Integrated Systems Operation Verification. The test procedures that comprise Level 5 commissioning are designed to simulate the operation of the Premises’ infrastructure during a full range of operational situations, including loss of utility services, single and multiple equipment failure, normal sequential changes to the equipment operation, and planned maintenance operations. This effort is dependent upon the successful completion of all prior levels of commissioning. The assembly of appropriate documentation and certifications for the completion of Level Four commissioning will be a prerequisite. Level 5 commissioning will typically be completed in four basic steps: ▪ Initial planningPreparation of test procedures ▪ Implementation of tests ▪ Issuance by Commissioning Agent of the Commissioning Complete Letter. [***] Information has been omitted and filed separately with the Securities and Exchange Commission. Confidential Treatment has been requested with respect to the omitted portions. EXHIBIT “F” SERVICE LEVEL
AutoNDA by SimpleDocs
Integrated Systems Operation Verification. The test procedures that comprise Level 5 commissioning are designed to simulate the operation of the Infrastructure for a particular Datacenter during a full range of operational situations, including loss of utility services, single and multiple equipment failure, normal sequential changes to the equipment operation, and planned maintenance operations. This effort is dependent upon the successful completion of all prior levels of commissioning. The assembly of appropriate documentation and certifications for the completion of Level Four commissioning will be a prerequisite. Level 5 commissioning will typically be completed in four basic steps: ▪ Initial planningPreparation of test procedures ▪ Implementation of tests ▪ Issuance by Commissioning Agent of the Commissioning Complete Letter. EXHIBIT “E-3” INTENTIONALLY OMITTED CONFIDENTIAL MATERIAL HAS BEEN OMMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISION. BOXES AND ASTERIXES DENOTE SUCH OMISSION EXHIBIT “E-4” COMMENCEMENT DATE NOTICE _________ __, 201__ VIA [FAX/E-MAIL]: [# OR E-MAIL ADDRESS] AND FEDERAL EXPRESS Rackspace US, Inc. [INSERT TENANT'S ADDRESS FOR NOTICES FROM BLI #3] Re: That certain Datacenter Lease with an effective date of ______ __, 20__ (as amended and modified from time to time, the “Lease”), by and between Rackspace US, Inc. (“Tenant”), as tenant, and Xxxxxxx Technology Park Partners, LLC (“Landlord”), as landlord, covering certain premises more particularly described in the Lease at that certain building located at 0000 Xxxxxxxxxx Xxxx Xxxxxxxxx, Xxxxxxxxxx, Xxxxx. Capitalized terms not otherwise defined herein shall have the meanings ascribed to them in the Lease. Ladies and Gentlemen: Please be advised that Landlord has caused each of the [Commencement Date Conditions (A)] [Commencement Date Conditions (B)] to be completed. Accordingly, Landlord confirms that the [Commencement Date (A)] [Commencement Date (B)] of the Lease is _______ ___, 20__. Should you have any questions, please contact Xxxxx X'Xxxxx at (000) 000-0000, who will be glad to assist you. Sincerely, XXXXXXX TECHNOLOGY PARK PARTNERS, LLC, a Delaware limited liability company By: [NAME] [TITLE] On behalf of Landlord [INSERT ADDITIONAL NOTICE ADDRESSES, IF APPLICABLE] cc: CONFIDENTIAL MATERIAL HAS BEEN OMMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISION. BOXES AND ASTERIXES DENOTE SUCH OMISSION 40 CONFIDENTIAL MATERIAL HAS BEEN OMMITTED AND FILED SEPARATELY WITH THE SECURITIE...
Integrated Systems Operation Verification. The test procedures that comprise Level 5 commissioning are designed to simulate the operation of the Premises during a full range of operational situations, including loss of utility services, single and multiple equipment failure, normal sequential changes to the equipment operation, and planned maintenance operations. Tenant shall have the right to review the test procedures in advance to confirm that such test procedures are in accordance with generally accepted practices. This effort is dependent upon the successful completion of all prior levels of commissioning. The assembly of appropriate documentation and certifications for the completion of Level Four commissioning will be a prerequisite. Level 5 commissioning will typically be completed in four basic steps: • Initial planningPreparation of test procedures • Implementation of tests • Documentation of test results. Tenant shall have the right to review the test results to confirm that the test results are in accordance with the objective requirements set forth in the test procedures. To the extent that is possible, training of operational staff will be enhanced by their witnessing of and participation in the actual Level 5 testing. Specific training exercises may be considered where appropriate and time allows. EXHIBIT “E-2”
Integrated Systems Operation Verification. The test procedures that comprise Level 5 commissioning are designed to simulate the operation of the Premises’ infrastructure during a full range of operational situations, including loss of utility services, single and multiple equipment failure, normal sequential changes to the equipment operation, and planned maintenance operations. This effort is dependent upon the successful completion of all prior levels of commissioning. The assembly of appropriate documentation and certifications for the completion of Level Four commissioning will be a prerequisite. Level 5 commissioning will typically be completed in three basic steps: ● Initial planningPreparation of test procedures ● Implementation of tests 1 NTD: Sample text in this exhibit to be replaced with relevant excerpts from EPC Agreement exhibits related to commissioning procedures. EXHIBIT “F” SERVICE LEVEL AGREEMENT Table A. Critical Load Power: Tenant requires 185 megawatts of 3 phase / 240 volt power, or, upon the prior written consent of Landlord, such increased amount that the transformer serving the Premises cam safely support, as certified by an electrical engineer or other licensed professional reasonably acceptable to Landlord. Back-Up Power Specifications: Tenant requires that the server room load of approximately 400 amps of 3 phase 120/208 volt power remain energized during a primary power outage.
Integrated Systems Operation Verification. The test procedures that comprise Level 5 commissioning are designed to simulate the operation of the Premises’ infrastructure during a full range of operational situations, including loss of utility services, single and multiple equipment failure, normal sequential changes to the equipment operation, and planned maintenance operations. This effort is dependent upon the successful completion of all prior levels of commissioning. The assembly of appropriate documentation and certifications for the completion of Level Four commissioning will be a prerequisite. Level 5 commissioning will typically be completed in three basic steps: ■ Initial planningPreparation of test procedures ■ Implementation of tests 1 NTD: Sample text in this exhibit to be replaced with relevant excerpts from EPC Agreement exhibits related to commissioning procedures. EXHIBIT “F” SERVICE LEVEL AGREEMENT Table A. Critical Load Power: Tenant requires up [***], or, upon the prior written consent of Landlord, such increased amount that the transformer serving the Premises can safely support, as certified by an electrical engineer or other licensed professional reasonably acceptable to Landlord. Each Energization Notice Block shall be energized by Landlord in accordance with Section 6.10 of the Lease following Landlord’s receipt of the applicable Energization Notice. Back-Up Power Specifications: Tenant requires that the Server Room load of approximately 400 amps of 3 phase 120/208 volt power remain energized during a primary power outage.

Related to Integrated Systems Operation Verification

  • Review Systems The Asset Representations Reviewer will maintain and utilize an electronic case management system to manage the Tests and provide systematic control over each step in the Review process and ensure consistency and repeatability among the Tests.

  • Review Systems; Personnel It will maintain business process management and/or other systems necessary to ensure that it can perform each Test and, on execution of this Agreement, will load each Test into these systems. The Asset Representations Reviewer will ensure that these systems allow for each Review Receivable and the related Review Materials to be individually tracked and stored as contemplated by this Agreement. The Asset Representations Reviewer will maintain adequate staff that is properly trained to conduct Reviews as required by this Agreement.

  • Service Description The Transfer Agent updates the System daily to reflect each day's business activity. The Fund relies upon the timely update of information in order to respond to investor's inquiries. The Transfer Agent will provide Dreyfus with a System report indicating the time of day that files were updated and available for Dreyfus. The timeliness of availability of these screens with updated information will determine the Transfer Agent's level of performance.

  • Support Services Other than the assistance provided in the Information, the BNPP Entities do not offer any support services in connection with the Software.

  • TECHNICAL SUPPORT SERVICES 2.1 The technical support services (the "Services"): Party A agrees to provide to Party B the relevant services requested by Party B, which are specified in Exhibit 1 attached hereto ("Exhibit 1").

  • Hosting Services GSI shall load the Web site onto server(s) that are connected to the Internet and readily accessible via the Web through use of the Domain Names. GSI shall ensure that the Web site is functional and ready to process transactions in a reasonably efficient manner.

  • Program Management (WBS 1.1) All components of the Project Management Plan as implemented for the Base Contract and Options 1-4 will be reviewed and amended to reflect specific needs for Option 5 and the outcome of continuous process improvement evaluations.

  • Project Management With respect to each Project Plan, each party will appoint a project manager who will be the party responsible for overseeing the Project Plan.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Customer Services Provide services and systems dedicated to customer service, including billing, remittance, credit, collections, customer relations, call centers, energy conservation support and metering.

Time is Money Join Law Insider Premium to draft better contracts faster.