Commissioning Criteria definition

Commissioning Criteria means and refer to the commissioning criteria set forth on Exhibit “E-1”.
Commissioning Criteria means the commissioning criteria to be satisfied by the Contractor for issuance of each Certificate of Successful Commissioning, as detailed in Section 4.6 of the Employer’s Requirements.
Commissioning Criteria means and refer to the commissioning criteria set forth on Exhibit E-13. "Customer" has the meaning assigned to such term in Section 10.4.

Examples of Commissioning Criteria in a sentence

  • Seller or Seller's subcontractor, as applicable, shall test the Equipment in accordance with its standard testing procedures to determine Equipment conformity with the standards and specifications (hereinafter "Commissioning Criteria") of the applicable Seller installation manuals, as may be amended from time to time.


More Definitions of Commissioning Criteria

Commissioning Criteria means and refer to the commissioning criteria set forth onExhibit E-13. “Customer” has the meaning assigned to such term in Section 10.4.
Commissioning Criteria means and refer to the commissioning criteria set forth on Exhibit “E-1”. Confidential Treatment Requested by Carbonite, Inc.
Commissioning Criteria means and refer to the commissioning criteria set forth on Exhibit E-13.
Commissioning Criteria means and refer to the commissioning criteria set forth on Exhibit “E-1”, which the Landlord and Tenant shall work in good faith to amend prior to the date that is sixty (60) days prior to the date on which the EPC Contractor will begin its initial testing and Commissioning as set forth in the Exhibit “J-2” (Overall Project Schedule) to account for Tenant’s operational requirements and to align the “Commissioning Criteria” with the requirements for commissioning set forth in the EPC Agreement.
Commissioning Criteria means and refer to the commissioning criteria set forth on Exhibit “E-1”, which the Landlord and Tenant shall work in good faith to amend prior to the execution of the EPC Agreement to account for Tenant’s operational requirements and to align the “Commissioning Criteria” with the requirements for commissioning set forth in the EPC Agreement.
Commissioning Criteria means and refer to the commissioning criteria set forth on Exhibit “E-2”.
Commissioning Criteria means and refers to, for any Colocation Space Increment, the commissioning criteria established for such Colocation Space Increment by Supplier and the properly qualified third party engineering firm that will perform the Commissioning with respect to such Colocation Space Increment (the “Commissioning Agent”), subject to this Schedule ”E” . Commissioning consists of five general levels of activities summarized as follows: Level 1Factory Testing Manufacturers’ standard test reports will be reviewed prior to shipment of equipment to the site. Level 2 – Component Verification Individual system components are verified at the site upon delivery for compliance with the design specifications, drawings, and approved submittals or shop drawings. Level 3System Construction Verification As the components are assembled into individual systems, the construction or installation of the overall system is verified. This includes an evaluation of interconnection between components, physical arrangement, support and anchoring, and access and clearance. Level 4Individual System and Major Equipment Operation Verification Subsequent to the completion of construction and assembly of each individual system or major equipment element, it is started-up and tested for proper functional operation and performance. Level 5Integrated Systems Operation Verification The test procedures that comprise Level 5 commissioning are designed to simulate the operation of the Premises’ infrastructure during a full range of operational situations, including loss of utility services, single and multiple equipment failure, normal sequential changes to the equipment operation, and planned maintenance operations. This effort is dependent upon the successful completion of all prior levels of commissioning. The assembly of appropriate documentation and certifications for the completion of Level Four commissioning will be a prerequisite. Level 5 commissioning will typically be completed in four basic steps: ▪ Initial planningPreparation of test procedures ▪ Implementation of tests ▪ Issuance by Commissioning Agent of a “Commissioning Complete Letter”. Customer (or its sublicensee) will have the option of providing representation to participate in each Commissioning activity. Representative(s) of Customer (or its sublicensee) may: (a) participate in the development of the Commissioning plan; (b) receive advance materials, including, but not limited to, equipment documentation and test script...