5 of 5
BTS3606AE | ||||||||||
Arrive in | Installation & | |||||||||
FOB SHENZHEN | Finish clearance in [***] | warehouse | Commission | |||||||
By Sea | ||||||||||
QTY < 200
|
Incremental Total |
[***] [***] |
[***] [***] |
[***] [***] |
[***] [***] |
BSC System | ||||||||||
Arrive in | Installation & | |||||||||
FOB SHENZHEN | Finish clearance in [***] | warehouse | Commission | |||||||
By Sea | ||||||||||
QTY < 4
|
Incremental Total |
[***] [***] |
[***] [***] |
[***] [***] |
[***] [***] |
MSC | ||||||||||
Arrive in | Installation & | |||||||||
FOB SHENZHEN | Finish clearance in [***] | warehouse | Commission | |||||||
By Sea | ||||||||||
QTY < 5
|
Incremental Total |
[***] [***] |
[***] [***] |
[***] [***] |
[***] [***] |
MGW | ||||||||||
Arrive in | Installation & | |||||||||
FOB SHENZHEN | Finish clearance in [***] | warehouse | Commission | |||||||
By Sea | ||||||||||
QTY < 5
|
Incremental Total |
[***] [***] |
[***] [***] |
[***] [***] |
[***] [***] |
M2000 | ||||||||||
Arrive in | Installation & | |||||||||
FOB SHENZHEN | Finish clearance in [***] | warehouse | Commission | |||||||
By Sea | ||||||||||
QTY < 5
|
Incremental | [***] | [***] | [***] | [***] | |||||
Total | [***] | [***] | [***] | [***] |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
* | Hardware expansion of Test Bed Equipment will be charged according to 20% off discount of “Exhibit C Equipment Upgrade Pricing”. | |
* | Software expansion of Test Bed Equipment will not be charged. | |
* | The TestBed is proposed for lab testing purpose not for commercial use. If any equipment is used for commercial deployment, all clauses and exhibits in the SEPA applied for initial system will be applied to the testbed equipment. | |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Toy Cell System Configuration |
Quantity | ||||||||||
No. | Item | Description | Existing | Add | Total | |||||
1.1 | MSCe (Test Bed) (1K subs ) | Version : CSOFTX3000V100R002 | ||||||||
1.1.1
|
Hardware | |||||||||
Cabinet | ||||||||||
KW-ISCAB | Integrated Configure New Cabinet | [***] | [***] | [***] | ||||||
Service Control Module | ||||||||||
KW-WSMU | System Management Unit | [***] | [***] | [***] | ||||||
KW-WSIU | System Interface Unit | [***] | [***] | [***] | ||||||
KW-WHSC | Hot-Swap And Control Unit | [***] | [***] | [***] | ||||||
KW-WALU | Alarm Unit | [***] | [***] | [***] | ||||||
KW-WCDB | Central Data Base Unit | [***] | [***] | [***] | ||||||
KW-WIFM | IP Forward Module | [***] | [***] | [***] | ||||||
KW-WBFI | Back Insert FE Interface Unit | [***] | [***] | [***] | ||||||
KW-WMGC | Media Gateway Control unit | [***] | [***] | [***] | ||||||
KW-WBSG | Broadband Signaling Gateway | [***] | [***] | [***] | ||||||
KW-WCCU | Call Control Unit | [***] | [***] | [***] | ||||||
KW-WVDB | VLR Data Base unit | [***] | [***] | [***] | ||||||
KW-UPWR | PSM Subrack Power Module | [***] | [***] | [***] | ||||||
KW-SFRM | Service Control Shelf | [***] | [***] | [***] | ||||||
IMM Module | ||||||||||
KW-iGWB | Xxxx Server | [***] | [***] | [***] | ||||||
SW-WIN2000I | Microsoft Windows 2000 Xxxxxx,Xxxxxxx,Xxx, 0Xxxx0XXX,00xxx, WinSvr2003 X0 Xxx XXX XXX Xxx, Xxx0000 Svr Std CD,No Doc, Without Product Services |
[***] | [***] | [***] | ||||||
KW-BAM | BAM Server | [***] | [***] | [***] | ||||||
KVM | KVM 4 in 1,1U,15” TFT LCD,8wayKVM,3V3 Power Connector,Black,With Power Cable,Mounting Accessories,English Doc.-48VDC,Without KVM Cable,Black | [***] | [***] | [***] | ||||||
LS-3026C-DC48 | S3026C Ethernet Switch with 24 10/100BASE-TX ports and 2 module slots (DC 48V) | [***] | [***] | [***] | ||||||
KW-EWS | Emergency Workstation | [***] | [***] | [***] | ||||||
SOHO-S1016-EX | 16-port FE unmanaged switch (AC) (EX) | [***] | [***] | [***] | ||||||
KW-XPTU | XPTU Server | [***] | [***] | [***] |
Confidential
Information of Huawei. No Spreading without Permission |
Page 2 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Toy Cell System Configuration |
Quantity | ||||||||||
No. | Item | Description | Existing | Add | Total | |||||
LS-3528G-DC48 | S3528G Ethernet Switch with 24 10/100BASE-TX ports and 4 1000BASE-X GBIC ports (GBIC Req.) (DC 48V) | [***] | [***] | [***] | ||||||
Auxiliary Equipment | ||||||||||
KW-DOC-CSX | Package of Documents-HUAWEI CSOFTX3000 Mobile SoftSwitch Center | [***] | [***] | [***] | ||||||
Installation Materials | ||||||||||
IM-KW-CB | Cabinet Installation Component | [***] | [***] | [***] | ||||||
1.1.2
|
Software | |||||||||
1)
|
Basic Software | |||||||||
SWP-CSX-VMSC | MSCeH Basic Software (Per 1k Subs) | [***] | [***] | [***] | ||||||
2)
|
Optional Software | |||||||||
Optional Software only for VMSC | ||||||||||
Short Message & Voice Mailbox | ||||||||||
SWP-CMSCF-OSMS | Short Message Service (SMS) (Per 1k Service Subscriber) |
[***] | [***] | [***] | ||||||
SWP-CMSCF-VMS | Voice Mailbox Service (Per 1k Service Subscriber) | [***] | [***] | [***] | ||||||
MultiParty Service | ||||||||||
SWP-CMSCF-CW | Call Waiting (CW) (Per 1k Service Subscriber) | [***] | [***] | [***] | ||||||
SWP-CMSCF-3WC | Three-Way Calling (3WC) (Per 1k Service Subscriber) | [***] | [***] | [***] | ||||||
SWP-CMSCF-CC | Conference Calling (CC) (Per 1k Service Subscriber) | [***] | [***] | [***] | ||||||
Intelligent Network Service | ||||||||||
SWP-CMSCF-ICS | Incoming Call Screen(ICS)(Per 1k Service Subscriber) |
[***] | [***] | [***] | ||||||
Data Service | ||||||||||
SWP-CMSCF-DATA | Packet Data Serving Node (PDSN) (Per 1k Service Subscriber) |
[***] | [***] | [***] | ||||||
Protocol Interface Functions | ||||||||||
SWP-CMSCF-SIPT | SIP/SIP-T Protocol Interface ( Per 1k Service Subscriber) |
[***] | [***] | [***] | ||||||
Interception Service |
Confidential
Information of Huawei. No Spreading without Permission |
Page 3 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Toy Cell System Configuration |
Quantity | ||||||||||
No. | Item | Description | Existing | Add | Total | |||||
SWP-CMSCF-LI | Lawful Interception(Per Service Subscriber) | [***] | [***] | [***] | ||||||
MSC Doctor | ||||||||||
SWP-CMSCF-MTC | Markov Test Call (Per MSC) | [***] | [***] | [***] | ||||||
SWP-CMSCF-LTC | Loopback Test Call (Per MSC) | [***] | [***] | [***] | ||||||
Operation and Maintenance | ||||||||||
SWP-CMSCF-TRACE | Trace (Per 1k Service Subscriber) | [***] | [***] | [***] | ||||||
SWP-CMSCF-RMA | Remote Maintenance Agent(Per MSC) | [***] | [***] | [***] | ||||||
Other Functions | ||||||||||
SWP-CMSCF-OTASP | OTA Service Provisioning (OTASP)(Per 1k Service Subscriber) |
[***] | [***] | [***] | ||||||
SWP-CMSCF-OTAPA | OTA Parameter Administration (OTAPA)(Per 1k Service Subscriber) |
[***] | [***] | [***] | ||||||
SWP-CMSCF-NP | Wireless Number Portability(Per 1k Service Subscriber) |
[***] | [***] | [***] | ||||||
SWP-CMSCF-E911 | E911 Emergency Call(Per 1k Service Subscriber) | [***] | [***] | [***] | ||||||
SWP-CMSCF-ATCD | Automatic Timed Call Disconnect(Per 1k Service Subscriber) |
[***] | [***] | [***] | ||||||
SWP-CMSCF-TrFO/RTO | TrFO/RTO (Per 1k Service Subscriber) | [***] | [***] | [***] |
Confidential
Information of Huawei. No Spreading without Permission |
Page 4 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Toy Cell System Configuration |
Quantity | ||||||||||
No. | Item | Description | Existing | Add | Total | |||||
1.2 | MGW (Test Bed) (1K subs) | Version :UMG8900V200R006 | ||||||||
1.2.1 |
Basic Equipment | |||||||||
Cabinet | ||||||||||
KW-MGWCAB | Universal Media Gateway NGN Assembly Cabinet | [***] | [***] | [***] | ||||||
Media Module | ||||||||||
KW-MMPU | Media gateway Main Processing Unit | [***] | [***] | [***] | ||||||
KW-MNET | Media gateway Packet Switch Unit | [***] | [***] | [***] | ||||||
KW-MTNB | Media gateway TDM switching Net Unit B | [***] | [***] | [***] | ||||||
KW-MFLU | Media gateway Front Link Unit(b) | [***] | [***] | [***] | ||||||
KW-MBLU | Media gateway Back Link Unit(b) | [***] | [***] | [***] | ||||||
KW-MSPF | Media Gateway Front Signalling Processing Unit(b) | [***] | [***] | [***] | ||||||
UG-MHRU | Media Gateway High-speed Routing Unit(b) | [***] | [***] | [***] | ||||||
UG-MVPD2 | Media Gateway Voice Processing Xxxx X(0X XX,00xx EC) | [***] | [***] | [***] | ||||||
KW-MCMF | Media Gateway Front Connection Maintenance Unit | [***] | [***] | [***] | ||||||
KW-ME8T | Media Gateway 8-port 10/100M Ethernet Interface Board | [***] | [***] | [***] | ||||||
KW-MT32 | Media Gateway 32T1 Port TDM Interface Board | [***] | [***] | [***] | ||||||
KW-MCLK | Media Gateway Clock Unit | [***] | [***] | [***] | ||||||
KW-MOMB | Media Gateway Operation & Maintenance Unit B | [***] | [***] | [***] | ||||||
KW-MMPB | Media Gateway Main Processing Unit B | [***] | [***] | [***] | ||||||
KW-MNLU | Media Gateway Link Unit | [***] | [***] | [***] | ||||||
KW-MTNC2 | Media Gateway TDM switchinig Net Unit C2(With 1 TDM Cascade Port) | [***] | [***] | [***] | ||||||
KW-MS1L | Media Gateway 1*155M SDH/SONET optical interface card | [***] | [***] | [***] | ||||||
KW-MFRM | Universal Media Gateway ssm-256 Backplane Subrack | [***] | [***] | [***] | ||||||
UG-K1-MMBS | Universal Media Gateway ssm-32 Backplane Subrack | [***] | [***] | [***] |
Confidential
Information of Huawei. No Spreading without Permission |
Page 5 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Toy Cell System Configuration |
Quantity | ||||||||||
No. | Item | Description | Existing | Add | Total | |||||
Pinch Board | ||||||||||
KW-SHPU | Signaling High level link Processing Unit | [***] | [***] | [***] | ||||||
Optical Module/electrical Module | ||||||||||
SFP-1310nm-100Base-Lx | Optical Transceiver,SFP,1310nm,STM1,-8dBm,-15dBm,-28dBm,LC,15km | [***] | [***] | [***] | ||||||
XXX-000xx-0000Xxxx-Xx | Xxxxxxxxxxx,XXX,000xx,0.00Xx/x,0xXx,-0.0xXx,-00xXx,XX,0.00xx | [***] | [***] | [***] | ||||||
Auxiliary Equipment | ||||||||||
KW-DOC-UMG | Package of Documents-HUAWEI UMG8900 Universal Media Gateway | [***] | [***] | [***] | ||||||
Installation Materials | ||||||||||
CB-HD100-16E1-120 | Trunk Cable,20.00m,120ohm,16E1,0.4mm,D100M,120CC32P0.4P430U(S) | [***] | [***] | [***] | ||||||
SS-OP-LC-SC-S-20 | Patch Cord,LC/PC-SC/PC,Single,mode,20m | [***] | [***] | [***] | ||||||
IM-INS-MGW | Media Gateway Installation Suite | [***] | [***] | [***] | ||||||
1.2.2 |
Software | |||||||||
Basic Software | ||||||||||
SWP-MGW-VMSC | VMSC Basic Software per k subs | [***] | [***] | [***] | ||||||
Optional Software | ||||||||||
SWP-UMGV-TrFO | TrFO Function per k subs | [***] | [***] | [***] | ||||||
SWP-UMGVG-64SG | 64K MTP2/MTP3-M2UA/M3UA Signaling Gateway per Link | [***] | [***] | [***] | ||||||
SWP-UMGV-STLI | Lawful Interception per subs | [***] | [***] | [***] | ||||||
SWP-UMGVG-TRACE | Trace Management(per MGW) | [***] | [***] | [***] |
Confidential
Information of Huawei. No Spreading without Permission |
Page 6 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Toy Cell System Configuration |
Quantity | ||||||||||
No. | Item | Description | Existing | Add | Total | |||||
2.1 | [***] | Version :UMG8900V200R006 | ||||||||
2.1.1 |
Basic Equipment | |||||||||
Cabinet | ||||||||||
QC-BC | BSC Cabinet | [***] | [***] | [***] | ||||||
Hardware | ||||||||||
QC-CPFU | IP over FE Interface Unit | [***] | [***] | [***] | ||||||
QC-CPEU | IP over OC3 Interface Unit | [***] | [***] | [***] | ||||||
QC-CDPU | Data Process Unit | [***] | [***] | [***] | ||||||
QC-CXPU | Extend Processing Unit | [***] | [***] | [***] | ||||||
QC-CPIU | Packet Interface Unit | [***] | [***] | [***] | ||||||
QC-CSCU | GE Switching Control Unit | [***] | [***] | [***] | ||||||
QC-CGCU | General ClocK Unit | [***] | [***] | [***] | ||||||
QC-CBSR | Service Processing Rack | [***] | [***] | [***] | ||||||
QC-CBCR | Control Processing Rack | [***] | [***] | [***] | ||||||
QC-CMPS | Main Processing Subrack | [***] | [***] | [***] | ||||||
QC-CSPS | Slave Processing Subrack | [***] | [***] | [***] | ||||||
CIMS Modules | ||||||||||
QC-BAM | BAM | [***] | [***] | [***] | ||||||
SW-WIN2000I | Windows2000 Server | [***] | [***] | [***] | ||||||
SW-SQL | SQL Server 2000 | [***] | [***] | [***] | ||||||
KVM | KVM-3in1 | [***] | [***] | [***] | ||||||
QC-TCCTS | Emergency Workstation | [***] | [***] | [***] | ||||||
LS-3026C-DC48 | Ethernet Switch Host(48V) | [***] | [***] | [***] | ||||||
LS-GS1UA | 1-port 1000BASE-LX Single Mode Optical Interface Module (1310nm, 10km, SC) | [***] | [***] | [***] | ||||||
Auxiliary Equipment | Installation Materials Package | [***] | [***] | [***] | ||||||
2.1.2 |
Software | |||||||||
Basic Software | ||||||||||
SW-CBSC-SYS | BSS Software Per Service CH(0 — 2000CH) | [***] | [***] | [***] | ||||||
SW-CBSC-SYS | BSS Software Per Service CH(2001 — 4000CH) | [***] | [***] | [***] | ||||||
SW-CBSC-SYS | BSS Software Per Service CH(4001 — 6000CH) | [***] | [***] | [***] |
Confidential
Information of Huawei. No Spreading without Permission |
Page 7 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Toy Cell System Configuration |
Quantity | ||||||||||
No. | Item | Description | Existing | Add | Total | |||||
SW-CBSC-SYS | BSS Software Per Service CH(>6001CH) | [***] | [***] | [***] |
Confidential
Information of Huawei. No Spreading without Permission |
Page 8 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Toy Cell System Configuration |
Quantity | ||||||||||
No. | Item | Description | Existing | Add | Total | |||||
BTS3606AE (S222 with 4AWS CSM5000, 1AWS CSM6800) | Version: BTS3606AEV300R001 | |||||||||
3.1.1
|
Hardware | |||||||||
Main Equipment | ||||||||||
QC-B-HBBC | Outdoor Heat Exchanger Baseband Cabinet,110V (Dual Xxxx Xxxxx) |
[***] | [***] | [***] | ||||||
QC-B-RFC | Outdoor RF Cabinet | [***] | [***] | [***] | ||||||
QC-CRDM | Resource Distribution Board | [***] | [***] | [***] | ||||||
QC-BCKM0 | Main Clock Board (With GPS Card) | [***] | [***] | [***] | ||||||
QC-BCIM | Controlling Interface Module (IP 8E1/T1) | [***] | [***] | [***] | ||||||
QC-CCPMD | Compact BTS Channel Processing Module(128 Channel) |
[***] | [***] | [***] | ||||||
QC-CECM5 | EV-DO processing Board (192 Channel) | [***] | [***] | [***] | ||||||
QC-CESP | E1 Surge Protection Module | [***] | [***] | [***] | ||||||
QC-OMTR | Outdoor-BTS Multi-carrier Transceiver Module (AWS) |
[***] | [***] | [***] | ||||||
QC-OMPA | Outdoor-BTS Multi-carrier Power Amplifier Module (AWS) |
[***] | [***] | [***] | ||||||
QC-ODFU | Outdoor-BTS Duplexer and Filter Unit (AWS) | [***] | [***] | [***] | ||||||
QC-OFAN | ODU Fan Box | [***] | [***] | [***] | ||||||
QC-PSU | AC/DC Power Module,-33degC-65degC,90V-300V,27V/50A |
[***] | [***] | [***] | ||||||
GM-PMU | Power System Monitor Module | [***] | [***] | [***] | ||||||
GM-BAT-24V-150AH | Rechargeable battery,VRLA battery,24V,150Ah,battery group,single cell 560*126*325mm(max.) | [***] | [***] | [***] | ||||||
Equipment Installation Materials | ||||||||||
IM-CM-CBTSCB | CBTS Installation Set | [***] | [***] | [***] | ||||||
GM-BTS-BF | Double Cuts Grounding Plate | [***] | [***] | [***] | ||||||
CAB-SPF-4m | SFP High Speed Transmission Cable-4m | [***] | [***] | [***] | ||||||
QC-SFPB | Optical Transceiver(ESFP,1310nm,1.25G,C,10km) | [***] | [***] | [***] | ||||||
SWYVP-100-4*2*0.5 | Trunk Cable,15m-100ohm-4T1 | [***] | [***] | [***] | ||||||
SS-OP-D-LC-S-30 | Patch Cord,LC/PC,LC/PC,Single Mode,2mm,30m | [***] | [***] | [***] | ||||||
GM-JMP-22 | Antenna Jumper,2.2m | [***] | [***] | [***] | ||||||
3.1.2
|
Software | |||||||||
SW-CBTS-1XCH | CBTS Software per 1X Channel | [***] | [***] | [***] | ||||||
SW-CBTS-DOCH | CBTS Software per DO Channel | [***] | [***] | [***] | ||||||
SW-CBTS-HPA40 | CBTS Supporting HPA-40W per HPA | [***] | [***] | [***] | ||||||
SW-CBTS-MULTI | CBTS Supporting Multi TRM Software per TRX | [***] | [***] | [***] |
Confidential
Information of Huawei. No Spreading without Permission |
Page 9 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Toy Cell System Configuration |
Quantity | ||||||||||
No. | Item | Description | Existing | Add | Total | |||||
SW-CBTS-XXXX | CBTS Software per EV-DO-RA TRX | [***] | [***] | [***] |
Confidential
Information of Huawei. No Spreading without Permission |
Page 10 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Toy Cell System Configuration |
Quantity | ||||||||||
No. | Item | Description | Existing | Add | Total | |||||
3.2 | ODU3601CE (60W,110V,Type 1) | Version: ODU3601CV100R002 | ||||||||
3.2.1
|
Hardware | |||||||||
Main Equipment | ||||||||||
QC-B-ABR | BTS3601C Micro-bts Cabinet | [***] | [***] | [***] | ||||||
QC-OMTR | Outdoor-BTS Multi-carrier Transceiver Module (AWS) | [***] | [***] | [***] | ||||||
QC-OMPA | Outdoor-BTS Multi-carrier Power Amplifier Module (AWS) | [***] | [***] | [***] | ||||||
QC-ODFU | Outdoor-BTS Duplexer and Filter Unit (AWS) | [***] | [***] | [***] | ||||||
QC-MDPM | [***] | [***] | [***] | |||||||
QC-OFAN | BTS3606AE,QCSE1OFAN,ODU Fan Box | [***] | [***] | [***] | ||||||
QC-SFPB | Optical Transceiver(ESFP,1310nm,1.25G,C,10km) | [***] | [***] | [***] | ||||||
Auxiliary Equipment | ||||||||||
SPD40R | Single Phase 60KA Lightning Protection Box | [***] | [***] | [***] | ||||||
APM 200 | ||||||||||
APM200-4840SE-0,Outdoor Integrated DC Backup Power System,48V40A,South,No Battery,with Chinese National Standard AC Socket | [***] | [***] | [***] | |||||||
Rechargeable battery,VRLA battery(front access),48V,100Ah,battery group,single cell 520*110*264mm(max.) | [***] | [***] | [***] |
Confidential
Information of Huawei. No Spreading without Permission |
Page 11 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Toy Cell System Configuration |
Quantity | ||||||||||
No. | Item | Description | Existing | Add | Total | |||||
4.1 |
Antenna & Feeder | |||||||||
4.1.1 | Satellite Antenna and Feeders | |||||||||
ANT-GPS-CBSC | GPS Antenna and Feeders - CBSC | [***] | [***] | [***] | ||||||
ANT-GPS-BTS | GPS Antenna and Feeders - CBTS | [***] | [***] | [***] |
Confidential
Information of Huawei. No Spreading without Permission |
Page 12 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Exsisting Toy Cell EVDO-Rev A UPGRADE FOR IOT |
Quantity | ||||||||||
No. | Item | Description | Existing | Add | Total | |||||
5.1 | BTS3606A UPGRADE OF EVDO-XxxX IOT | |||||||||
5.1.1
|
Hardware | |||||||||
Main Equipment | ||||||||||
QC-BCIM | Controlling Interface Module (8E1/T1) | [***] | [***] | [***] | ||||||
CECM | EV-DO processing Board(1 CPU,1 CSM6800) | [***] | [***] | [***] | ||||||
QC-CBPE | Abis Interface Packet Equipment over E1/T1 | [***] | [***] | [***] |
Confidential
Information of Huawei. No Spreading without Permission |
Page 13 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Existing Test Lab Equipment List |
QTY | ||||||
No. | Item | Description | Total | |||
1
|
MSCe (1K subs ) | |||||
1.1
|
MSCe Hardware | |||||
KW-ISCAB | Integrated Service Cabinet | [***] | ||||
Service Control Module | ||||||
KW-WSMU | System Management Unit | [***] | ||||
KW-WSIU | System Interface Unit | [***] | ||||
KW-WHSC | Hot-Swap and Control Unit | [***] | ||||
KW-WALU | Alarm Unit | [***] | ||||
KW-WCDB | Central Data Base Unit | [***] | ||||
KW-WIFM | IP Forward Module | [***] | ||||
KW-WBFI | Back insert FE Interface Unit | [***] | ||||
KW-WMGC | Media Gateway Control Unit | [***] | ||||
KW-WBSG | Broadband Signaling Gateway | [***] | ||||
KW-WCCU | WirelessCalling Control Unit | [***] | ||||
KW-WVDB | VLR Data Base Unit | [***] | ||||
KW-UPWR | Universal Power | [***] | ||||
KW-SFRM | Service Control Shelf | [***] | ||||
IMM Module | ||||||
KW-iGWB | iGWB Server | [***] | ||||
KW-EXP400 | Disk Array EXP400 | [***] | ||||
KW-DISK | Hard Disk 73.4G | [***] | ||||
SW-WIN2000I | Windows2000 Server(for iGWB) | [***] | ||||
KW-BAM | BAM Server (Windows2000 Server&SQL Server) | [***] | ||||
KVM | KVM I/O Control Desk | [***] | ||||
Lanswitch X0000x | Xxxxxxx X0000x-00X Xxxxxxx | [***] | ||||
KW-EWS | Emergency Workstation (Windows2000 Server&SQL Server) | [***] | ||||
Lanswitch 16*RJ45 | LANSWITCH-16*RJ45-100Mbps-110~240VAC English Documents | [***] | ||||
MO-CLT | MO Clean Set-FUJITSU 3.5” | [***] | ||||
KW-XPTU | EXchange Protocol Transfer Unit(for Lawful interception system) | [***] | ||||
SW-WIN2000X | Windows2000 Server(for XPTU) | [***] |
Security Level:Confidential | Confidential Information of Huawei. No Spreading without Permission |
Page 14 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Existing Test Lab Equipment List |
QTY | ||||||
No. | Item | Description | Total | |||
Auxiliary Equipment | ||||||
KW-DOC-MSX | Technical Documents For CSOFTX3000 (Including CD-ROM) | [***] | ||||
Installation Materials | ||||||
IM-XX-XX | MSC Installation Suite | [***] | ||||
MSCe Hardware | ||||||
1.2
|
MSCe Software | |||||
1)
|
Basic Software | |||||
SWP-CSX-2GVMSC | MSX Basic Software-2G (Per 1k Subs) | [***] | ||||
2)
|
Optional Software | |||||
SWP-CMSCF-VMS | Voice Mailbox Service (Per 1k Service Subscriber) | [***] | ||||
SWP-CMSCF-CW | Call Waiting (CW) (Per 1k Service Subscriber) | [***] | ||||
SWP-CMSCF-CT | Call Transfer (CT) (Per 1k Service Subscriber) | [***] | ||||
SWP-CMSCF-3WC | Three-Way Calling (3WC) (Per 1k Service Subscriber) | [***] | ||||
SWP-CMSCF-CC | Conference Calling (CC) (Per 1k Service Subscriber) | [***] | ||||
SWP-CMSCF-PPC | Pre-Paid Charging (PPC) (Per 1k Service Subscriber) | [***] | ||||
SWP-CMSCF-DATA | Packet Data Serving Node (PDSN) (Per 1k Service Subscriber) | [***] | ||||
SWP-CMSCF-LI | Lawful Interception(Per 1k User) | [***] | ||||
SWP-CMSCF-OTAF | Over The Air Function (OTAF) (Per 1k Service Subscriber) | [***] | ||||
SWP-CMSCF-E911 | E911 Emergency call(Per 1k Service Subscriber) | [***] | ||||
MSCe Software | ||||||
MSCe (1K subs ) |
Security Level:Confidential | Confidential Information of Huawei. No Spreading without Permission |
Page 15 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Existing Test Lab Equipment List |
QTY | ||||||
No. | Item | Description | Total | |||
2
|
MGW (1K subs) | |||||
2.1
|
MGW Hardware | |||||
KW-MGWCAB | UMG Cabinet | [***] | ||||
Media Module | ||||||
KW-MNET | Packet Switch NET | [***] | ||||
KW-MOMU | Operation & Maintaince Unit | [***] | ||||
KW-MTNU | TDM central switching Net Unit | [***] | ||||
KW-MCLK | Clock Board | [***] | ||||
KW-MPPB | Protocol Processing Unit | [***] | ||||
KW-MT32 | 32T1 port TDM interface board | [***] | ||||
KW-MCMF | Front Connection Maintenance Unit | [***] | ||||
KW-MSPF | Front Signalling Processing Board | [***] | ||||
KW-MECU | Echo Canceller Unit | [***] | ||||
KW-MTCB4 | TransCode Unit B(TDM Tone) | [***] | ||||
KW-MTCB5 | TransCode Unit B(2048 MPTY CH ) | [***] | ||||
KW-MRPU | RTP Processing Unit | [***] | ||||
KW-ME8T | 8 port FE interface Board | [***] | ||||
KW-MFRM | Media Gateway Shelf | [***] | ||||
Pinch Board | ||||||
SHPU | Signaling High level link Processing Unitt | [***] | ||||
Auxiliary Equipment | ||||||
KW-DOC-UMG | Technical Documents For UMG(Including CD-ROM) | [***] | ||||
Installation Materials | ||||||
CB-HD100-16E1-120 | 120ohm/20m 16E1 Cable | [***] | ||||
IM-INS-MGW | MGW Installation Suite | [***] | ||||
IWF Installation materials | ||||||
MGW Hardware | ||||||
2.2
|
MGW Software | |||||
Basic Software | ||||||
SWP-MGW-2GVMSC | VMSC Basic Software-2G per k subs | [***] |
Security Level:Confidential | Confidential Information of Huawei No Spreading without Permission |
Page 16 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Existing Test Lab Equipment List |
QTY | ||||||
No. | Item | Description | Total | |||
Basic Software | ||||||
Optional Software | ||||||
SWP-MGW-64EC | 64ms Echo Canceller Per 1K Service Subscriber | [***] | ||||
SWP-MGW-CSDLI | CSD Lawful Interception Per Subscriber | [***] | ||||
Optional Software | ||||||
MGW Software | ||||||
MGW (1K subs) |
Security Level:Confidential | Confidential Information of Huawei No Spreading without Permission |
Page 17 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Existing Test Lab Equipment List |
QTY | ||||||
No. | Item | Description | Total | |||
2.1 | CBSC6600 ( CBTS: 4 TRX: 24 ;1X Channel: 384 ) | |||||
2.1.1 | CBSC Hardware and OS Software | |||||
QC-BCCTR | CCTR Cabinet | [***] | ||||
QC-BCBUR | CBUR Cabinet | [***] | ||||
CRPS | ||||||
QC-CBIE0 | ATM Reverse Multiplex Interface Board — QC11CBIE0 | [***] | ||||
QC-CRMU | Resource Management Board | [***] | ||||
QC-CMUX | Multiplex Board | [***] | ||||
QC-CPPU | Packet Processing Board | [***] | ||||
QC-CBPU | Buffer Board | [***] | ||||
QC-CHAC | Highspeed Access Board | [***] | ||||
QC-CPCU | PCF Control Board | [***] | ||||
QC-KCRPS | Shelf Component Set- CRPS Module | [***] | ||||
CIMS | ||||||
QC-BAM | BAM | [***] | ||||
SW-WIN2000 | Windows 2000 Server English -5Users | [***] | ||||
SW-SQL | SQL Server 2000-5 Users | [***] | ||||
KVM-3in1 | KVM-3in1 | [***] | ||||
QC-TCCTS | Emergency Workstation | [***] | ||||
HUB | Switch Hub | [***] | ||||
LS-GSIU | 1000Base-LX Long Wavelength SMF Module (SC 10km) | [***] | ||||
CIPS(1X&DO) | ||||||
QC-CBIE0 | ATM Reverse Multiplex Interface Board — QC11CBIE0 | [***] | ||||
QC-CFMR | Radio Frame Processing Board | [***] | ||||
QC-CEVD | Voice Processing Board (Without Echo Canceller) | [***] | ||||
QC-CMUX | Multiplex Board | [***] | ||||
QC-CLAP | Signaling Processing Board (Narrowband) | [***] | ||||
QC-CSPU | Service Processing Board | [***] | ||||
QC-CAIE0 | E1/T1 Interface Board — QC11CAIE0 | [***] | ||||
QC-KCIPS | Shelf Component Set- CIPS Module | [***] |
HUAWEI CONFIDENTIAL | Page 18 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Existing Test Lab Equipment List |
QTY | ||||||
No. | Item | Description | Total | |||
CLKM | ||||||
QC-GCKM | Board Set-BSC6600-XX00XXXX0-CBSC GPS/GLONASS&Clock Processing Board Set/With M12+ Card | [***] | ||||
Auxiliary Equipment | ||||||
GM-ALMZ | General Alarm Box | [***] | ||||
DOC-GM-CBSC | Technical Documents For CBSC (Including CD-ROM) | [***] | ||||
Installation Materials | ||||||
CAB-T1-100-20m | 20m T1 Cable- 100ohm-8T1 | [***] | ||||
CAB-OPTICAL-2m | Optical Cable Between HAC And Lanswitch-2m | [***] | ||||
GM-GLD | Wall-Type Closed Window for GPS Feeding Cable | [***] | ||||
Subtotal Price | CBSC Hardware and OS Software | |||||
2.1.2
|
CBSC Software | |||||
1)
|
CBSC Basic Software | |||||
SW-CBSC-SYS | BSS Software Per CH (0—2000CH) | [***] | ||||
SW-CBSC-DO | CBSC EV-DO Software Per Throughput(Mbps) | [***] | ||||
2)
|
BSS Optional Software | |||||
SWP-CBSCF-SM | Point to Point Short Messages Per Service CH | [***] | ||||
SWP-CBSCF-PDS | Packet Data Service (RC3/RC4) Per Service CH | [***] | ||||
SWP-CBSCF-HO1X/DO | Handoff between CDMA2000 1xEV-DO and CDMA2000 1x Per DO Service CH | [***] | ||||
Subtotal Price | CBSC Software | |||||
Subtotal Price | CBSC6600 ( CBTS: 4 TRX: 24 ;1X Channel: 384 ) |
HUAWEI CONFIDENTIAL | Page 19 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Existing Test Lab Equipment List |
QTY | ||||||
No. | Item | Description | Total | |||
2.2.a | BTS3606A (S222 with 4 PCS CSM5000 0 ODU(s) 25W 3 EV-DO TRX ) | |||||
1)
|
Main Equipment | |||||
QC-QB6BHXC | BTS3606A Cabinet(Heat-Exchanger Cabinet- 240V; without Heater and Lamp and External battery) | [***] | ||||
QC-BCKM2 | Main Clock Board (with GPS Card) | [***] | ||||
QC-52BCIM | Control Interface Board — QC52BCIM | [***] | ||||
QC-CCPM4 | 128-Channel Processing Board | [***] | ||||
QC-CECM1 | EV-DO 24-Channel Processing Board | [***] | ||||
QC-CTRM | Compact-BTS Transceiver Module | [***] | ||||
QC-CHPA | Compact-BTS High Power Amplifier | [***] | ||||
QC-BRFM | RF Fan Module | [***] | ||||
QC-CDDU | Compact-BTS Dual Duplexer Unit | [***] | ||||
QC-PSU | Power Supply Unit | [***] | ||||
QC-PSU | Power Supply Unit (AC/ DC) | [***] | ||||
HRS-PSM | Power Supply Monitoring Unit | [***] | ||||
Main Equipment | ||||||
CBTS Equipment Installation Materials | ||||||
IM-CM-CBTSCB | CBTS Installation Set | [***] | ||||
GM-HAW-GND | Grounding Hardware Combination | [***] | ||||
SFYZP-75-2*8 | 75ohm Trunk Cable-20m-4E1-DB25 | [***] | ||||
SWYVP-120-4*2*0.5 | 120ohm Trunk Cable-20m-4E1-DB25 | [***] | ||||
SWYVP-100-4*2*0.5 | 100ohm Trunk Cable-20m-4T1-DB25 | [***] | ||||
LC/PC-FC/PC | OFC Connector-2mm-50m | [***] | ||||
GM-JMP-1 | Jumper (m) | [***] | ||||
GM-JMP-CON-DIN | Jumper Connector-DIN | [***] | ||||
CBTS Equipment Installation Materials | ||||||
CBTS Hardware | ||||||
2)
|
Software | |||||
SW-CBTS-BASIC | CBTS Software per 128-Channel Processing Board | [***] | ||||
SW-CBTS-BASIC | CBTS Software per 96-Channel Processing Board | [***] |
HUAWEI CONFIDENTIAL | Page 20 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Existing Test Lab Equipment List |
QTY | ||||||
No. | Item | Description | Total | |||
SW-CBTS-BASIC | CBTS Software per 64-Channel Processing Board | [***] | ||||
SW-CBTS-BASIC | CBTS Software per 32-Channel Processing Board | [***] | ||||
SW-CBTS-EVDO | CBTS Software per EV-DO TRX | [***] | ||||
CBTS Software | ||||||
BTS3606A (S222 with 4 PCS CSM5000 0 ODU(s) 25W 3 EV-DO TRX ) | ||||||
3) | Feeder Installation Materials | |||||
FSJ4-50B | Special Jumper (3.5m) | [***] | ||||
GM-PRO-TAP | Waterproof Tape | [***] |
HUAWEI CONFIDENTIAL | Page 21 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Existing Test Lab Equipment List |
QTY | ||||||
No. | Item | Description | Total | |||
2.5
|
Antenna and Feeder | |||||
2.5.1 | Satellite Antenna and Feeders | |||||
ANT-GPS-CBSC | GPS Antenna and Feeders — CBSC | [***] | ||||
ANT-GPS-CBTS | GPS Antenna and Feeders — CBTS | [***] | ||||
Subtotal Price | Satellite Antenna and Feeders | |||||
2.5.2
|
BTS Antenna (1900M) | |||||
27010157 | Kathrein 739496 (1710~1990MHZ, 65deg -18dBi -Vertical polarization) |
[***] | ||||
Subtotal Price | BTS Antenna (1900M) | |||||
2.5.3
|
Feeders | |||||
XXX0-00 | Xxxxxxx-0/0"-x | [***] | ||||
CON-DIN-7/8” | Feeder Connector-7/8” | [***] | ||||
GM-FED CLP / 3 FED- 7/8” | Feeder Clamp For Triple Cable-7/8’’ | [***] | ||||
PLGT-7/8” | Lightning Protection Grounding Clip-7/8” | [***] | ||||
GM-JMP-CON-DIN | Jumper Connector-DIN | [***] | ||||
Subtotal Price | Feeders | |||||
2.5.4 | Feeder Installation Materials | |||||
BTS-FINSTALL | BTS3606A (S222 with 4 PCS CSM5000 0 ODU(s) 25W 3 EV-DO TRX ) |
[***] | ||||
BTS-FINSTALL | BTS3606A (S222 with 0 PCS CSM5000 0 ODU(s) 25W 6 EV-DO TRX ) | [***] | ||||
Subtotal Price | Feeder Installation Materials | |||||
Subtotal Price | Antenna and Feeder |
HUAWEI CONFIDENTIAL | Page 22 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Existing Test Lab Equipment List |
QTY | ||||||
No. | Item | Description | Total | |||
4 | M2000 (Network Elements: 2, Remote Sites: 0 ) | |||||
4.1 |
Hardware and OS Software | |||||
1) |
Servers and OS Software | |||||
M2000-SVR-SIMPLE | M2000 Server-Blade 150 (Single) | [***] | ||||
M2000-SVR-Service | Blade 150 (Single) Workstation Service-SUN-USA- One Year Gold+ Service | [***] | ||||
SW-SUN-Solaris | SUN Solaris OS | [***] | ||||
SW-Sybase | Tools Software, Sybase Adaptive Server | [***] | ||||
Switch HUB | Switch Hub ( +220V AC) | [***] | ||||
2) |
Terminals | |||||
M2000-OMT | Operating & Maintenance Terminal | [***] | ||||
M2000-ALM | M2000 Alarm Center | [***] | ||||
PRN-24PIN | Dot Matrix Printer | [***] | ||||
9) |
Auxiliary Equipment | |||||
SUN-DAT72 | Tape Drive-SUN-DAT72 | [***] | ||||
MODEM-56K | Internal 56k Modem for Alarm Center and Dial Server | [***] | ||||
SW-PC Anywhere | Symantec PC Anywhere-11.0-English Version for Win95/98/ME/NT/2000/XP | [***] | ||||
TAPE-4mm 12G | DDS3/4mm/12G Cassettes for IBM01K1282 | [***] | ||||
XXX-XX-X0000 | Xxxxxxxxx Xxxxxxxxx Xxx X0000 (Including CD-ROM) | [***] | ||||
10) |
Tool Boxes | |||||
TOOL-SWITCH | Tool Boxes For NSS | [***] | ||||
TOOL-CDMA BSS | Tool Boxes For BSS | [***] | ||||
Subtotal Price | M2000 Hardware and OS Software | |||||
4.2 |
Software | |||||
M2000 Software | ||||||
1) |
M2000 Basic Software | |||||
SWP-M2000-ADAPTER | CDMA Adapter Package | [***] | ||||
SWP-M2000-BSS | BSS NMS Software Per CH | [***] | ||||
SWP-M2000-PDSN | PDSN NMS Software Per PPP Session | [***] | ||||
SWP-MAPX | Tools Software, MAPX Open License | [***] |
HUAWEI CONFIDENTIAL | Page 23 of 24 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Existing Test Lab Equipment List |
No. | Item | Description | QTY Total |
|||
HUAWEI CONFIDENTIAL | Page 24 of 24 |
NorthWest Market Upgrade (IP Interface) |
Quantity | ||||||
No. | Item | Description | Total | |||
MidHuge MGW (34.021K subs) | ||||||
1.2.1 |
Basic Equipment | |||||
Media Module | ||||||
UG-MHRU | Mobile Network High-speed Routing Unit | [***] | ||||
UG-MVPD2 | Mobile Network Voice Processing Unit D(1K TC,64ms EC) | [***] | ||||
KW-ME8T | Mobile Network 8-port 10/100M Ethernet Interface Board | [***] | ||||
KW-MNLU | Mobile network Link Unit | [***] | ||||
1.2.2 |
Software | |||||
Optional Software | ||||||
SWP-EVRC-4GVNB | EVRC-B (4GV-NB) (per CH) | |||||
SWP-UMGV-TrFO | TrFO Function per k subs | |||||
SWP-UMGV-RTO | Remote Transcoder Operation (RTO)(per k subs) |
HUAWEI CONFIDENTIAL | Page 1 of 5 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
NorthWest Market Upgrade (IP Interface) |
Quantity | ||||||
No. | Item | Description | Total | |||
MidHuge MGW (26.863K subs) | ||||||
1.1.1 |
Basic Equipment | |||||
Media Module | ||||||
UG-MHRU | Mobile Network High-speed Routing Unit | [***] | ||||
UG-MVPD2 | Mobile Network Voice Processing Unit D(1K TC,64ms EC) | [***] | ||||
KW-ME8T | Mobile Network 8-port 10/100M Ethernet Interface Board | [***] | ||||
KW-MNLU | Mobile network Link Unit | [***] | ||||
1.1.2 |
Software | |||||
Optional Software | ||||||
SWP-EVRC-4GVNB | EVRC-B (4GV-NB) (per CH) | |||||
SWP-UMGV-TrFO | TrFO Function per k subs | |||||
SWP-UMGV-TrFO | Remote Transcoder Operation (RTO)(per k subs) |
HUAWEI CONFIDENTIAL | Page 2 of 5 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
NorthWest Market Upgrade (IP Interface) |
Quantity | ||||||
No. | Item | Description | Total | |||
2.1 | BSC6600 ( CBTS: 55 TRX:450;Channel:6248 ) | |||||
2.1.1 |
Hardware | |||||
CIPS Module(1X) | ||||||
QC-CAPF | A Interface Packet Equipment over FE | [***] | ||||
2.1.2 |
Software | |||||
Optional Software | ||||||
SWP-EVRC-4GVNB | EVRC-B (4GV-NB) | |||||
SWP-CBSCF-TFO | Tandem Free Option Per CH |
HUAWEI CONFIDENTIAL | Page 3 of 5 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
NorthWest Market Upgrade (IP Interface) |
Quantity | ||||||
No. | Item | Description | Total | |||
2.1 | BSC6600 ( CBTS: 34 TRX:303;Channel:3888 ) | |||||
2.1.1 |
Hardware | |||||
CIPS Module(1X) | ||||||
QC-CAPF | A Interface Packet Equipment over FE | [***] | ||||
2.1.2 |
Software | |||||
Optional Software | ||||||
SWP-EVRC-4GVNB | EVRC-B (4GV-NB) | |||||
SWP-CBSCF-TFO | Tandem Free Option Per CH |
HUAWEI CONFIDENTIAL | Page 4 of 5 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
NorthWest Market Upgrade (IP Interface) |
Quantity | ||||||
No. | Item | Description | Total | |||
2.1 | BSC6600 ( CBTS: 36 TRX:288;Channel:4064 ) | |||||
2.1.1 |
Hardware | |||||
CIPS Module(1X) | ||||||
QC-CAPF | A Interface Packet Equipment over FE | [***] | ||||
2.1.2 |
Software | |||||
Optional Software | ||||||
SWP-EVRC-4GVNB | EVRC-B (4GV-NB) | |||||
SWP-CBSCF-TFO | Tandem Free Option Per CH |
HUAWEI CONFIDENTIAL | Page 5 of 5 |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
REQUIREMENTS
0 OF 21 PAGES
1 | Introduction |
2 | ||||
2 | Environmental requirements for switch room |
2 | ||||
2.1 | Temperature and humidity requirements |
2 | ||||
2.2 | Cleanness Requirements |
2 | ||||
2.3 | Noise |
3 | ||||
2.4 | Atmospheric Pressure |
3 | ||||
2.5 | Civil work in equipment room |
3 | ||||
2.6 | Safety requirements |
5 | ||||
2.7 | Grounding requirements |
5 | ||||
2.8 | Anti-Shock Measures |
7 | ||||
3 | Environmental requirements for outdoor CBTS3606AE |
7 | ||||
3.1 | Requirements for the climate |
7 | ||||
3.2 | Installation Request |
8 | ||||
3.3 | Power Supply System of DC Cabinet |
9 | ||||
3.4 | Power Supply System of AC Cabinet |
11 | ||||
4 | Environment Requirement For Isite BTS/ ODU3601CE |
12 | ||||
4.1 | Operation Environment Requirements |
12 | ||||
4.2 | Installation Requirement |
15 |
1 OF 21 PAGES
1 | Introduction | |
Environmental requirements involve the equipment room, grounding system, power supply system, lighting, noise, temperature adjustment system, water supply system, etc. These should be preceded in accordance with the results of the engineering designing and drawing evaluated by both parties. | ||
2 | Environmental requirements for switch room | |
2.1 | Temperature and humidity requirements | |
Air-conditioning equipment shall be installed in equipment room to adjust the indoor temperature and humidity so as to ensure the effective operation of all equipment. The requirements of temperature and humidity are shown as follows. |
Working | ||||||||||||
Condition | NSS,IN,SMC, OMC, BSC | Storage & Transportation | ||||||||||
Long
Term |
Temperature | 59°F ~ 86°F | -40°F ~ 158°F | |||||||||
Humidity | 40%~65 | % | 5% ~ 100 | % | ||||||||
Short
Term |
Temperature | 32°F ~ 113°F | -40°F ~ 158°F | |||||||||
Humidity | 20%~90 | % | 5% ~ 100 | % |
2.2 | Cleanness Requirements | |
2.2.1 | Dust Quantity and Particle Diameters | |
The dusts inside CDMA2000 room may lead to electrostatic adherence causing poor contact between metal plug-in units. This will reduce the life span of the equipment, and even cause fatal faults or failures. Therefore, the indoor dust content of the CDMA2000 room is required as follows: |
Maximum Diameter(µm) | 0.5 | 1 | 3 | 5 | ||||||||||||
Maximum Density (number of particles/per M3) |
14X10 | 5 | 7X10 | 5 | 24X10 | 4 | 13X10 | 4 |
The dust particle is non-conducting, non-magnetic and non-corrosive. |
2 OF 21 PAGES
2.2.2 | Harmful Gases | |
There are strict requirements for salinity, acid and sulfide content inside equipment room as well as dust content and particle diameter. The equipment room should also be protected from the intrusion of harmful gases such as SO2, H2S, NH3, NO2, etc., as these may cause corrosion of metals and thus accelerate the aging of certain parts. The relevant restrictions are specified as follows: |
Item | Average (mg / m3) | Maximum(mg / m3) | ||||||
SO2 |
0.2 | 1.5 | ||||||
H2S |
0.006 | 0.03 | ||||||
NO2 |
0.04 | 0.15 | ||||||
NH3 |
0.05 | 0.15 | ||||||
CL2 |
0.01 | 0.3 |
In addition, smoking is not allowed in the equipment room. | ||
2.3 | Noise | |
Noise in door <= 70dB. | ||
2.4 | Atmospheric Pressure | |
Atmospheric pressure from 1.08×105 to 5.1×104pa (-20 inches to +20 inches) is allowed. | ||
2.5 | Civil work in equipment room | |
2.5.1 | Area | |
The size of the equipment room shall be determined by the final capacity of the switching equipment. | ||
The location of the equipment in the equipment room shall take into account of the requirements on the maintenance passage. | ||
The minimum distance between the front of the racks and the wall should be 60~80 inches. | ||
The minimum distance between the rear of the racks and the wall should be 32~40 inches. | ||
The minimum width of the main aisles on the left and the right sides of the rack should be 48~60 inches, and that of the secondary aisle should be 24~32 inches. | ||
The front of the rack is preferred to be opposite to the control room (where the installation and maintenance terminal is positioned). |
3 OF 21 PAGES
2.5.2 | Height | |
The height from the beam to the floor should not be less than 120 inches and the indoors clear height is preferably over 112 inches. | ||
2.5.3 | Floor | |
Floor load (NSS, OMC, BSC, PDSN): > 100 lb./sq. ft. | ||
The floor shall be even and smooth. | ||
Equipment room floor materials must be static-proof. Only approved static-proof semi-conductive floor leather or water-washed stones shall be used. NSS/BSS equipment shall better use the static-proof movable floor boards, with supports 12 inches in thickness. The base station can be directly installed on the water-washed stone floor. | ||
In the power room and battery room, the minimum floor loading requirement is 176 lb./ sq. ft. | ||
2.5.4 | Doors and Windows | |
The exterior windows should be airtight and dust-proof. | ||
The door should be designed to facilitate equipment moving in and out. Double-leaf door is recommended. If single-leaf door is used, its width should be no less than 48 inches. The door should also be airtight and dust-proof. | ||
2.5.5 | Ceiling and Inner Walls | |
The equipment room ceilings, walls, doors, windows and floors must all be flush. to reduce or eliminate intrusion of dust particles and accumulation of dusts and sand The roof should be free of leaks and all decorative materials must be either non-flammable or otherwise difficult to set on fire. | ||
All grooves must be well protected against moisture. Their angles and sides shall be even and smooth, and the floors shall close tightly with the cover boards. Both the lighting and the power cables shall better be laid underneath. | ||
2.5.6 | Relationship between CDMA2000 room and other areas | |
If the capacity of the CDMA2000 switching equipment is above the average, a single equipment room is to be prepared and must be separated from the power distribution equipment, transmission equipment, and maintenance terminal. | ||
If located on the same floor, the equipment room and the control room shall be immediately next to the system equipment room so as to save control cables and for easy terminal maintenance. It is best to install it on both sides of the system equipment with glass walls separating the control room from the system equipment room. If the system equipment room is not on the same floor with other rooms, the |
4 OF 21 PAGES
line distribution room and power distribution room should be arranged on the floor under the system equipment room. |
2.5.7 | Color | |
The color of walls and ceilings shall be light and pleasing, and the paint shall be non-glossy and devoid of silicon oxides. | ||
2.5.8 | IP Bearer Requirement |
Network condition | Time Delay (One-Way) | PER | Jitter | |||
Good
|
£40ms | £0.1% | £1ms | |||
Normal
|
£100ms | £1% | £20ms | |||
Bad
|
£400ms | £5 % | £60ms |
To ensure QoS, IP bearer network should at least meet the criteria that jitter should be less than 10ms and PER should be less than 1%. | ||
2.5.9 | Others | |
The construction of the equipment room, corridor, and other important areas must be completed according with the specifications. | ||
The wall of the room must be dry enough. | ||
There must be enough grounding plates and power sockets in the equipment room. | ||
No water pipes are allowed to pass through the equipment room. If a heating system has to be installed in the area, no valve is allowed inside the equipment room in order to avoid water leakage. | ||
2.6 | Safety requirements | |
High-performance fire-fighting facilities shall be installed on the construction site. | ||
Distinctive labels must be attached onto the power sockets of different voltage ratings inside the equipment room. | ||
Hazardous materials marked as inflammable and explosive items should not be allowed inside the equipment room. | ||
Safety cover plate shall be positioned on the reserved holes of the floor. | ||
2.7 | Grounding requirements | |
Grounding guarantees the safe and stable operation of power supply and the CDMA2000 system equipment requiring special attention. In general, grounding includes the working ground, protection ground, and building lightning-proof ground. |
5 OF 21 PAGES
Normally, the working ground, protection ground, and building lightning-proof ground of the equipment room shall be separately prepared. But, due to limitations of the equipment room, combined grounding is also allowed. | ||
If separate grounding is used in the NSS equipment room the grounding resistance should be less than 1W. | ||
If combined grounding is used in the NSS and BSS equipment room the grounding resistance should be less than 1W. | ||
2.7.1 | Grounding system of the CDMA2000 equipment | |
On the rack of the switching equipment, two grounding bolts, GND and PGND are prepared. GND connects to the working ground of the switching equipment; inside, the various DC working power grounds are already connected to the case. PGND is the secondary protection circuit ground of the switching equipment trunk module, and can release excess electrical charges from safety units when connected to earth. | ||
Single point grounding to earth can lead out separately from the grounding bolts (GND and PGND) on the racks to connect to the equipment working ground. | ||
Lightning-proof measures for CDMA2000 system BTS equipment grounding: | ||
Outer conducting of the feeder shall be grounded via the feeder-grounding joint, while the inner conducting of the feeder shall be grounded via the coaxial lightning rods. | ||
The lightning-proof grounding bar shall be installed outside the equipment room. The conducting body of the indoor lightning rod support is also the discharging ground of the lightning rod. It is connected via the 3 inches cable to the outdoor grounding rods. | ||
2.7.2 | Grounding requirements of the AC power distribution system |
1. | The AC power distribution system requires an independent AC safety ground, and the protection ground assures that the AC power will be cut off. | ||
2. | Use of the power supply lightning-proof device can prevent interfering signals from entering into and through the AC power network, to guarantee normal operation of the AC power distribution system. | ||
3. | The AC power supply provided to computers only requires the live and neutral wires and no protection ground lines. | ||
4. | For switches with unstable power networks, or without AC regulators, over-voltage or under-voltage of the power network will lead to the damage of terminal equipment. So inverting terminal equipment for the power supply is recommended. | ||
5. | Grounding solutions |
6 OF 21 PAGES
Connection cables from the grounding rod to the equipment grounding bolts shall have copper cores and shall be as short as possible. | |||
All grounding connection pieces shall have anti-corrosion protection. | |||
Grounding bolts must be fastened mechanically. | |||
A minimum distance of 50 foot is required between any two different grounds. |
2.7.3 | The AC Power System | |
The AC power supply to computer terminal needs only a live wire or wires and grounding wire. The protective grounding shall not be used. | ||
The shell of the computer is required to connect with the protective grounding of the equipment. If the computer power supply adopts Inverter, then the shell of the inverter is also required to connect with the protective grounding of the equipment. | ||
Inside the equipment room, the customer shall provide an independent AC power supply for equipment operation. In addition the customer should supply an electric generator to supply standby AC power. The installation of the AC distribution panel, the battery sets, and the generator shall meet requirements of the customer’s related specifications. | ||
2.8 | Anti-Shock Measures | |
The following measures should be taken for the CDMA2000 equipment to resist earthquake effects under the eighth grade. | ||
The CDMA2000 equipment racks are made of an advanced aluminum alloy, which are light and sturdy. When the circuit boards are plugged into the rack, a locking device is engaged. Therefore, all of the equipment can be shipped with the boards plugged in to guard against any possible shock. | ||
The racks are fixed onto the ground with bolts. | ||
3 | Environmental requirements for outdoor CBTS3606AE | |
3.1 | Requirements for the climate |
Item
|
Range | ||
Temperature
|
Heat-exchanged cabinet: -40°C (-104°F) to 46°C (114.8°F) | ||
Temperature change rate
|
o 3°C (37.4°F)/min | ||
Relative humidity
|
5% to 100% | ||
Altitude
|
o 4 km [2.49 miles] | ||
Atmospheric pressure
|
70 kPa to 106 kPa | ||
Solar radiation
|
o 1120 W/m2 | ||
Heat radiation
|
o 600 W/m2 | ||
Wind speed
|
o 50 m [164.04 ft.] /s |
7 OF 21 PAGES
3.2 | Installation Request | |
Cement Plinth for a Single BTS3606AE Cabinet | ||
When installing a single BTS3606AE cabinet, cast a cement plinth. | ||
Figure 1 shows the outline and dimensions of the cement plinth. | ||
Figure 1 Outline and dimensions of the cement plinth |
The height of the cement plinth must meet the flood protection requirement in the local area. The cement plinth should be at least 100 mm [3.94 in.] higher than the ground surface. This helps protect the cabinet against water penetration in the case of heavy rain or flood and ensures that the snow does not cover the air inlet at the lowest part of the cabinet in the case of heavy snow. | ||
After the plinth is cast, use a level bar to measure the level and planeness of the plinth. Ensure that the level error of the plinth and the planeness error of the upper plane are not more than 5 mm [0.20 in.]. | ||
Cement Plinth for a BTS3606AE Cabinet and a Battery Cabinet | ||
When a BTS3606AE cabinet is configured with a battery cabinet, cast a cement plinth. | ||
Figure 2 shows the outline and dimensions of the cement plinth. | ||
Figure 2 Outline and dimensions of the cement plinth for the BTS3606AE cabinet and battery cabinet |
8 OF 21 PAGES
The requirements for the thickness, level, and planeness of the plinth are the same as those for the installation of a single BTS3606AE cabinet. | ||
Cement Plinth for a Battery Cabinet in System Expansion | ||
The BTS3606AE cabinet is installed. When a battery cabinet is required for system expansion, enlarge the cement plinth to the dimensions, as shown in Figure 2. The requirements for the thickness, level, and planeness of the plinth are the same as those for the installation of a single BTS3606AE cabinet. | ||
3.3 | Power Supply System of DC Cabinet |
3.3.1 | Input Power Supply |
9 OF 21 PAGES
3.3.2 | Requirements for DC Power Supply |
10 OF 21 PAGES
3.3.3 | High Frequency Switch Rectifier |
3.4 | Power Supply System of AC Cabinet |
3.4.1 | Input Power Supply |
3.4.2 | Requirements for AC Power Supply |
11 OF 21 PAGES
Power Supply Mode
|
Voltage Range | |
Direct mains mode
|
The power supply voltage should not exceed the rated
voltage by +5% or –10% and should not exceed the range
allowed by the communication equipment. Otherwise, the power supply voltage must be adjusted. |
|
Indirect mains mode
|
The power supply voltage should not exceed the rated
voltage by +10% or –15% and should not exceed the
range allowed by the DC power equipment. Otherwise, the power supply voltage must be adjusted. |
|
Input Voltage
|
90% to 110% of the nominal voltage | |
Power Frequency
|
98% to 102% of the nominal power frequency | |
Voltage Distortion
|
The total harmonic wave component should be no greater than 10%. | |
4 | Environment Requirement For Isite BTS/ ODU3601CE | |
4.1 | Operation Environment Requirements | |
4.1.1 | Operation Environment |
12 OF 21 PAGES
Temperature | Relative Humidity | |
–40 oC to +52 oC [–40oF to +125.6oF] |
5%–100% |
Item
|
Range | ||
Altitude
|
<= 4000 m | ||
Air pressure
|
70 kPa–106 kPa | ||
Temperature change rate
|
<= 5 oC /min | ||
Solar radiation
|
<= 1,120 W/m 2 | ||
Rain
|
<= 12.5 L/min ±0.625 L/min (IPX5) | ||
Wind speed
|
<= 50 m/s | ||
13 OF 21 PAGES
Physically Active Material | Unit | Density | ||
Suspending dust |
mg/m3 | <= 5 | ||
Falling dust |
mg/m2.h | <= 20 | ||
Sands |
mg/m3 | <= 300 |
Requirements for chemically active materials in operation environment |
Chemically Active Material | Unit | Density | ||
SO2 |
mg/m3 | <= 0.30 | ||
H2S |
mg/m3 | <= 0.10 | ||
NH3 |
mg/m3 | <= 1.00 | ||
Cl2 |
mg/m3 | <= 0.10 | ||
HCl |
mg/m3 | <= 0.10 | ||
HF |
mg/m3 | <= 0.01 | ||
O3 |
mg/m3 | <= 0.05 | ||
NO2 |
mg/m3 | <= 0.5 | ||
14 OF 21 PAGES
Item | Sub-item | Range | ||||
Sinusoidal vibration |
Offset | <= 3.5 mm | — | |||
Accelerated speed | — | <= 10.0 m/s2 | ||||
Frequency range | 2 Hz–9 Hz | 9 Hz–200 Hz | ||||
Unsteady impact |
Impact response spectrum II | <= 100 m/s2 | ||||
Static payload | 0 |
4.2 | Installation Requirement |
No. | Item | Requirement | ||
1
|
Site selection | • The site shall not be full of dust and harmful
gases or be subject to a high temperature, flammable
materials, explosive materials, electromagnetic
interference (large-sized radar station, radio
transmitting station, electric substation), or instable
voltage. |
||
• The site shall not be subject to frequent heavy
quakes or strong noises and far away from all kinds of
pollution resources. |
||||
• During engineering planning, you shall select a
site suitable for outdoor communications equipment by
taking into such factors as hydrology, geology,
earthquake, electric power, and transportation. |
||||
• It is advised not to install a BTS in a place
close to the seaside. The distance from the seaside shall
be greater than 500 m. The intake of the cabinet shall be
opposite to the wind from the sea. |
15 OF 21 PAGES
No. | Item | Requirement | ||
2
|
Site construction | • In the single pole installation mode, we need
install three equipment with the same level. The angel
between two equipment is around 120 ° |
||
3
|
Environment | The temperature and humidity specified requirment see
above description. |
||
4
|
Grounding resistance | • The working ground and protection ground of all
the communications devices inside the site shall work in
the mode of joint grounding. That is to say, the working
ground and protection ground shall share the same ground
counterpoise. All the communications equipment and
corresponding auxiliary equipment (mobile BTSs,
transmission devices and power supply units) in the same
communications site shall be well grounded and connected
to the same grounding bus bar. |
||
• The grounding resistance shall be smaller than 5
W. For the regions where the thunderstorm days are
smaller than 20, the resistance can be smaller than 10
W. |
||||
• The upper end of the grounding conductor shall be
at least 0.7 m above the ground. In the frigid climate,
the grounding conductor shall be buried under the frozen
soil. |
||||
5
|
Grounding inlead | The grounding inlead shall be no more than 30 m long. You
shall select the galvanized steel flat with the cross
sectional area of either 40 mm × 4 mm or 50 mm × 5 mm. |
16 OF 21 PAGES
No. | Item | Requirement | ||
6
|
AC voltage | • The AC voltage of the equipment room is kept
between 90 V AC and 135 V AC (the rated frequency should
be between 47 Hz and 63 Hz). The AC power distribution
switches and the AC power cables are installed in
position. |
||
• When the stability of the voltage does not meet
the requirements, you shall take necessary measures either
by using a voltage regulator or voltage stabilizer. |
||||
• If the power protection device is installed before
the power interface box, the specifications of its through
current shall be greater than or equal to those of the MCB
inside the power interface box. |
||||
• You shall not install the creepage protection
device to the power protection device installed before the
power interface box. |
||||
7
|
AC grounding | The AC power supply system shall have its independent AC
safety ground. |
||
8
|
Lightning protection | • The AC lightning protection box shall be installed
to the AC power supply system of the equipment room. The
cross sectional area of the grounding cable of the box
shall be greater than 25 mm2. The cable shall shorter than
30 m. |
||
• In plains, the protection angle of the antenna
shall be smaller than 45°. In mountainous regions or
regions where thunders frequently occur, the angle shall
be smaller than 30°. |
||||
9
|
Trunk cable | Do not route the trunk cables overhead outdoors. If you
have to, you shall use double-shielded or metal-shielded
cables. The outer shielding layer or the metal shielding
of the cable shall be connected to the protection
grounding bar of the equipment room. |
||
10
|
Transmission system | The Transmission equipment working temperature should
reach 149 °F. |
17 OF 21 PAGES
No. | Item | Requirement | ||
11
|
Antenna and feeder system | • The stands of the antenna are installed as
required. |
||
• The lightning arrester of the antenna and feeder
system is installed as required and is well grounded. |
(1) | The length of pole should be 10m at least, with diameter of 190mm at least, its performance should be meet the requirement. | ||
(2) | The top of steel pole should be blocked up, mainly to prevent from water after iSite/ODU is to run. | ||
(3) | The buried length must be calculated by capsizing, the minimum buried length is listed as table below: |
Height of pole(m)
|
8.0 | 9.0 | 10.0 | 11.0 | 12.0 | 13.0 | 15.0 | 18.0 | ||||||||||||||||||||||||
Buried length(m)
|
1.5 | 1.6 | 1.7 | 1.8 | 1.9 | 2.0 | 2.3 | 2.6~«3.0 |
(4) | Special handling required when it erected at places where there exists soft soil, drift sand or solid rocks. | ||
(5) | The pole hole of common ground must be paved underpan in cement , with dimension of 80×80×210cm. | ||
(6) | For iSite/ODU installing on bad ground, which is necessary to span 4 cables in two side, the rate of distance height should be 1:1, and buried height should meet the requirement; if it is installed on the slope, the height of hole should be calculated from the lowest side of slope; | ||
(7) | vertical angle of pole should be 2/1000 of height of pole at most. | ||
(8) | Earthquake resistance: One grade above the local breaking strength. | ||
(9) | Wind load: Peak wind speed (km/h or m/s) 10 meters above the ground in a decade. |
18 OF 21 PAGES
19 OF 21 PAGES
20 OF 21 PAGES
FOR
HUAWEI
System |
Core Network | Radio Access | Others | |||
1xRTT |
MSC Server | BSC (1X/1xEV-DO) | ||||
1xEV-DO Rev. A |
Media Gateway | BTS (dual band PCS/AWS) | ||||
TrFO/RTO | Backhaul Enhancement/IP over T1 | |||||
Open IOS Interface | REMOTE BSC/MGW Support | |||||
IOS v5.0.1 Packet Interface | ODU remote RF module | |||||
EVRC-B/4GV-NB Vocoder |
Assumption Parameter | Value | |
Average busy hour mobile traffic |
0.075 Erl | |
Average mobile call duration |
120s | |
Average busy hour trunk traffic |
0.8 Erl | |
Average busy signaling traffic |
0.2Erl /64k 0.1Erl/ 1.5M |
|
Voice activaty rate |
0.4 | |
Average trunk call duration |
120s | |
CPU usage |
80% | |
Trunk blocking rate |
1% | |
Air interface blocking rate |
2% | |
Ratio of # of SMS subs to # of total subs |
80% | |
Ratio of # of VMS subs to # of total subs |
90% | |
Soft handoff rate (Primary Erlang/ Wash Code Erlang) |
50% |
MSCe Capacity (Maximum) | ||||||
Description
|
Traffic Intensity | BHCA | Subscribers | |||
MSCe
|
135k Erlangs @ 120 sec. AHT (Note 1) |
4800k BHCA (Note 2) | 1.69 M (Note 3) |
MGW Capacity |
||||||
Description
|
Traffic Intensity | BHCA | Subscribers | |||
MGW
|
76K Erlangs @ 120 sec. AHT (note 1) |
2700k BHCA (note 2) | 1.01 M (note 3) |
MGW — # of T1’s | ||||
Description
|
# of T1 links | # of FE | ||
MGW
|
4000 | 112 |
MSC — # of MGWs |
||||
Description
|
# of MGWs | |||
MSCe
|
300 (note ) |
MSCe — # of BSCs |
||||
Description
|
# of BSCs | |||
MSCe
|
64 (note ) |
MGW — # of BSCs |
||||
Description
|
# of BSCs | |||
MGW
|
64 (note ) |
MSCe — Capacity Growth | ||||||||||||
2008 | 2009 | 2010 | ||||||||||
BHCA
|
4800K | Note 1 | Note 1 | |||||||||
Erlang
|
135K | |||||||||||
MGW — Capacity Growth | ||||||||||||
2008 | 2009 | 2010 | ||||||||||
BHCA
|
2700k | Note 1 | Note 1 | |||||||||
Erlang
|
76K |
BSC Capacity (1X traffic) | ||||
Description
|
Traffic Intensity | BHCA | ||
BSC
|
50k Erlangs @ 120 sec. AHT (note 1) | 7,800,000 BHCA (note 2) |
BSC Capacity for 1xEV-DO Only | ||||||||
Description
|
Total FL Throughput | RL Throughput | # of UATI Sessions | # of Active Connections | ||||
BSC
|
3,000 Mbps (Note 1, 2) | See Note 2 | 630k | 60k |
BSC — # of BTS’s |
||||
Description
|
# of BTS’s | # of BTS’s (EV-DO) | ||
BSC
|
2000 3-sector BTS’s (or 6000 sector-carrier) (note 1) | 6000 sector-carrier (note 1) |
Embedded Sector Erlang Capacity | ||||
Description
|
EVRC | EVRC-B/4GV-NB | ||
Average Power per Primary Erlang not to exceed 33% of Pilot Power | See 2.3.1 below. | |||
Average power per Primary Erlang: 0.61 W |
- | Measured power for calculation to not include Overhead Channel Power | ||
- | FER Set Point not to exceed 2% | ||
- | 2% air interface soft blocking | ||
- | 70% air interface capacity | ||
- | 50% SHO | ||
- | Overhead channel power account to 33%. | ||
- | 20 watt transmitting power per sector carrier. |
- | Calculate Average Power Per Primary Erlang at the following intervals after commercial launch to ensure compliance: |
o | 60 Days | ||
o | 180 Days |
Interference Cancellation
|
§ FL Pilot, Overhead and Traffic channels interference cancellation | |
§ 25% FL capacity improvement | ||
§ 1.9dB link improvement in highly loaded networks |
BTS Climate Requirement | ||||
Description
|
Ambient Temperature | Relative Humidity | ||
BTS
|
Heat-exchanged cabinet: -40°C to +52°C [-40°F to 125.6°F] | 5% to 100% | ||
ODU
|
-40°C to +52°C [-40°F to +125.6°F] | 5% to 100% |
IP Backbone Capacity and Quality Tolerance | ||||||
Description
|
Time Delay (one-way) | PER | Jitter | |||
BSC-MGW
|
<100ms | <1% | <20ms | |||
BSC-BTS
|
< 250ms | <1% | < 25 ms |
IP over T1 - # of Voice Channels | ||
Description
|
# of VCs | |
Per T1 (1.544 Mbps)
|
160 per T1 (note 1) |
- | Improve voice quality by reducing unnecessary transcoding stages between 2 telecommunication points | ||
- | Cost reduction in vocoder resources with placement of vocoders in MGW | ||
- | Transmission cost savings with compressed voice packets instead of full frame PCM |
A.S0011-C v2.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 1 Overview (IOS v5.0.1) | IOS v5.0.1 | ||
A.S0012-C v2.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 2 Transport (IOS v5.0.1) | IOS v5.0.1 |
A.S0013-C v2.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 3 Features (IOS v5.0.1) | IOS v5.0.1 | ||
A.S0014-C v2.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 4 (A1, A1p, A2, and A5 Interfaces) (IOS v5.0.1) | IOS v5.0.1 | ||
A.S0011-A v1.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 1 Overview | IOS 4.3 | ||
A.S0011-A v2.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 1 Overview | IOS 4.3 | ||
A.S0011-A v2.0.1
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 1 Overview | IOS 4.3 | ||
A.S0011-B v1.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 1 Overview | IOS 4.3.1 | ||
A.S0012-A v1.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 2 Transport | IOS 4.3 | ||
A.S0012-A v2.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 2 Transport | IOS 4.3 | ||
A.S0012-A v2.0.1
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 2 Transport | IOS 4.3 | ||
A.S0012-B v1.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 2 Transport | IOS 4.3.1 | ||
A.S0013-A v1.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 3 Features | IOS 4.3 | ||
A.S0013-A v2.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 3 Features | IOS 4.3 | ||
A.S0013-A v2.0.1
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 3 Features | IOS 4.3 | ||
A.S0013-B v1.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 3 Features | IOS 4.3.1 | ||
A.S0014-A v1.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 4 (A1, A2 and A5 Interfaces) | IOS 4.3 | ||
A.S0014-A v2.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 4 (A1, A2 and A5 Interfaces) | IOS 4.3 | ||
A.S0014-A v2.0.1
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 4 (A1, A2 and A5 Interfaces) | IOS 4.3 | ||
A.S0014-B v1.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 4 (A1, A2, and A5 Interfaces) | IOS 4.3.1 | ||
A.S0015-A v1.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 5 (A3 and A7 Interfaces) | IOS 4.3 | ||
A.S0015-A v2.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 5 (A3 and A7 Interfaces) | IOS 4.3 |
A.S0015-A v2.0.1
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 5 (A3 and A7 Interfaces) | IOS 4.3 | ||
A.S0015-B v1.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 5 (A3 and A7 Interfaces) | IOS 4.3.1 | ||
A.S0016-A v1.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 6 (A8 and A9 Interfaces) | IOS 4.3 | ||
A.S0016-A v2.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 6 (A8 and A9 Interfaces) | IOS 4.3 | ||
A.S0016-A v2.0.1
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 6 (A8 and A9 Interfaces) | IOS 4.3 | ||
A.S0016-B v1.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 6 (A8 and A9 Interfaces) | IOS 4.3.1 | ||
A.S0017-A v1.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 7 (A10 and A11 Interfaces) | IOS 4.3 | ||
A.S0017-A v2.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 7 (A10 and A11 Interfaces) | IOS 4.3 | ||
A.S0017-A v2.0.1
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 7 (A10 and A11 Interfaces) | IOS 4.3 | ||
A.S0017-B v1.0
|
Interoperability Specification (IOS) for cdma2000 Access Network Interfaces — Part 7 (A10 and A11 Interfaces) | IOS 4.3.1 | ||
A.S0008-0 v3.0
|
Interoperability Specification (IOS) for High Rate Packet Data (HRPD) Access Network Interfaces | TIA-878-1 pub |
FOR
HUAWEI
System | Core Network | Radio Access Network | Others | |||
1xEV-DO Rev. A | Open Media Gateway Interface |
Femto Cell Technology | ||||
WiMax/TDD | Smart Antenna | |||||
BTS for WiMax/TDD Overlay with 1xEV-DO |
||||||
TrFO/RTO Support for EVRC-B/4GV-NB Vocoder |
||||||
1xEV-DO Rev. A QoS |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
• | Support Geographical Power Amplifier Radiation Control to prevent radiating when not in Owner and related entities’ licensed spectrum. | ||
• | Provide software to setup and control PA output power. | ||
• | Support different backhaul types including DSL, cable, Wimax, dial up connections, if chipset is capable to deal with these backhaul types. | ||
• | Support QoS control to guarantee quality of user experience. | ||
• | Be able to control Femto system acquisition without CDMA standard changes. E.g.: use of PRL to achieve access control, if chipset is capable to support this feature. | ||
• | Control unauthorized access. | ||
• | Support performance and capacity to allow no less than 4 simultaneous users per technology, if chipset capable on these connection.. |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
1. | Vendor commits to support Dual band (PCS & AWS) CDMA2000 BTS (in a single cabinet) and over a common coaxial cable with less than 0.5 dB combining loss within [***] after the effective date of new A66 SEPA. | |
2. | Vendor commits to support Dual band (PCS & AWS) switched from a single soft switch within [***] after the effective date of new A66 SEPA. | |
3. | Vendor commits to support Dual band (PCS & AWS) BTS backhaul to a single BSC within [***] after the effective date of new A66 SEPA. | |
4. | Vendor commits to support WiMax/FDD on PCS and AWS spectrum if Owner or any Related Entity publicly announces to commercially launch a WiMax/FDD network and a significant business is granted to Huawei. |
• | Commitment will include WiMax and CDMA2000 on PCS and AWS spectrum in the same existing BTS cabinet. The existing CDMA2000 system and the WiMax/FDD system will share the same power, backhaul and antenna feeders with a maximum of 0.5 dB additional insertion loss. Vendor will provide the MFC price to Owner as set forth in Section 5.1 of SEPA. | ||
• | Vendor believes that WiMax in AWS with FDD mode is one of the tasks industry is paying more attention to. IEEE 802.16m standard which is supported considerably by Huawei has put that consideration in priority and is planned to advance the completion of 16m standard in [***]. Vendor is willing to discuss with Leap regarding product availability timeframe. The timeframe Vendor supports will harmonize market demand and standard development. |
5. | In the event that Owner or any Related Entity decides to deploy EVDO Rev B on PCS and AWS. Vendor will commit to develop EV DO Rev B software upgrade version based on CSM6800 ASIC hardware product, within [***] of the public announcement of such decision while a significant business is granted to Huawei. Vendor will commit to develop EV DO Rev B based on CSM6850 ASIC if requested by owner and if this solution is developed by Owners other infrastructure vendors. |
• | Subject to general industry acceptance (including Qualcomm and deployment by at least 1 US Tier 1 carrier (irrespective of whether or not a customer of Vendor.) |
6. | In the event that Owner or any Related Entity decides to deploy EVDO Rev C (UMB) on PCS and AWS, the Vendor will commit to develop UMB with CDMA2000 and UMB in the same existing BTS cabinet. The existing CDMA2000 system and the UMB system will share the same power, backhaul and antenna with a maximum of 0.5 dB additional insertion loss,. The general availability of Huawei product offering is planned to be at [***]. Time can be considered moving ahead when Owner decides an earlier commercial deployment and a significant business is granted to Huawei. |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
• | Subject to general industry acceptance (including Qualcomm and commercial deployment by at least 1 US Tier 1 carrier (irrespective of whether or not a customer of Vendor.) |
7. | In the event that Owner or any Related Entity decides to deploy LTE, the Vendor will commit to develop LTE on AWS and PCS bands with CDMA2000 and LTE in the same existing BTS cabinet. The existing CDMA2000 system and the LTE system will share the same power, backhaul and antenna feeders with a maximum of 0.5 dB additional insertion loss. The general availability time of Vendor LTE product is planned to be at [***]. The time can be considered moving ahead when Owner decides an earlier commercial deployment and a significant business is granted to Huawei. Vendor hopes to have another open dialogue with Owner between [***] and [***] to further determine the GA time for LTE product in AWS and PCS bands. |
• | Subject to general industry acceptance (deployment by at least 1 US Tier 1 carrier (irrespective of whether or not a customer of Vendor.)) |
8, | VoIP In the event that Owner or any Related Entity decides to deploy VoIP over 1xEV-DO Rev.A, the Vendor will commit to develop it on AWS and PCS band. The general availability time of this feature is planned to be at [***]. | |
9. | IMS, In the event that Owner or any Related Entity decides to deploy IMS architecture, the Vendor will commit to be able to reprogram the supplied CSoft3000 MSCe and UMG8900 MGW hardware platform to function in an IP Multimedia Subsystem (IMS) architecture with reasonable hardware upgrade/expansion to inter-work with other IMS components. The general available date for Softswitch to MGCF and MGW to IM-MGW will be [***]. | |
10. | FMC In the event that Owner or any Related Entity decides to deploy any FMC services, the Vendor commit to provide solution based on IMS architecture. The general availability time of VCC over IMS architecture is planned to be [***] after it is standardized in 3GPP2. The time can be moving ahead when Owner decides an earlier commercial deployment and a significant business is granted to Huawei. Vendor hopes to have another open dialogue with Owner between [***] and [***] to further determine the GA time for FMC solutions. VCC Subject to general industry dual-mode terminals. | |
11. | Vendor will comply to 3GPP2, 3GPP and IEEE standards requirement in supporting 3G and 4G inter-operabilities wherever applicable. Vendor will in a timely manner develop interoperability solutions between Owners or any Related Entity existing 3G network and Owners or any Related Entity chosen 4G technology in compliance with standards from 3GPP, 3GPP2 and IEEE. | |
12, | Vendor will comply to 3GPP2, 3GPP and IEEE standards requirement in supporting channel bandwidths wherever applicable, including 4G (LTE or UMB) with 1.25MHz bandwidth. Vendor commits to making the Owner’s chosen 4G technology scalable in the infrastructure equipment from 1.25 MHz channel bandwidth and upwards to 20 MHz channel bandwidth. As for WiMax/FDD, vendor commits to making it scalable in the smallest increments specified by the standard. |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Purchasing Process
• | Hardware items with Supplier part numbers, description, quantity, cost per item, extended cost, applicable discounts and effective date(s). | ||
• | Software items with Supplier part numbers, description, quantity, cost per item, extended cost, applicable discounts and effective date(s). | ||
• | Services with Supplier item numbers (when applicable), description, unit of measure, cost per service, extended cost, applicable discounts and effective date(s). |
LEAP A66 Market Market Network Architecture HUAWEI TECHNOLOGIES CO., LTD. xxx.xxxxxx.xxx In the event of any conflict or inconsistency between the terms of the Amended and Restated System Equipment Purchase Agreement and this exhibit, such conflict or inconsistency shall be resolved by giving precedence to the Agreement. |
Network Dimension Owner Traffic Detail Owner Traffic Detail Owner Traffic Detail Owner Traffic Detail Owner Traffic Detail Owner Traffic Detail Owner Traffic Detail Owner Traffic Detail Owner Traffic Detail Owner Traffic Detail Owner Traffic Detail Owner Traffic Detail Market Covered Pops Subs Xxxxxxx Xxxxx X0 X0 X0 X0 0xxx XXXx MGW BSC Market A [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] Market B [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] Market C [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] OWNER Total [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] * The number of Erlangs here are included [***]% overhead ratio. * In the event of actual delivery of BTS/Cell site(s) quantity differs with the predetermined quantity as stated here, the actual BTS/Cell site(s) quantity will be determined by Exhibit B Table-2. _______________ *** Certain information on this page has been omitted and filed separately with the Commission. |
[***] _______ *** Certain information on this page has been omitted and filed separately with the Commission. |
EXHIBIT R | SYSTEM MAINTENANCE & OPERATION DOCUMENT LIST |
Operation Document List
EXHIBIT R | SYSTEM MAINTENANCE & OPERATION DOCUMENT LIST |
EXHIBIT R
|
0 | |||
TABLE OF CONTENTS
|
1 | |||
1 BSC
|
2 | |||
2 BTS3606A
|
2 | |||
3 Softswitch
|
3 | |||
4 UMG8900
|
3 |
1 OF 5 PAGES
EXHIBIT R | SYSTEM MAINTENANCE & OPERATION DOCUMENT LIST |
1 | BSC | |
cBSC6600 Technical Manual-System Description | ||
cBSC6600 Technical Manual-System Architecture | ||
cBSC6600 Technical Manual-Interfaces and Xxxxxxxxx | ||
xXXX0000 Technical Manual-System Function | ||
cBSC6600 Maintenance Manual-Parts Replacement | ||
cBSC6600 Maintenance Manual-Troubleshooting | ||
cBSC6600 Maintenance Manual-Routine Maintenance | ||
cBSC6600 Maintenance Manual-Emergency Maintenance | ||
cBSC6600 Installation Manual-Software Installation | ||
cBSC6600 Installation Manual-Hardware Installation | ||
cBSC6600 Installation Manual-System Commissioning | ||
cBSC6600 Operation Manual-Data Configuration | ||
cBSC6600 Compliance and Safety Manual | ||
cBSC6600 Hardware Description Manual |
2 | BTS3606A E | |
BTS3606AE Technical Manual | ||
BTS3606AE Cabinet Installation Manual | ||
BTS3606&3606AE Maintenance Manual | ||
BTS3606&3606AE Installation Reference | ||
BTS3606&3606AE Antenna & Feeder Installation | ||
XXX0000&0000XX XX & XX | ||
XXX0000&0000XX Data Configuration Manual | ||
BTS3606&3606AE CDMA Base Station Documentation Guide | ||
BTS3606&3606AE Compliance and Safety Manual |
2 OF 5 PAGES
EXHIBIT R | SYSTEM MAINTENANCE & OPERATION DOCUMENT LIST |
BTS3606&3606AE Hardware Description Manual | ||
3 | Softswitch | |
CSOFTX3000 Mobile SoftSwitch Center Operation Manual-Routine Operation | ||
CSOFTX3000 Mobile SoftSwitch Center Feature -Description Manual | ||
CSOFTX3000 Mobile SoftSwitch Center Operation Manual-Data Configuration | ||
CSOFTX3000 Mobile SoftSwitch Center Technical Manual-System Description | ||
CSOFTX3000 Mobile SoftSwitch Center Maintenance Manual-Troubleshooting | ||
CSOFTX3000 Mobile SoftSwitch Center Maintenance Manual-Routine Maintenance | ||
CSOFTX3000 Mobile SoftSwitch Center Technical Manual-System Architecture | ||
CSOFTX3000 Mobile SoftSwitch Center CDR User Manual | ||
CSOFTX3000 Mobile SoftSwitch Center Technical Manual-Service Procedures | ||
CSOFTX3000 Mobile SoftSwitch Center Installation Manual-Hardware Installation | ||
CSOFTX3000 Mobile SoftSwitch Center Installation Manual-System Commissioning | ||
CSOFTX3000 Mobile SoftSwitch Center Installation Manual-Software Installation | ||
CSOFTX3000 Mobile SoftSwitch Center Maintenance Manual-Emergency Maintenance | ||
CSOFTX3000 Mobile SoftSwitch Center Maintenance Manual-Parts Replacement | ||
CSOFTX3000 Mobile SoftSwitch Center Performance Measurement Manual | ||
CSOFTX3000 Mobile SoftSwitch Center Compliance and Safety Manual | ||
CSOFTX3000 Mobile SoftSwitch Center Hardware Description Manual | ||
CSOFTX3000 Mobile SoftSwitch Center Documentation Guide | ||
CSOFTX3000 Mobile SoftSwitch Center iGateway Xxxx User Manual | ||
4 | UMG8900 | |
UMG8900 Universal Media Gateway Maintenance Manual-Troubleshooting | ||
UMG8900 Universal Media Gateway Operation Manual — Routine Operation | ||
UMG8900 Universal Media Gateway Installation Manual — Hardware Installation |
3 OF 5 PAGES
EXHIBIT R | SYSTEM MAINTENANCE & OPERATION DOCUMENT LIST |
UMG8900 Universal Media Gateway Documentation Guide | ||
UMG8900 Universal Media Gateway Installation Manual — Software Installation | ||
UMG8900 Universal Media Gateway Technical Manual — Architecture and Principle | ||
UMG8900 Universal Media Gateway Maintenance Manual — Emergency Maintenance | ||
UMG8900 Universal Media Gateway Maintenance Manual — Parts Replacement | ||
UMG8900 Universal Media Gateway Maintenance Manual — Routine Maintenance | ||
UMG8900 Universal Media Gateway Operation Manual — Data Configuration | ||
UMG8900 Universal Media Gateway Operation Manual — Performance Item | ||
UMG8900 Universal Media Gateway Operation Manual — Performance Measurement | ||
UMG8900 Universal Media Gateway Maintenance Manual — Fault Cases | ||
UMG8900 Universal Media Gateway Installation Manual — System Commissioning | ||
UMG8900 Universal Media Gateway Hardware Description Manual | ||
UMG8900 Universal Media Gateway Technical Manual — System Description |
4 OF 5 PAGES
EXHIBIT S
[RESERVED]
CDMA System Product Description Document List |
1. | System Description of CSOFTX3000 — MSCe (MSC Server — Soft switch) | |
2. | System Description of UMG8900 — MGW (Media Gateway) | |
3. | System Description of BSC6600 — BSC (Base Station Controller) | |
4. | System Description of BTS3606AE — BTS (Outdoor Base Transceiver Station) | |
5. | System Description of ODU3601CE — DAS (Outdoor Distributed Antenna System) | |
6. | System Description of M2000 — OA&M (Operation, Administration & Maintenance) |
1 | General Avaible(GA) Timeline | [***] | ||||||
2 | Volume Shipping Timeline | [***] | ||||||
3 | Monthly producation capability | From [***] BTS to [***] BTS after GA timeline. It depends on the quantity and other requirements before GA timeline. | ||||||
4 | If these activity happen on USA or China official holiday, the date will be delayed according to the holiday duration. | |||||||
5 | The receipt date of PO is different, its lead time is different.Details are as below. |
BTS3606AE | ||||||||
FOB SHENZHEN | Clearance in [***] | Arrive in warehouse | Arrive in Owner’s site | |||||
QTY
|
By Sea | |||||||
<200
|
[***] | [***] | [***] | [***] | ||||
201-300
|
[***] | [***] | [***] | [***] | ||||
301-400
|
[***] | [***] | [***] | [***] | ||||
401-500
|
[***] | [***] | [***] | [***] | ||||
501-600
|
[***] | [***] | [***] | [***] | ||||
601-700
|
[***] | [***] | [***] | [***] | ||||
701-800
|
[***] | [***] | [***] | [***] | ||||
901-1000
|
[***] | [***] | [***] | [***] | ||||
1001-1100
|
[***] | [***] | [***] | [***] | ||||
1101-1200
|
[***] | [***] | [***] | [***] | ||||
1201-1300
|
[***] | [***] | [***] | [***] | ||||
1301-1400
|
[***] | [***] | [***] | [***] | ||||
1401-1500
|
[***] | [***] | [***] | [***] | ||||
1501-1600
|
[***] | [***] | [***] | [***] |
BSC System | ||||||||
FOB SHENZHEN | Clearance in [***] | Arrive in warehouse | Arrive in Owner’s site | |||||
QTY
|
By Sea | |||||||
<4
|
within one week from Oct.30 | 4 wks from the shipment | 6 wks from the shipment | 7 wks from the shipment |
MSC | ||||||||
FOB SHENZHEN | Clearance in [***] | Arrive in warehouse | Arrive in Owner’s site | |||||
QTY
|
By Sea | |||||||
<3
|
[***] | [***] | [***] | [***] |
MGW | ||||||||
FOB SHENZHEN | Clearance in [***] | Arrive in warehouse | Arrive in Owner’s site | |||||
QTY
|
By Sea | |||||||
<3
|
[***] | [***] | [***] | [***] |
M2000 | ||||||||
FOB SHENZHEN | Clearance in [***] | Arrive in warehouse | Arrive in Owner’s site | |||||
QTY
|
By Sea | |||||||
<3
|
[***] | [***] | [***] | [***] |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
BTS3606AE | ||||||||
FOB SHENZHEN | Clearance in [***] | Arrive in warehouse | Arrive in Owner’s site | |||||
QTY
|
By Sea | |||||||
<200
|
[***] | [***] | [***] | [***] | ||||
201-300
|
[***] | [***] | [***] | [***] | ||||
301-400
|
[***] | [***] | [***] | [***] | ||||
401-500
|
[***] | [***] | [***] | [***] | ||||
501-600
|
[***] | [***] | [***] | [***] | ||||
601-700
|
[***] | [***] | [***] | [***] | ||||
701-800
|
[***] | [***] | [***] | [***] | ||||
901-1000
|
[***] | [***] | [***] | [***] | ||||
1001-1100
|
[***] | [***] | [***] | [***] | ||||
1101-1200
|
[***] | [***] | [***] | [***] | ||||
1201-1300
|
[***] | [***] | [***] | [***] | ||||
1301-1400
|
[***] | [***] | [***] | [***] | ||||
1401-1500
|
[***] | [***] | [***] | [***] | ||||
1501-1600
|
[***] | [***] | [***] | [***] |
BSC System | ||||||||
FOB SHENZHEN | Clearance in [***] | Arrive in warehouse | Arrive in Owner’s site | |||||
QTY
|
By Sea | |||||||
<4
|
[***] | [***] | [***] | [***] |
MSC | ||||||||
FOB SHENZHEN | Clearance in [***] | Arrive in warehouse | Arrive in Owner’s site | |||||
QTY
|
By Sea | |||||||
<3
|
[***] | [***] | [***] | [***] |
MGW | ||||||||
FOB SHENZHEN | Clearance in [***] | Arrive in warehouse | Arrive in Owner’s site | |||||
QTY
|
By Sea | |||||||
<3
|
[***] | [***] | [***] | [***] |
M2000 | ||||||||
FOB SHENZHEN | Clearance in [***] | Arrive in warehouse | Arrive in Owner’s site | |||||
QTY
|
By Sea | |||||||
<3
|
[***] | [***] | [***] | [***] |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
*** | Certain information on this page has been omitted and filed separately with the Commission. |
Customer: | ||||||
Service Provided:
|
MTA: | |||||
Project Number:
|
Date Completed: | |||||
Description Of Services Provided: | ||||
Customer Coments:
|
||||
Huawei Signature
|
Date | Customer Signature | Date | |||||
Huawei Printed Name
|
Customer Printed Name |
CSOFTX3000 | ||||||||
ATP Section | PASS | FAIL | N/A | COMMENTS | ||||
T01 |
||||||||
T02 T03 |
||||||||
T04 |
||||||||
T05 |
||||||||
T06 |
||||||||
T07 |
||||||||
T08 |
||||||||
T09 |
||||||||
T10 |
||||||||
T11 |
||||||||
T12 |
||||||||
T13 |
||||||||
T14 |
||||||||
T15 |
||||||||
T16 |
UMG8900 | ||||||||
ATP Section | PASS | FAIL | N/A | COMMENTS | ||||
T01 |
||||||||
T02 |
||||||||
T03 |
||||||||
T04 |
||||||||
T05 |
||||||||
T06 |
||||||||
T07 |
||||||||
T08 |
||||||||
T09 |
||||||||
T10 |
||||||||
T11 |
||||||||
T12 |
||||||||
T13 |
X0000 | ||||||||
XXX Xxxxxxx | XXXX | FAIL | N/A | COMMENTS | ||||
T01 |
||||||||
T02 |
||||||||
T03 |
||||||||
T04 |
||||||||
T05 |
||||||||
T06 |
||||||||
T07 |
BSC | ||||||||
ATP Section | PASS | FAIL | N/A | COMMENTS | ||||
T01 |
||||||||
T02 |
||||||||
T03 |
||||||||
T04 |
||||||||
T05 |
||||||||
T06 |
||||||||
T07 |
||||||||
T08 |
||||||||
T09 |
||||||||
T10 |
BTS | ||||||||
ATP Section | PASS | FAIL | N/A | COMMENTS | ||||
T01 |
||||||||
T02 |
||||||||
T03 |
||||||||
T04 |
||||||||
T05 |
||||||||
T06 |
||||||||
T07 |
SUMMARY | ||||||||||
ATP Section | PASS | FAIL | N/A | TOTALS | Percentage | |||||
CSOFTX3000 |
||||||||||
UMG8900 |
||||||||||
M2000 |
||||||||||
BSC |
||||||||||
BTS |
||||||||||
TOTALS |
Huawei Software Load and Patch | ||||||||||||||||||||||||
CONDITION: | Comments (Records all | Verification Sign Off | ||||||||||||||||||||||
TEST CASE | Yes-No-N/A | information) | DATE | HUAWEI | CUSTOMER | CSR # | ||||||||||||||||||
Software Load and Patch Verification |
||||||||||||||||||||||||
Start of project CSOFTX3000 load & patch
verification |
||||||||||||||||||||||||
End of project CSOFTX3000 load & patch
verification |
||||||||||||||||||||||||
Start of project UMG8900 load & patch
verification |
||||||||||||||||||||||||
End of project UMG8900 load & patch
verification |
||||||||||||||||||||||||
Start of project BSC load & patch verification |
||||||||||||||||||||||||
End of project BSC load & patch verification |
||||||||||||||||||||||||
Start of project M2000 load verification |
||||||||||||||||||||||||
End of project M2000 load verification |
||||||||||||||||||||||||
Start of project BTS3606AE load & patch
verification |
||||||||||||||||||||||||
End of project BTS3606AE load & patch
verification |
TEST CASE | CDMA CSOFTX3000 Acceptance Test Plan | Condition: | TEST CASE Sign Off | |||||||||
NUMBER | TEST CASE | Pass-Fail-N/A | Comments | DATE | Huawei | CUSTOMER | ||||||
T01
|
Hardware Test | |||||||||||
T01-01
|
Hardware | |||||||||||
T01-0101
|
Cabinet | |||||||||||
T01-0102
|
Cable | |||||||||||
T01-0103
|
BAM Server | |||||||||||
T01-0104
|
iGWB Server | |||||||||||
T01-0105
|
Disk Array (iGWB Server) | |||||||||||
T01-0106
|
Emergency Workstation | |||||||||||
T02
|
PowerON Test | |||||||||||
T02-01
|
PowerOn Test | |||||||||||
T02-0101
|
Operational Environment | |||||||||||
T02-0102
|
Indicator on Board | |||||||||||
X00-0000
|
Xxx Xxx | |||||||||||
X00-0000
|
BAM | |||||||||||
T02-0105
|
iGWB | |||||||||||
T02-0106
|
Emergency Worksation | |||||||||||
T02-0107
|
Workstation | |||||||||||
T02-0108
|
Board | |||||||||||
T03
|
Mobility Management | |||||||||||
T03-01
|
Location Registration | |||||||||||
T03-0101
|
Power-On Registration | |||||||||||
T03-0102
|
Registration of Illegal Subscriber | |||||||||||
T03-0103
|
Power-Off | |||||||||||
T03-0104
|
Periodic Location Registration | |||||||||||
T03-0105
|
MSCe/VLR stores subscriber data from the HLR | |||||||||||
T03-0106
|
VLR Subscriber Data Deletion | |||||||||||
T03-0107
|
MS de-activation initiated by a service VLR | |||||||||||
T03-0108
|
Implicit Registration | |||||||||||
T04
|
Basic Voice Service Test | |||||||||||
X00-00
|
Xxxxx-Xxxxxx Xxxxx | |||||||||||
X00-0000
|
Intra-Office Call (Called Subscriber Idle) | |||||||||||
T04-0102
|
Intra-Office Call (Called Subscriber Busy) | |||||||||||
T04-0103
|
Intra-Office Call (No Answer) | |||||||||||
T04-0104
|
Intra-Office Call (Paging No Response) | |||||||||||
T04-0105
|
Intra-Office Call (Number Unallocated) | |||||||||||
T04-02
|
CDMA-PSTN Calls | |||||||||||
T04-0201
|
CDMA-PSTN Call (Called Subscriber Idle) | |||||||||||
T04-0202
|
CDMA-PSTN Call (Called Subscriber Busy) | |||||||||||
T04-0203
|
CDMA-PSTN Call (No Answer) | |||||||||||
T04-0204
|
CDMA-PSTN Call (Number Unallocated) | |||||||||||
T04-0205
|
M to L — Only Calling Party Hangs Up | |||||||||||
T04-0206
|
M to L — Only Called Party Hangs Up | |||||||||||
T04-03
|
PSTN-CDMA Calls | |||||||||||
T04-0301
|
PSTN-CDMA Call (Called Subscriber Idle) | |||||||||||
T04-0302
|
PSTN-CDMA Call (Called Subscriber Busy) | |||||||||||
T04-0303
|
PSTN-CDMA Call (No Answer) | |||||||||||
T04-0304
|
PSTN-CDMA Call (Paging No Response) | |||||||||||
T04-0305
|
L to M — Normal Call Completion (with VM) | |||||||||||
T04-0306
|
L to M — Only Calling Party Hangs Up | |||||||||||
T04-0307
|
L to M — Only Called Party Hangs Up | |||||||||||
T04-04
|
E911 Service | |||||||||||
T04-0401
|
E911 Phase I | |||||||||||
T04-0402
|
Mobile subscriber A calls 911, it is a E911 call in the local number analysis table, The call is normal and stable, and the voice is clear. | |||||||||||
T04-0403
|
PPC subscriber A calls 911, it will not trigger the intelligent service. The E911call is normal and stable. | |||||||||||
T04-0404
|
Mobile subscriber A calls 911, it fails to select route to the S/R and analysis the EEFN number success. the E911 call is established. |
TEST CASE | CDMA CSOFTX3000 Acceptance Test Plan | Condition: | TEST CASE Sign Off | |||||||||
NUMBER | TEST CASE | Pass-Fail-N/A | Comments | DATE | Huawei | CUSTOMER | ||||||
T04-0405
|
E911 Phase II | |||||||||||
T04-0406
|
The postpaid user initiate a E911 call | |||||||||||
T04-0407
|
The PPC user initiate a E911 call | |||||||||||
T04-0408
|
E911 Egress Failure Number (The trunk circuit between the MSC and the S/R are fault) | |||||||||||
T04-0409
|
Call origination to 000 (xx XXX, XXX mismatch, hotlined phone, phone with no programming, MIN and MDN are the same and different) | |||||||||||
T04-05
|
Tones | |||||||||||
T04-0501
|
Playing Busy Tone | |||||||||||
T04-0502
|
Playing Incorrect Number | |||||||||||
T04-0503
|
Playing Vacant Tone | |||||||||||
T04-0504
|
Playing Out-Of-Service Signal Tone | |||||||||||
T04-0505
|
Ring back to mobile from MSC | |||||||||||
T04-0506
|
Call waiting to mobile from MSC | |||||||||||
T04-0507
|
Busy to mobile from MSC | |||||||||||
T04-0508
|
Busy to mobile from PSTN | |||||||||||
T04-06
|
IS2000 Voice Call Processing | |||||||||||
T04-0601
|
M(Cricket) to M(Cricket) — Normal Call Completion (with VM) | |||||||||||
T04-0602
|
M(Cricket) to M(Cricket) — Only Calling Party Hangs Up | |||||||||||
T04-0603
|
M(Cricket) to M(Cricket) — Only Called Party Hangs Up | |||||||||||
T04-0604
|
M(Cricket) to M(Cricket roam) — Normal Call Completion (without VM) | |||||||||||
T04-0605
|
M(Cricket) to M(Cricket roam) — Normal Call Completion (with VM) | |||||||||||
T04-0606
|
M(Cricket) to M(Cricket roam) — Called Party Busy | |||||||||||
T04-0607
|
M(Cricket) to M(Cricket roam) — Only Calling Party Hangs Up | |||||||||||
T04-0608
|
M(Cricket) to M(Cricket roam) — Only Called Party Hangs Up | |||||||||||
T04-0609
|
M(Cricket) to M(Cricket roam) calling number ID presentation | |||||||||||
T04-0610
|
M(Cricket roam) to M(Cricket) — Normal Call Completion (without VM) | |||||||||||
T04-0611
|
M(Cricket roam) to M(Cricket) — Normal Call Completion (with VM) | |||||||||||
T04-0612
|
M(Cricket roam) to M(Cricket) — Called Party Busy | |||||||||||
T04-0613
|
M(Cricket roam) to M(Cricket) — Only Calling Party Hangs Up | |||||||||||
T04-0614
|
M(Cricket roam) to M(Cricket) — Only Called Party Hangs Up | |||||||||||
T04-0615
|
M(Cricket roam) to M(Cricket) calling number ID presentation | |||||||||||
T04-0616
|
Calling number not presented with one time feature | |||||||||||
T04-0617
|
LD fails when set to local calls only | |||||||||||
T04-0618
|
International LD call | |||||||||||
T04-0619
|
DA using 11 digit dialing | |||||||||||
T04-0620
|
ESN change updates VLR | |||||||||||
T04-0621
|
No origination possible with ESN mismatch | |||||||||||
T04-0622
|
Call origination to operator | |||||||||||
T04-0623
|
M to LD | |||||||||||
T04-0624
|
LD to M | |||||||||||
T04-0625
|
Call origination fails when hotlined | |||||||||||
T04-0626
|
Call origination to prepaid (*LD or *PAY) | |||||||||||
T04-07
|
IS95 Voice Call Processing (Backward Compatibility) | |||||||||||
T04-0701
|
M to L — Normal Call Completion | |||||||||||
T04-0702
|
M to L — Called Party Busy | |||||||||||
T04-0703
|
M to L — Only Calling Party Hangs Up | |||||||||||
T04-0704
|
M to L — Only Called Party Hangs Up | |||||||||||
T04-0705
|
L to M — Normal Call Completion | |||||||||||
T04-0706
|
L to M — Called Party Busy | |||||||||||
T04-0707
|
L to M — Only Calling Party Hangs Up | |||||||||||
T04-0708
|
L to M — Only Called Party Hangs Up | |||||||||||
T04-0709
|
M to M — Normal Call Completion | |||||||||||
T04-0710
|
M to M — Called Party Busy | |||||||||||
T04-0711
|
M to M — Only Calling Party Hangs Up | |||||||||||
T04-0712
|
M to M — Only Called Party Hangs Up | |||||||||||
T05
|
SMS Test | |||||||||||
T05-0101
|
SMS Origination and Xxxxxxxxxxx (XX Xxxx) | |||||||||||
X00-0000
|
SMS Origination and Termination (MS in conversation) | |||||||||||
T05-0103
|
Short Message Services (SMS) MS — Termination (active, busy and inactive (inactive should fail) MIN and MDN are the same and different) |
TEST CASE | CDMA CSOFTX3000 Acceptance Test Plan | Condition: | TEST CASE Sign Off | |||||||||
NUMBER | TEST CASE | Pass-Fail-N/A | Comments | DATE | Huawei | CUSTOMER | ||||||
T05-0104
|
Short Message Services (SMS) MS — Origination | |||||||||||
T05-0105
|
IS-95/IS-2000 Inter-Generation Short Message Service (SMS) MS — Origination | |||||||||||
T05-0106
|
IS-95/IS-2000 Inter-Generation Short Message Service (SMS) MS — Termination | |||||||||||
T05-0107
|
SMS to other wireless cxr (non Cricket) | |||||||||||
T05-0108
|
Non Cricket SMS to Cricket (MIN and MDN are the same and different) | |||||||||||
T05-0109
|
Maximum SMS characters over paging channel | |||||||||||
T05-0110
|
Maximum SMS characters over traffic channel | |||||||||||
T06
|
Data Service Test | |||||||||||
T06-0101
|
PDSN Subscriber Registration | |||||||||||
T06-0102
|
Mobile-Originated PDSN Released to Xxxx Xxxxx | |||||||||||
X00-0000
|
Xxxxxx-Xxxxxxxxxx PDSN Release to Xxxxxxx Xxxxx | |||||||||||
X00-0000
|
XXXX Service Activated from Domant State | |||||||||||
T07
|
Supplementary Service Test | |||||||||||
T07-01
|
Call Forwarding-Unconditional | |||||||||||
T07-0101
|
Registration, Deregistration, Activation, and Deactivation | |||||||||||
T07-0102
|
CFU to Idle Mobile Suscriber | |||||||||||
T07-02
|
Call Forwarding-Busy | |||||||||||
T07-0201
|
Registration, Deregistration, Activation, and Deactivation | |||||||||||
T07-0202
|
CFB to VM | |||||||||||
T07-03
|
Call Forwarding-No Answer | |||||||||||
T07-0301
|
Registration, Deregistration, Activation, and Deactivation | |||||||||||
T07-0302
|
CFNA to VM | |||||||||||
T07-04
|
Call Forwarding-Default | |||||||||||
T07-0401
|
Registration, Deregistration, Activation, and Deactivation | |||||||||||
T07-0402
|
CFD to VM | |||||||||||
T07-05
|
Calling Number Identification Presentation | |||||||||||
T07-0501
|
Mobile Subscriber as Calling Party | |||||||||||
T07-0502
|
PSTN Subscriber as Calling Party | |||||||||||
T07-06
|
Calling Number Identification Restriction | |||||||||||
T07-0601
|
Calling Number Identification Restriction | |||||||||||
T07-07
|
Call Waiting |
TEST CASE | UMG8900 Acceptance Test Plan | Condition: | TEST CASE Sign Off | |||||||||||
NUMBER | TEST CASE | Pass-Fail-N/A | Comments | DATE | Huawei | CUSTOMER | ||||||||
T01
|
Hardware | |||||||||||||
T01-01
|
Cabinet | |||||||||||||
T01-02
|
Cabling | |||||||||||||
T01-03
|
Auxiliary Equipment | |||||||||||||
T02
|
Power On | |||||||||||||
T02-01
|
Running Environment | |||||||||||||
T02-02
|
Fan Box | |||||||||||||
T02-03
|
Local Maintenance Terminal | |||||||||||||
T02-04
|
Board Loading | |||||||||||||
T03
|
Availability | |||||||||||||
T03-01
|
Display and Query of the Board Status | |||||||||||||
T03-02
|
Availability of the E1/T1 Port | |||||||||||||
T03-03
|
Availability of the E3/T3 Port | |||||||||||||
T03-04
|
Availability of the Maintenance Network Port | |||||||||||||
T04
|
H.248 Interface Function | |||||||||||||
T04-01
|
H.248 over SCTP | |||||||||||||
T04-02
|
Binary Coding Mode of H.248 | |||||||||||||
T04-03
|
Registration Function | |||||||||||||
T04-04
|
MGW Out-of-Service Report | |||||||||||||
T04-05
|
Tracing and Resolution of H.248 Messages | |||||||||||||
T05
|
Office Management | |||||||||||||
T05-01
|
Office Management | |||||||||||||
T06
|
Alarm Management | |||||||||||||
T06-01
|
Query of Active Alarms | |||||||||||||
T06-02
|
Query of Alarm Logs | |||||||||||||
T06-03
|
Alarm Clearing | |||||||||||||
T07
|
Security Management | |||||||||||||
T07-01
|
Subscriber Management | |||||||||||||
T07-02
|
Interface Lock | |||||||||||||
T07-03
|
File Dump | |||||||||||||
T07-04
|
Online User Management | |||||||||||||
T07-05
|
C01.01 | Access using authorized user | ||||||||||||
T07-06
|
C01.02 | Access using unauthorized user | ||||||||||||
T07-07
|
C01.03 | Configure the firewall by accessing the Access Control Lists (ACL) |
||||||||||||
T08
|
Log Management | |||||||||||||
T08-01
|
Query of Operation Logs | |||||||||||||
T08-02
|
Query of Running Logs | |||||||||||||
T08-03
|
Query of Call Logs | |||||||||||||
T08-04
|
Query of Security Logs | |||||||||||||
T09
|
Performance Management | |||||||||||||
T09-01
|
Creation of Performance Measurement Tasks | |||||||||||||
T09-02
|
Query of Performance Measurement Results | |||||||||||||
T09-03
|
Modification of Measurement Objects | |||||||||||||
T09-04
|
Modification of Performance Measurement Thresholds | |||||||||||||
T10
|
Trace Management | |||||||||||||
T10-01
|
Creation of Trace Tasks | |||||||||||||
T10-02
|
Query of Detail About Trace Messages | |||||||||||||
T10-03
|
Dump of Trace Messages | |||||||||||||
T10-04
|
Trace Review | |||||||||||||
T10-05
|
C01.04 | Show interface tracing of Mc (UMG8900 to MSCe) |
TEST CASE | M2000 Acceptance Test Plan | Condition: Pass- | TEST CASE Sign Off | |||||||||||
NUMBER | TEST CASE | Fail-N/A | Comments | DATE | Huawei | CUSTOMER | CSR # | |||||||
T01
|
Fault Management | |||||||||||||
T01-0101
|
Fault Alarm Information Storage | |||||||||||||
T01-0102
|
Event Alarm Information Storage | |||||||||||||
T01-0103
|
Fault Recovery Alarm Information Storage | |||||||||||||
T01-0201
|
Automatic Alarm Displacement | |||||||||||||
T01-0202
|
Manual Alarm Displacement | |||||||||||||
T01-0301
|
Fault Alarm Query | |||||||||||||
T01-0302
|
Event Alarm Query | |||||||||||||
T01-0303
|
History Fault Alarm Query | |||||||||||||
T01-0401
|
Alarm Automatic Synchronization | |||||||||||||
T01-0402
|
Alarm Manual Synchronization | |||||||||||||
T01-0501
|
Alarm Automatic Acknowledge | |||||||||||||
T01-0502
|
Alarm Manual Acknowledge | |||||||||||||
T01-0601
|
Alarm Unacknowledge | |||||||||||||
T01-0701
|
Alarm Automatic Clear | |||||||||||||
T01-0702
|
Alarm Manual Clear | |||||||||||||
T01-0801
|
Real Time Fault Alarm Browsing | |||||||||||||
T01-0802
|
Real Time Event Alarm Browsing | |||||||||||||
T01-0901
|
Alarm Level Redefinition | |||||||||||||
T01-0902
|
Modification of Alarm Level Redefinition | |||||||||||||
T01-0903
|
Cancellation of Alarm Level Redefinition | |||||||||||||
T01-1001
|
Alarm shielding | |||||||||||||
T01-1002
|
Modification of Alarm shielding | |||||||||||||
T01-1003
|
Cancellation of Alarm shielding | |||||||||||||
T01-1101
|
Current Alarm Display Filter | |||||||||||||
T01-1102
|
Event Alarm Display Filter | |||||||||||||
T01-1201
|
Alarm Statistics | |||||||||||||
T01-1202
|
Real Time Alarm Statistics | |||||||||||||
T01-1301
|
Query and Modification of Alarm Knowledge Base | |||||||||||||
T01-1302
|
Export/Import Alarm Knowledge Base | |||||||||||||
T01-1401
|
Alarm Notification through Alarm Client | |||||||||||||
T01-1402
|
Alarm Notification through Topological Interface | |||||||||||||
T01-1403
|
Alarm Notification through Alarm Box | |||||||||||||
T01-1501
|
M2000 Fault Detection, Alarm Collection and Alarm Recovery | |||||||||||||
T01-1601
|
Display Alarm through the Topological Nodes | |||||||||||||
T01-1602
|
Query Alarm through the Topological Nodes | |||||||||||||
T01-1701
|
Long Period Uncleared Alarm Detection and Alert | |||||||||||||
T02
|
Configuration Management | |||||||||||||
T02-0101
|
Configuration Data Manual Synchronization | |||||||||||||
T02-0201
|
Querying Configuration Data | |||||||||||||
T02-0301
|
Deleting NEs in Batch | |||||||||||||
T03
|
Performance Management | |||||||||||||
T03-0101
|
Importing/Exporting Measure Instance | |||||||||||||
T03-0102
|
Starting/Ending Measuring | |||||||||||||
T03-0201
|
Performance Feature Measure counters | |||||||||||||
T03-0301
|
Querying Real-Time Measure Result | |||||||||||||
T03-0302
|
Executing Real-Time Measuring | |||||||||||||
T03-0303
|
Refreshing Measure status of counter or Object | |||||||||||||
T03-0401
|
Suspending and Activating Measuring | |||||||||||||
T03-0501
|
Exporting Performance Result | |||||||||||||
T03-0601
|
Querying, Displaying and Printing Performance Result | |||||||||||||
T03-0701
|
Subscribing Performance Result | |||||||||||||
T03-0801
|
User Defined Counter Management | |||||||||||||
T03-0901
|
Querying Template Management | |||||||||||||
T03-1001
|
Setting Threshold | |||||||||||||
T03-1002
|
Modifying Threshold Setting | |||||||||||||
T03-1003
|
Deleting Threshold Setting | |||||||||||||
T03-1004
|
Suspending and Activating Threshold Setting |
TEST CASE | M2000 Acceptance Test Plan | Condition: Pass- | TEST CASE Sign Off | |||||||||||
NUMBER | TEST CASE | Fail-N/A | Comments | DATE | Huawei | CUSTOMER | CSR # | |||||||
T04
|
System Management | |||||||||||||
T04-0101
|
Online Help | |||||||||||||
T04-0201
|
Online Monitoring System | |||||||||||||
T05
|
Security | |||||||||||||
T05-0101
|
Adding a User | |||||||||||||
T05-0102
|
Deleting a User | |||||||||||||
T05-0103
|
Viewing User Information | |||||||||||||
T05-0104
|
Modifying User Information | |||||||||||||
T05-0105
|
Binding a User to Multiple User Groups | |||||||||||||
T05-0106
|
Authorizing Binding Group | |||||||||||||
T05-0201
|
Browsing and Querying Alarm Filter | |||||||||||||
T05-0202
|
Browsing and Querying Feature Filter | |||||||||||||
T05-0301
|
System Auto Locking | |||||||||||||
T05-0401
|
Wrong Password Login | |||||||||||||
T05-0402
|
Unauthorized Creating Subnet Failure | |||||||||||||
T05-0501
|
Querying Log | |||||||||||||
T05-0601
|
Printing Log Query Result | |||||||||||||
T05-0602
|
Saving Log Query Result | |||||||||||||
T05-0701
|
Manual Displacing Log | |||||||||||||
T05-0702
|
Auto Displacing Log | |||||||||||||
T05-0801
|
User Operation Monitoring | |||||||||||||
X00-0000
|
Xxxxxxxxxx User Conversation and User Kicking out | |||||||||||||
T06
|
Topology Management | |||||||||||||
T06-0101
|
Create/Delete/Modify Physical Subnet | |||||||||||||
T06-0102
|
Create/Delete/Modify Xxxxxxxx XX | |||||||||||||
X00-0000
|
Xxxxxx/Xxxxxx/Xxxxxx Xxxxxxx XX | |||||||||||||
X00-0000
|
Create/Delete/Modify Virtual Link | |||||||||||||
T06-0201
|
Topology Navigation Tree | |||||||||||||
T06-0301
|
Locating Topology Object by Name | |||||||||||||
T06-0302
|
Locating Topology Object by Property |
TEST CASE | BSC Acceptance Test Plan | Condition: | TEST CASE Sign Off | |||||||||||
NUMBER | TEST CASE | Pass-Fail-N/A | Comments | DATE | Huawei | CUSTOMER | CSR # | |||||||
T01
|
Hardware Installation | |||||||||||||
T01-01
|
Equipment | |||||||||||||
T01-0101
|
Cabinets | |||||||||||||
X00-0000
|
Xxxxxxxxxxx of Cables and Optical Fibers | |||||||||||||
T01-0103
|
Lightning Protection and Grouding | |||||||||||||
T01-0104
|
Power Supply | |||||||||||||
T01-0105
|
Feeder Installation | |||||||||||||
T02
|
Power-on Test | |||||||||||||
T02-01
|
Running Status of Equipment | |||||||||||||
T02-0101
|
Status of Board Indicators | |||||||||||||
T02-0102
|
Running Status of Fan | |||||||||||||
T02-0103
|
BSC Power-on Test | |||||||||||||
T02-0104
|
BTS Power-On Test | |||||||||||||
T03
|
Voice Service Function | |||||||||||||
T03-01
|
MS Access | |||||||||||||
T03-0101
|
Network Capture During MS Switch-On | |||||||||||||
T03-02
|
Voice Call | |||||||||||||
T03-0201
|
MS Call | |||||||||||||
T03-0202
|
Call Release Test | |||||||||||||
T03-0203
|
service negotiation msg 2G handset | |||||||||||||
T03-0204
|
service negotiation msg 3G handset | |||||||||||||
T03-0205
|
TTY/TDD (711 call) | |||||||||||||
T03-03
|
Power Control | |||||||||||||
T03-0301
|
Fast forward power control | |||||||||||||
T03-0302
|
Reverse closed loop power control | |||||||||||||
T03-0303
|
forward link power control overload algorythm | |||||||||||||
T04
|
Operation Functions | |||||||||||||
T04-01
|
Local Terminal System | |||||||||||||
T04-0101
|
User login | |||||||||||||
T04-0102
|
Site Management | |||||||||||||
T04-02
|
System Management | |||||||||||||
T04-0201
|
Command Group Management | |||||||||||||
T04-0202
|
User Management | |||||||||||||
T04-0203
|
Workstation Management | |||||||||||||
T04-0204
|
Command Log Management | |||||||||||||
T04-0205
|
Timing Task Management | |||||||||||||
T04-0206
|
Database Management | |||||||||||||
T04-03
|
Alarm Management | |||||||||||||
T04-0301
|
Performs Critical, Major, Minor, warning alarms, verify alarm detection, alarm generation, alarm query and mask | |||||||||||||
T04-0302
|
Signaling Link Inhibit/Uninhibit | |||||||||||||
T04-0303
|
Alarm History Log | |||||||||||||
T04-04
|
Performance Management | |||||||||||||
T04-0401
|
Traffic Measurements Observing Through iManager M2000 | |||||||||||||
T04-0402
|
Performance Management — query measurement data using various granularity periods | |||||||||||||
T04-0403
|
Performance Data Collection | |||||||||||||
X00-0000
|
Xxxxx Xxxxxx Xxxxx | |||||||||||||
X00-0000
|
Edit BSS Thresholds | |||||||||||||
T04-05
|
Configuration Management | |||||||||||||
T04-0501
|
Dynamic Sector Adding/Removing Function | |||||||||||||
T04-0502
|
Dynamic Board Adding/Removing Function | |||||||||||||
T04-0503
|
Configuration Management — add, delete, modify and query data in the radio layer (system info, cell chan , etc.) |
TEST CASE | BSC Acceptance Test Plan | Condition: | TEST CASE Sign Off | |||||||||||
NUMBER | TEST CASE | Pass-Fail-N/A | Comments | DATE | Huawei | CUSTOMER | CSR # | |||||||
T04-0504
|
Configuration Management — add, delete, modify and query data in the transport layer (system and physical info,etc.) | |||||||||||||
T04-0505
|
For time synchronization, Primary timing source unavailable, secondary source active | |||||||||||||
T04-0506
|
For transmission synchronization, Primary timing source unavailable, secondary source active |
|||||||||||||
T04-0507
|
Control boards faulty, verify reliability configuration | |||||||||||||
T04-0508
|
Power supply faulty, verify reliabilty configuration | |||||||||||||
T04-0509
|
Test the AbortInitialize Action | |||||||||||||
T04-0510
|
RAN Element Management Access | |||||||||||||
T04-0511
|
Add / Edit IS2000BSS Sites and Cells | |||||||||||||
T04-0512
|
ADD / Remove Neighbor | |||||||||||||
T04-0513
|
Show Attributes (BSC / RBS / CDMA Channel) | |||||||||||||
X00-0000
|
Xxxxxxxxxxxxxxx (Check / Up / Down / Report) | |||||||||||||
T04-06
|
Radio Resource Management | |||||||||||||
T04-0601
|
Radio Resource Management | |||||||||||||
T04-07
|
BTS Networking | |||||||||||||
T04-0701
|
BTS Object and Information Management Function | |||||||||||||
T05
|
Maintenance Function | |||||||||||||
T05-01
|
Equipment Maintenance | |||||||||||||
T05-0101
|
Subrack Maintenance | |||||||||||||
T05-0102
|
Board Maintenance | |||||||||||||
T05-0103
|
Show current load of system resources | |||||||||||||
X00-00
|
Xxxxxxxxx Xxxxxxx Xxxxxxxxxxx | |||||||||||||
X00-0000
|
Interface Circuit Maintenance | |||||||||||||
T05-0202
|
T1 Trunk Management | |||||||||||||
T05-03
|
SS7 Maintenance | |||||||||||||
T05-0301
|
Destination Signaling Point Management | |||||||||||||
T05-0302
|
SCCP Subsystem Management | |||||||||||||
T05-0303
|
MTP3 Signaling Link Set Management | |||||||||||||
T05-0304
|
MTP3 Signaling Link Management | |||||||||||||
T05-0305
|
ANSI Configuration | |||||||||||||
T05-04
|
Active-Standby Switchover | |||||||||||||
T05-0401
|
CSPU Active-Standby Switchover | |||||||||||||
X00-0000
|
XXXX Active-Standby Switchover | |||||||||||||
T05-0403
|
CMUX Active-Standby Switchover | |||||||||||||
T05-0404
|
CPCU Active-Standby Switchover | |||||||||||||
T05-0405
|
CHAC Active-Standby Switchover | |||||||||||||
T05-0406
|
CMPU Active-Standby Switchover | |||||||||||||
T05-0407
|
CNET Active-Standby Switchover | |||||||||||||
X00-00
|
Xxxx Xxxxxxxxxxxxxxx | |||||||||||||
X00-0000
|
BSC-BTS Link Troubleshooting | |||||||||||||
T05-0502
|
BSC-MSC Link Troubleshooting | |||||||||||||
T05-06
|
System Test Function | |||||||||||||
T05-0601
|
Subscriber Interface Tracing Test | |||||||||||||
T05-0602
|
System Status Monitoring | |||||||||||||
T06
|
CDMA2000 1X Data Service Function | |||||||||||||
T06-01
|
CDMA2000 1X Packet Data Call | |||||||||||||
T06-0101
|
CDMA2000 1X MS Set up/Release Packet Data Service Call | |||||||||||||
T06-02
|
Radio Resource Allocation of CDMA2000 1X Packet Data Service | |||||||||||||
T06-0201
|
Radio Resource Allocation Among Multiple CDMA2000 1X Packet Data Subscribers | |||||||||||||
T06-03
|
CDMA2000 1X SCH |
TEST CASE | BSC Acceptance Test Plan | Condition: | TEST CASE Sign Off | |||||||||||
NUMBER | TEST CASE | Pass-Fail-N/A | Comments | DATE | Huawei | CUSTOMER | CSR # | |||||||
T06-0301
|
CDMA2000 1X SCH Dynamic Allocation | |||||||||||||
T06-04
|
CDMA2000 1X Packet Data Call Status Change | |||||||||||||
T06-0401
|
CDMA2000 1X Packet Data Service Changes from Active State to Dormant State (Network Initiated) | |||||||||||||
T06-0402
|
CDMA2000 1X Packet Data Service Changes from Active State to Dormant State (MS Initiated) | |||||||||||||
T06-0403
|
CDMA2000 1X Packet Data Service Changes from Dormant State to Active State (Network Initiated) | |||||||||||||
T06-0404
|
CDMA2000 1X Packet Data Service Changes from Dormant State to Active State (MS Initiated) | |||||||||||||
T06-0405
|
CDMA2000 1X Packet Data Service Changes from Dormant State to Null State (MS Initiated) | |||||||||||||
T06-0406
|
Speech Call with CDMA2000 1X Packet Data Service in Xxxxxxx Xxxxx | |||||||||||||
X00-00
|
XXXX0000 0X Xxxxxx Data Service Application | |||||||||||||
T06-0501
|
Web Browse | |||||||||||||
X00-0000
|
XXX File Transmission (Downlink) | |||||||||||||
T06-0503
|
FTP File Transmission (Uplink) | |||||||||||||
T07
|
Switch Subsystem | |||||||||||||
T07-01
|
Switch Subsystem Management | |||||||||||||
T07-0101
|
Switch Subsystem Configuration | |||||||||||||
T07-0102
|
Switch Subsystem Maintenance | |||||||||||||
T08
|
Handoff | |||||||||||||
T08-0101
|
Perform Intra-BSC Hard Handoff (different freq.) | |||||||||||||
T08-0102
|
Two and Three-way Soft Handoff (Voice) | |||||||||||||
T08-0103
|
Three-way Softer-Soft Handoff | |||||||||||||
T08-0104
|
Intra BSC Channel Assignment Soft Handoff | |||||||||||||
T08-0105
|
inter frequency idle handoff | |||||||||||||
T08-0106
|
3G multi cxr hard handoff | |||||||||||||
T08-0107
|
2G multi cxr hard handoff | |||||||||||||
T08-0108
|
HHO using rtd | |||||||||||||
T08-0109
|
Call redirection at mobile origination/termination due to blocking | |||||||||||||
T08-0110
|
1X/1X softer handoff during active packet data call | |||||||||||||
T08-0111
|
2G Two and Three-way Soft Handoff (Voice) | |||||||||||||
T08-0112
|
soft handoff combined neighbor list message | |||||||||||||
T08-0113
|
Intra BSC Hard Handoff | |||||||||||||
T08-0114
|
Intra BSC Access Hand Off | |||||||||||||
T08-0115
|
Intra and Inter BSC Channel Assignment Soft Handoff | |||||||||||||
T08-0116
|
multi cxr frequency assignment | |||||||||||||
T08-0117
|
1X/1X intra BSC soft handoff during active packet data call | |||||||||||||
T08-0118
|
Intra BSS hard handoff into soft handoff | |||||||||||||
T08-0119
|
Access entry handoff | |||||||||||||
T08-0120
|
Access handoff | |||||||||||||
T09
|
Miscellous | |||||||||||||
T09-0101
|
RC4 assignment | |||||||||||||
T09-0102
|
RC4 blocked assignment | |||||||||||||
T09-0103
|
Implement extension boundary paging in BSC | |||||||||||||
T09-0104
|
service negotiation msg 2G handset | |||||||||||||
T09-0105
|
service negotiation msg 3G handset | |||||||||||||
T09-0106
|
Fast forward power control | |||||||||||||
T09-0107
|
Reverse closed loop power control | |||||||||||||
T09-0108
|
forward link power control overload algorythm | |||||||||||||
T09-0109
|
multi cxr site load balancing |
TEST CASE | BSC Acceptance Test Plan | Condition: | TEST CASE Sign Off | |||||||||||
NUMBER | TEST CASE | Pass-Fail-N/A | Comments | DATE | Huawei | CUSTOMER | CSR # | |||||||
T10
|
CDMA2000 1x EV-DO High Rate Packet Data (HRPD) Service | |||||||||||||
T10-01
|
CDMA2000 1x EV-DO Service Maintenance |
TEST CASE | BTS 3606A Acceptance Test Plan | Condition: | TEST CASE Sign Off | |||||||||||
NUMBER | TEST CASE | Pass-Fail-N/A | Comments | DATE | Huawei | CUSTOMER | CSR # | |||||||
T01
|
T01 Hardware Installation Inspection | |||||||||||||
T01-01
|
Cabinets (BTS3606AE) | |||||||||||||
T01-03
|
Layout of Cables and Fibers | |||||||||||||
T01-04
|
Lightning Protection and Grounding | |||||||||||||
T01-05
|
Connection of Power Cables | |||||||||||||
T01-06
|
Storage Battery or Battery Cabinet | |||||||||||||
T01-07
|
Antennas and Feeders | |||||||||||||
T01-08
|
Environment Monitoring Devices (BTS3606AE) | |||||||||||||
T02
|
Power-up Test | |||||||||||||
T02-01
|
Power Supply Unit (PSU) | |||||||||||||
T02-02
|
Storage Batteries | |||||||||||||
T02-03
|
Integrated Devices | |||||||||||||
T03
|
Radio Frequency (RF) Test (BTS3606AE) | |||||||||||||
T03-01
|
CMTR Transmit Power Test | |||||||||||||
T04
|
Service and Function Test | |||||||||||||
T04-01
|
MS Access Network after Switch-on | |||||||||||||
T04-02
|
MS Call Test | |||||||||||||
T04-03
|
MS Call Release | |||||||||||||
T04-04
|
Sector Call Test | |||||||||||||
T04-05
|
Soft/Softer Handoff | |||||||||||||
T05
|
O&M Function Test | |||||||||||||
T05-01
|
Connection and Maintenance of Telnet Maintenance Console | |||||||||||||
T05-02
|
Connection and Configuration of OMC | |||||||||||||
T05-03
|
Software Downloading and Activation | |||||||||||||
X00-00
|
Xxxxxx Xxxxxxx Xxxxxxxx | |||||||||||||
X00-00
|
Xxxxxx Xxxxxxx Unblocking | |||||||||||||
T05-06
|
Physical Resource Blocking | |||||||||||||
T05-07
|
Physical Resource Unblocking | |||||||||||||
T05-08
|
Software and Hardware Reset of Boards | |||||||||||||
T05-09
|
Board Status Query | |||||||||||||
T05-10
|
Alarm Reporting and Query | |||||||||||||
T05-11
|
Board Loopback Test | |||||||||||||
T05-12
|
Initiating Active-Standby Switchover | |||||||||||||
T05-13
|
Initiating Active-Standby Switchover due to the Active Board Failure | |||||||||||||
T05-14
|
Version Information Query | |||||||||||||
T05-15
|
Resource Tracing | |||||||||||||
T05-16
|
Power Supply Monitoring | |||||||||||||
T05-17
|
BTS Recovery Tool Selective Recovery | |||||||||||||
T05-18
|
BTS Recovery Tool Full Recovery | |||||||||||||
T05-19
|
BTS Software Loading Function | |||||||||||||
T05-20
|
BTS Parameter Configuration | |||||||||||||
T05-21
|
Equipment Management | |||||||||||||
T05-22
|
Test Management Function | |||||||||||||
T05-23
|
BTS Tracing and Management | |||||||||||||
T06
|
Trunk Recovery and Power Failure Recovery | |||||||||||||
T06-01
|
Trunk Recovery | |||||||||||||
T06-02
|
Power Failure Recovery | |||||||||||||
T06-03
|
BTS Clock Synchronization Loss Recovery | |||||||||||||
T07
|
Outdoor BTS Monitoring Software System Test (BTS3606AE) |
Market Provisioning Test Plan | ||||||||
Status | Phone Number | ESN | Rate Plan | |||||
Phone 1
|
Active | A30 | ||||||
Phone 2
|
Active | A30 | ||||||
Phone 3
|
Active | A30 | ||||||
Phone 4
|
Active | A30 |
DAY 1 | ||||||||||
Outcome | ||||||||||
Test # | Owner | Scenario | Success | Failure | Comment | |||||
1
|
IT Launch | Phones activated in 054 | ||||||||
2
|
SOM | Program ALL phones, OTA *228 | ||||||||
3
|
SOM | Label all phones 1, 2, 3, & 4 | ||||||||
4
|
SOM | Verify the you are able to make mobile to mobile phone calls. | ||||||||
5
|
SOM | P2 call P1 verify no features, P1 call P3 verify no features, P3 call P2 verify no features |
||||||||
6
|
SOM | Change P3 to A40. P3 call 000.000.0000, verify not rated through Voicecue | ||||||||
7
|
SOM | P3 call Int/L Canada 000-000-0000, verify insufficient funds msg | ||||||||
8
|
SOM | P3 call Int/L Mexico 000-00-00-0000-0000, verify insufficient funds msg |
||||||||
9
|
SOM | P1 call Alaska 000-000-0000, verify insufficient funds msg | ||||||||
10
|
IT Launch | P2 changed to C45 w/ F6 add ZMM, P1 changed to C35 add F5B | ||||||||
11
|
SOM | P3 call P2, verify Call ID, P1 call P2 verify Call ID, Call Wt, VM indicator/retrieval |
||||||||
12
|
SOM | P2 send txt msg to P1, verify it went through | ||||||||
13
|
SOM | P2 call P1 verify Call ID, P3 call P1 verify Call ID, Call Wt, VM indicator/retrieval |
||||||||
14
|
SOM | P2 call 000.000.0000, verify not rated through Voicecue | ||||||||
15
|
SOM | P2 call Int/L Canada 000-000-0000, verify insufficient funds msg | ||||||||
16
|
SOM | P2 call Int/L Mexico 000-00-00-0000-0000, verify insufficient funds msg |
||||||||
17
|
SOM | P2 call Alaska 000-000-0000, verify insufficient funds msg | ||||||||
18
|
IT Launch | Add CIB to P3 | ||||||||
19
|
SOM | P3 call P2, verify Call ID blocking | ||||||||
20
|
IT Launch | Remove CIB from P3, Add HOT to P3 | ||||||||
21
|
SOM | P2 call P3, verify Hotline status | ||||||||
22
|
IT Launch | Remove HOT from P3, add TMS to P3 | ||||||||
23
|
SOM | P3 send txt msg to P2, verify it went through | ||||||||
24
|
IT Launch | Add MC5 to P2, verify deducts $5.00 |
Market Provisioning Test Plan | ||||||||
Status | Phone Number | ESN | Rate Plan | |||||
Phone 1
|
Active | A30 | ||||||
Phone 2
|
Active | A30 | ||||||
Phone 3
|
Active | A30 | ||||||
Phone 4
|
Active | A30 |
DAY 1 | ||||||||||
Outcome | ||||||||||
Test # | Owner | Scenario | Success | Failure | Comment | |||||
25
|
IT Launch | Remove TMS from P3, Add BRW to P3 and $5 to Any Use Bucket | ||||||||
26
|
SOM | P3 download ringtone | ||||||||
27
|
IT Launch | Verify downloaded rated at $2.99/ringtone | ||||||||
28
|
IT Launch | Remove BRW from P3, Add MMS to P3 | ||||||||
29
|
SOM | P3 send picture msg to P2, verify pic msg sent/received | ||||||||
30
|
SOM | P2 send picture msg to P3, verify pic msg sent/received | ||||||||
31
|
IT Launch | Remove MMS from P3, Add MMR to P3 | ||||||||
32
|
SOM | P2 send picture msg to P3, verify pic msg sent/received | ||||||||
33
|
SOM | P3 send picture msg to P2, verify pic msg not sent | ||||||||
34
|
IT Launch | Add VAC to P1 | ||||||||
35
|
SOM | P2 call P1, verify call does not go through | ||||||||
36
|
IT Launch | Remove VAC from P1, Add CIB to P1 | ||||||||
37
|
SOM | P1 call P3, verify Call ID Blocking | ||||||||
38
|
IT Launch | Remove CIB from P1, Add HOT to P1 | ||||||||
39
|
SOM | P3 call P1, verify hotline status | ||||||||
40
|
IT Launch | Add BRW to P2 and $7 to Any Use bucket | ||||||||
41
|
SOM | P2 download game | ||||||||
42
|
IT Launch | Verify downloaded rated at $5.99/ringtone | ||||||||
43
|
IT Launch | Add DAT to P4 | ||||||||
44
|
SOM | P4 browse WEB Portal, verify cannot select category | ||||||||
45
|
IT Launch | Remove DAT from P4, Add WAP to P4 | ||||||||
46
|
SOM | P4 utilize WEB Portal | ||||||||
47
|
IT Launch | Remove WAP from P4, Add UDA to P4 | ||||||||
48
|
SOM | P4 call 411 | ||||||||
49
|
IT Launch | Verify OI 23, and DA not rated through VC | ||||||||
50
|
IT Launch | Remove UDA from P4, verify OI returns to 6 | ||||||||
51
|
SOM | Test VOIP number (VOIP NUMBER 1/VOIP NUMBER 2), 611 | ||||||||
52
|
IT Xxxxxx | Xxxx X0, X0, X0, X0 | ||||||||
00
|
XX Launch | Send txt msg to P2 from Non-Cricket phone (000-000-0000) | ||||||||
54
|
IT Launch | Send txt msg to P1 from website. | ||||||||
55
|
SOM | Send txt msg to P3 from Non-Cricket phone () within market (LEX phone number) | ||||||||
56
|
SOM | *PAY |
Market Provisioning Test Plan | ||||||||
Status | Phone Number | ESN | Rate Plan | |||||
Phone 1
|
Active | A30 | ||||||
Phone 2
|
Active | A30 | ||||||
Phone 3
|
Active | A30 | ||||||
Phone 4
|
Active | A30 |
VOICECUE | ||||||||||
Outcome | ||||||||||
Test # | Owner | Scenario | Success | Failure | Comment | |||||
1
|
IT Launch | Remove HOT from P3, add $5 to CANMEX bucket for P3 | ||||||||
2
|
SOM | P3 call Int/L Canada 000-000-0000 | ||||||||
3
|
IT Launch | Verify call rated at $0.05/min | ||||||||
4
|
SOM | P3 call Int/L Mexico 000-00-00-0000-0000 | ||||||||
5
|
IT Launch | Verify call rated at $0.05/min | ||||||||
6
|
IT Launch | Add $10 to Any Use bucket for P3 | ||||||||
7
|
SOM | P3 call Alaska 000-000-0000 | ||||||||
8
|
IT Launch | Verify call rated at $0.08/min | ||||||||
9
|
IT Launch | Add $2 to Monthly DA bucket for P3 | ||||||||
10
|
SOM | P3 call DA | ||||||||
11
|
IT Launch | Verify call rated at $1.00 from Monthly DA bucket | ||||||||
12
|
SOM | P3 call Intl France 000 000 000 00 000 | ||||||||
13
|
IT Launch | Verify P1 call rated through VC at $0.10 | ||||||||
14
|
SOM | P3 call Intl England 000 00 00 0000 0000 | ||||||||
15
|
IT Launch | Verify P3 call rated through VC at $0.10 | ||||||||
16
|
SOM | P3 call Intl Portugal 000 000 000 000 000 | ||||||||
17
|
IT Launch | Verify P3 call rated through VC at $0.10 | ||||||||
18
|
SOM | P3 called intl Romania 011 40 21 200 3381 | ||||||||
19
|
IT Launch | Verify P3 call rated through VC at $0.20 | ||||||||
20
|
SOM | P3 called intl Belize 000 000 000 0802 | ||||||||
21
|
IT Launch | Verify P3 call rated through VC at $0.30 | ||||||||
22
|
SOM | P3 called intl Haiti 011 509 222 0200 | ||||||||
23
|
IT Launch | Verify P3 call rated through VC at $0.60 |
Market Provisioning Test Plan | ||||||||
Status | Phone Number | ESN | Rate Plan | |||||
Phone 1
|
Active | A30 | ||||||
Phone 2
|
Active | A30 | ||||||
Phone 3
|
Active | A30 | ||||||
Phone 4
|
Active | A30 |
Call | Special | |||||||||||||
Model # | Call Scenario | Calling Number | Called Number | Date | Start Time | Duration | Instructions/Comments | |||||||
1
|
L/M -> L/M (M/M) | |||||||||||||
3
|
L/M -> 611 (M/L) | |||||||||||||
4
|
L/M -> 911 (M/L) | |||||||||||||
5
|
L/M -> 800 NXX Line | |||||||||||||
8
|
L/M -> L/L | |||||||||||||
9
|
L/M -> T/L Interlata/Intrastate |
|||||||||||||
10
|
L/M -> T/L Intralata/Interstate |
|||||||||||||
11
|
L/M -> T/L Interstate |
|||||||||||||
12
|
L/M — T/L U.S. Territories |
|||||||||||||
*Not critical, but if you can perform, please do | ||||||||||||||
14
|
L/M -> to Mexico International | |||||||||||||
15
|
L/M -> 1+ to Canada International |
Call | ||||||||||||||
Model # | Call Scenario | |||||||||||||
16
|
L/M -> 7 Digit Dial | |||||||||||||
*If market supports this | ||||||||||||||
17
|
L/M 1 + 7 Digit Dial | |||||||||||||
*If market supports this | ||||||||||||||
18
|
Lost Signal Dropped Call |
|||||||||||||
*Not critical, but if you can perform, please do | ||||||||||||||
19
|
L/L -> L/M L- M (Incoming) |
|||||||||||||
20
|
L/M -> L/M M -M (busy) > 30sec |
|||||||||||||
21
|
L/M -> L/M M-M (busy) < 30sec |
|||||||||||||
22
|
L/M -> L/L M-L (busy) > 30secs |
Call | Special | |||||||||||||
Model # | Call Scenario | Calling Number | Called Number | Date | Start Time | Duration | Instructions/Comments | |||||||
23
|
L/M -> L/L M-L (Busy) < 30secs |
|||||||||||||
24
|
L/M -> Star (*) Calls | |||||||||||||
26
|
L/M -> # Calls | |||||||||||||
*If market supports this | ||||||||||||||
27
|
L/M -> 411(DA) |
Call | ||||||||||||||
Model # | Call Scenario | Insufficient Balance | ||||||||||||
28
|
L/M -> 555-1212 (DA) | Insufficient Balance | ||||||||||||
30
|
L/M -> 411 (DACC) Local Call Completion |
|||||||||||||
*If market supports this | ||||||||||||||
31
|
L/M -> 411 (DACC) LD Call Completion |
|||||||||||||
*If market supports this |
Special | ||||||||||||||
Call | Instructions/ | |||||||||||||
Model # | Call Scenario | Comments | ||||||||||||
Call Waiting Call Series | ||||||||||||||
100-1
|
1. A L/M->X X/M , CW 2. C L/M -> A L/M |
|||||||||||||
100-2
|
1. A L/M->X X/M , CW 2. C L/M -> A L/M |
|||||||||||||
101-1
|
1. A L/M -> Land , CW 2. C L/M -> A L/M |
|||||||||||||
101-2
|
1. A L/M -> Land , CW 2. C L/M -> A L/M |
|||||||||||||
102-1
|
1. A L/M -> X X/M . CW | |||||||||||||
2. C L/M -> A L/M * | Busy |
|||||||||||||
102-2
|
1. A L/M -> X X/M . CW | |||||||||||||
2. C L/M -> A L/M * | Busy |
|||||||||||||
103-1
|
1. A L/M -> Land . CW 2. C L/M -> A L/M * |
|||||||||||||
103-2
|
1. A L/M -> Land . CW 2. C L/M -> A L/M * |
Special | ||||||||||||||
Call | Instructions/ | |||||||||||||
Model # | Call Scenario | Comments | ||||||||||||
104-1
|
1. A L/M -> Land T/L 2. C L/M -> A L/M * |
|||||||||||||
104-2
|
1. A L/M -> Land T/L 2. C L/M -> A L/M * |
|||||||||||||
105-1
|
1.A L/M -> X X/M. CW 2. T/L -> A L/M * |
|||||||||||||
105-2
|
1. A L/M -> X X/M. CW 2. T/L -> A L/M * |
Call | ||||||||||||||
Model # | Call Scenario | |||||||||||||
Three-Way Calling Series | ||||||||||||||
150-1
|
1. A L/M ->X X/M, then 2. A L/M -> C L/M |
|||||||||||||
150-2
|
1. A L/M ->X X/M, then 2. A L/M -> C L/M |
|||||||||||||
151 -1
|
1. A L/M ->X X/M, then 2 X X/M -> C L/M. |
|||||||||||||
151 -2
|
1. A L/M ->X X/M, then 2 X X/M -> C L/M. |
|||||||||||||
152-1
|
1. A L/M ->X X/M, then 2. X X/M ->C L/M busy |
|||||||||||||
152-2
|
1. A L/M ->X X/M, then 2. X X/M ->C L/M,busy |
Call | ||||||||||||||
Delivery | ||||||||||||||
Series | ||||||||||||||
400
|
Call Delivery X-X | |||||||||||||
400
|
Call Delivery M-M | |||||||||||||
401
|
Call Delivery L-M-L | |||||||||||||
402
|
Call Delivery L-M-M |
Call | Start | Special | ||||||||||||
Model # | Call Scenario | Time | Duration | Instructions/Comments | ||||||||||
500
|
VM Deposit A L/M -> X X/M |
|||||||||||||
501
|
VM Deposit L/L -> X X/M |
|||||||||||||
502
|
VM Retrieve X X/M -> X X/M |
Dial own 10 digit number | ||||||||||||
504-1
|
VM Retrieve X X/M -> X X/M |
Any special translation numbers (Star codes, etc.) Please note code used |
Call | Start | Special | ||||||||||||
Model # | Call Scenario | Time | Duration | Instructions/Comments | ||||||||||
600
|
Additional Call Types | |||||||||||||
L/M-> ANY 10 DIGIT ENDING IN 911 *Not critical, but if you can perform, please do |
Call | Special | |||||||||||||
Model # | Call Scenario | Instructions/Comments | ||||||||||||
702-1
|
P/L/M -> P/L/M (MIN¹MDN) |
|||||||||||||
703-1
|
P/L/M -> L/M (MIN¹MDN) |
|||||||||||||
707-1
|
P/L/M -> F/M (MIN¹MDN) |
|||||||||||||
709-1
|
P/L/M -> L/L (MIN¹MDN) |
|||||||||||||
711-1
|
P/L/M -> T/L (MIN¹MDN) |
|||||||||||||
*Long Distance | ||||||||||||||
712-1
|
VM Deposit — P/L/M -> P/L/M (MIN¹MDN) | |||||||||||||
714-1
|
P/L/M -> 911 (MIN¹MDN) |
|||||||||||||
715-1
|
P/L/M -> Customer Care (611) (MIN¹MDN) |
Notes: | ||
1. | These test items are AMA test items. Cricket shall develop the ATP test plan and execute all tests. Huawei provides interface support. | |
2. | If third party fails any test which is not caused by Huawei system, there shall be no impact on Huawei system acceptance |
Status | Phone Number | ESN | Rate Plan | |||||
Phone 1
|
Active | PP0 | ||||||
Phone 2
|
Active | PP0 | ||||||
Phone 3
|
Active | PP0 |
Outcome | ||||||||||
Test # | Owner | Scenario | Success | Failure | Comment | |||||
1
|
IT Launch | Phones activated in 054 | ||||||||
2
|
SOM | Program ALL phones, OTA *228 | ||||||||
3
|
SOM | Label all phones 1, 2, & 3 | ||||||||
4
|
SOM | Verify the you are able to make mobile to mobile phone calls. | ||||||||
5
|
SOM | P3 call P2, verify Call ID, P1 call P2 verify Call ID, Call Wt, VM indicator/retrieval |
||||||||
6
|
SOM | 000-000-0000 (M) call P1, verify Call ID, 000-000-0000 (LL) call P1 verify Call ID, Call Wt, VM indicator/retrieval | ||||||||
0
|
XXX | X0 xxxx X0, X0 xxxx X0; connect 3-way | ||||||||
8
|
SOM | P2 send P1 txt msg, verify msg indicator |
DACC/UDA
Technical Implementation
End-to-End Test Plan
Date June 14, 2006
1 | DACC/DA Technical Implementation End-to-End Test Plan | ||
1.1 | Background |
Rate Plans | Legacy | Legacy | ||||||||||||||
A/C 30 | A/C 35 | A/C 40 | A/C 45 | JUMP | ROAMING | With ULD | Without ULD | |||||||||
FUNCTIONALITY |
||||||||||||||||
Purchase Unlimited DA
|
X | X | ||||||||||||||
Purchase Transactional DA
|
X | X | X | X | X | X | X | X | ||||||||
Have Calls Completed if on UDA
|
X | X | ||||||||||||||
Have Calls Completed if not on UDA
|
X | X | X | X | X |
1.2 | Testing Scope |
– | Full English Automation | ||
– | Partial English Automation | ||
– | Partial Spanish Automation | ||
– | Testing UDA scenarios on AC 40 & AC 45 rate plans, including those with & without ECA, and in Local & Roaming markets | ||
– | Testing DACC scenarios | ||
– | Testing of JUMP scenarios |
||
– | Customer/sales experience in adding the UDA feature to the rate plan | ||
– | Testing/validation of data/information passing from POS to call implementation |
1.3 | Testing Logistics |
1. | Local market test phone on customer rate plan (details for each test scenario are listed in the test cases) | ||
2. | Ability to change rate plans, add and remove ECA and Funds | ||
3. | Roaming test phone for the market, on customer rate plan | ||
4. | Ability to change rate plans, add and remove ECA and Funds |
A. AC40 — Local
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
1. (no funds) | ||||||||
2. Call is ended |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||||
Hear message(s) | ||||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||||
Remain online | Hear “Please hold while your call is being connected” | |||||||||
Remain online | Connected to requested number |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||||
From handset, dial 000-0000 | Verify call is routed to DID # 000-000-0000 | |||||||||
Hear message(s) | ||||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||||
Press 1 | Hear prompt “What city and state please?” | |||||||||
Remain silent | Forwarded to Eng speaking operator... — they conduct search (asking for city & state and listing) | |||||||||
Respond to agent with city, state,, & listing, time & temperature | Operator thanks you for calling and sends you to automation with listing information. | |||||||||
Remain online | Hear “Please hold while your call is being connected” | |||||||||
Remain online | Connected to requested number |
Will test in English but verify go to Spanish operator
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset(NPA) 000-0000 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Press 2 | Routed to Spanish speaking operator — conducting search by asking for city, state, and listing | |||||||
Tell operator you are conducting a test, (if you are not fluent in Spanish, they do all speak English) — respond with city, state and request Time & Temperature | Operator thanks you for calling and sends you to automation with listing information. | |||||||
Remain online | Hear “Please remain on the line, your call is being connected at no additional charge” — (in Spanish) | |||||||
Remain online | Connected to requested number |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||
Remain online | Hear “Please hold while your call is being connected” | |||||||
Remain online | Connected to requested number |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||||
Hear message(s) | ||||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||||
Remain online | Hear “the number you have requested is (NPA) NXX-xxxx, again, that number is (NPA) NXX — xxxx.” | |||||||||
Remain online | Hear prompt “For another listing, press 1” | |||||||||
End call | No further action required |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
1. (no funds) | ||||||||
2. Call is ended |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||
Remain online | Hear “Please hold while your call is being connected” | |||||||
Remain online | Connected to requested number |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 000-0000 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Press 1 | Hear prompt “What city and state please?” | |||||||
Remain silent | Forwarded to Eng speaking operator... — they conduct search (asking for city & state and listing) | |||||||
Respond to agent with city, state,, & listing, time & temperature | Operator thanks you for calling and sends you to automation with listing information. | |||||||
Remain online | Hear “Please hold while your call is being connected” | |||||||
Remain online | Connected to requested number |
Will test in English but verify go to Spanish operator
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset(NPA) 000-0000 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Press 2 | Routed to Spanish speaking operator — conducting search by asking for city, state, and listing | |||||||
Tell operator you are conducting a test, (if you are not fluent in Spanish, they do all speak English) — respond with city, state and request Time & Temperature | Operator thanks you for calling and sends you to automation with listing information. | |||||||
Remain online | Hear “Please remain on the line, your call is being connected at no additional charge” — (in Spanish) | |||||||
Remain online | Connected to requested number |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||
Remain online | Hear “Please hold while your call is being connected” | |||||||
Remain online | Connected to requested number |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||
Remain online | Hear “the number you have requested is (NPA) NXX-xxxx, again, that number is (NPA) NXX – xxxx.” | |||||||
Remain online | Hear prompt “For another listing, press 1” | |||||||
End call | No further action required |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||||
Hear message(s) | ||||||||||
1. (no funds) | ||||||||||
2. Call is ended |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||
Remain online | Hear “Please hold while your call is being connected” | |||||||
Remain online | Connected to requested number |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 000-0000 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Press 1 | Hear prompt “What city and state please?” | |||||||
Remain silent | Forwarded to Eng speaking operator... — they conduct search (asking for city & state and listing) | |||||||
Respond to agent with city, state,, & listing, time & temperature | Operator thanks you for calling and sends you to automation with listing information. | |||||||
Remain online | Hear “Please hold while your call is being connected” | |||||||
Remain online | Connected to requested number |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset(NPA) 000-0000 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Press 2 | Routed to Spanish speaking operator – conducting search by asking for city, state, and listing | |||||||
Tell operator you are conducting a test, (if you are not fluent in Spanish, they do all speak English) – respond with city, state and request Time & Temperature | Operator thanks you for calling and sends you to automation with listing information. | |||||||
Remain online | Hear “Please remain on the line, your call is being connected at no additional charge” – (in Spanish) | |||||||
Remain online | Connected to requested number |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||
Remain online | Hear “Please hold while your call is being connected” | |||||||
Remain online | Connected to requested number |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||
Remain online | Hear “the number you have requested is (NPA) NXX-xxxx, again, that number is (NPA) NXX – xxxx.” | |||||||
Remain online | Hear prompt “For another listing, press 1” | |||||||
End call | No further action required |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
1. (no funds) | ||||||||
2. Call is ended |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||
Remain online | Hear “Please hold while your call is being connected” | |||||||
Remain online | Connected to requested number |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 000-0000 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Press 1 | Hear prompt “What city and state please?” | |||||||
Remain silent | Forwarded to Eng speaking operator... — they conduct search (asking for city & state and listing) | |||||||
Respond to agent with city, state,, & listing, time & temperature | Operator thanks you for calling and sends you to automation with listing information. | |||||||
Remain online | Hear “Please hold while your call is being connected” | |||||||
Remain online | Connected to requested number |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset(NPA) 000-0000 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Press 2 | Routed to Spanish speaking operator – conducting search by asking for city, state, and listing | |||||||
Tell operator you are conducting a test, (if you are not fluent in Spanish, they do all speak English) – respond with city, state and request Time & Temperature | Operator thanks you for calling and sends you to automation with listing information. | |||||||
Remain online | Hear “Please remain on the line, your call is being connected at no additional charge” – (in Spanish) | |||||||
Remain online | Connected to requested number |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||
Remain online | Hear “Please hold while your call is being connected” | |||||||
Remain online | Connected to requested number |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||
Remain online | Hear “the number you have requested is (NPA) NXX-xxxx, again, that number is (NPA) NXX – xxxx.” | |||||||
Remain online | Hear prompt “For another listing, press 1” | |||||||
End call | No further action required |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
1. (no funds) | ||||||||
2. Call is ended |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||
Remain online | Hear “The number is (NPA) NXX-XXXX Once again that number is (NPA) NXX-XXXX. For another listing, press 1” | |||||||
Remain online | Call ended |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Cricket Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||
Remain online | Hear “The number is (NPA) NXX-XXXX Once again that number is (NPA) NXX-XXXX. For another listing, press 1” | |||||||
Remain online | Call ended |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
1. (no funds) | ||||||||
2. Call is ended |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Jump Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||
Remain online | Hear “The number is (NPA) NXX-XXXX Once again that number is (NPA) NXX-XXXX. For another listing, press 1” | |||||||
Remain online | Call ended |
Time/Date | Action | Desired Results | Pass/Fail | Notes | ||||
From handset, dial 411 | Verify call is routed to DID # 000-000-0000 | |||||||
Hear message(s) | ||||||||
“Jump Directory assistance.” “For English please stay on the line or press 1. Para Espanol, oprima dos.” | ||||||||
Stay on the line | Hear prompt “What city and state please?” | |||||||
Say: “(city), (state)” | Hear prompt requesting listing | |||||||
Say “time & temperature” | Hear audio response for listing (may hear “we have a listing for X, would you like that one?”) | |||||||
Remain online | Hear “The number is (NPA) NXX-XXXX Once again that number is (NPA) NXX-XXXX. For another listing, press 1” | |||||||
Remain online | Call ended |
Notes: | ||
1. | These test items are UDA test items. Cricket shall develop the ATP test plan and execute all tests. Huawei provides interface support. | |
2. | If third party fails any test which is not caused by Huawei system, there shall be no impact on Huawei system acceptance |
CALEA tracking of all required features and calls
Notes: | ||
1. | These test items are CALEA test items. Cricket shall develop the ATP test plan and execute all tests. Huawei provides interface support. | |
2. | If third party fails any test which is not caused by Huawei system, there shall be no impact on Huawei system acceptance |
2/20/2009 |