Issued for Construction Drawings definition

Issued for Construction Drawings has the meaning set out in Section 4.2 of Schedule 2 [Design and Construction Protocols];
Issued for Construction Drawings or “IFC Drawings” has the meaning set out in Schedule 2 [General Conditions];
Issued for Construction Drawings means those Deliverables necessary for the Infraco to commence construction of the relevant part of the Infraco Works and as shown on the Design Delivery Programme which have been fully approved by all Approval Bodies and in accordance with the Review Procedure;

Examples of Issued for Construction Drawings in a sentence

  • Issued for Construction Drawings shall be sealed by Registered Professional Engineer licensed to practice in the State of Texas.

  • This is likely to bring the total cost to LAs in Wales to around£440.

  • Where, under the Contract Documents, the Contractor is to assume responsibility for the design of a specified portion of the Work (collectively, the “Design-Build Work”), the Contractor will undertake and have complete responsibility for such design, including the preparation and issuance of the Issued for Construction Drawings in accordance with Schedule 6 [Specifications and Drawings].

  • Establish and maintain a systematic, documented, comprehensive, verifiable, and continuous systems integration process applied throughout the duration of the Contract to implement the intent of the Contract Documents and the Issued for Construction Drawings and Issued for Construction Specifications.

  • When the systems integration process results in a complete integrated product with no special parts or features, the Issued for Construction Drawings and Issued for Construction Specifications and approved Shop Drawings shall suffice as complete documentation.

  • A matrix of all systems testing required by the Contract Documents and the Issued for Construction Drawings and Issued for Construction Specifications to be performed by Design-Builder, Suppliers, or Subcontractors.

  • If the Contractor proceeds with Work prior to receiving Issued for Construction Drawings for such Work and such construction and related Work is covered, then Hydro’s Representative may direct the Contractor to uncover and make good such construction and related Work at the Contractor’s sole cost and expense and the provisions of Section 3.16(k) of this Schedule 2 [General Conditions] will apply.

  • Prepare the design by developing detailed Issued for Construction Drawings, Issued for Construction Specifications, design calculations, analyses and reports, with all engineering required in accordance with accepted industry practices and submit milestone design submittals to Arlington County and the WMATA Representative for Approval.

  • Develop and maintain a Design Control Plan (DCP) that establishes basic guidelines for the preparation and development of design documents culminating in Issued for Construction Drawings and Issued for Construction Specifications.

  • During the Construction phase, the General Contractor is required to refer to unlinked 2D Issued for Construction Drawings (IFC) for:• Dimensional Details and Documentation for other information.• Issue new set of detailed 2D shop drawings and Fabrication.• It’s not considerable amount of time is spent in performing non-value added tasks such as searching, accessing and validating the massive information.


More Definitions of Issued for Construction Drawings

Issued for Construction Drawings or “IFC Drawings”). If the Contractor proceeds with Work prior to receiving Issued for Construction Drawings for such Work and such construction and related Work is covered, then Hydro’s Representative may direct the Contractor to uncover and make good such construction and related Work at no extra cost or expense to BC Hydro and the provisions of Section 3.16(k) of this Schedule 2 [General Conditions] will apply.
Issued for Construction Drawings means the detailed design drawings and specifications for the Triggered Infrastructure Works (which must be consistent with the Conceptual Design and Detailed Design and Construction Drawings) sealed by a professional engineer and approved by the City Engineer, including any subsequent revisions proposed by the Nation and approved by the City Engineer;

Related to Issued for Construction Drawings

  • Construction Drawings means those drawings containing the technical details associated with the design, construction and installation of the Infrastructure;

  • Original construction ’ shall mean the first or initial construction

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Construction sign means a sign which identifies the architect, engineers, contractors and other individuals or firms involved with the construction of a building, or announces the character of the building or enterprise, which is erected during the building construction period.

  • Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Contract Drawings means only those drawings specifically entitled as such and listed in the Specifications or in any Addendum, or any drawings furnished by the Commissioner, pertaining or supplemental thereto.

  • Maximum design heat input means the ability of a unit to combust a stated maximum amount of fuel per hour on a steady state basis, as determined by the physical design and physical characteristics of the unit.

  • Construction and Demolition Debris means and includes:

  • Acquisition and Construction Fund means the fund so designated in, and created pursuant to, Section 502 hereof.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.

  • As-built drawings, as used in this clause, means drawings submitted by the Contractor or subcontractor at any tier to show the construction of a particular structure or work as actually completed under the contract. “As-built drawings” shall be synonymous with “Record

  • Tenant Improvement Allowance in the maximum amount of $200.00 per rentable square foot in the Premises, which is included in the Base Rent set forth in the Lease; and

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • General Arrangement Drawings shall have the meaning set forth in Clause 3.1 (iii) (b);

  • The DRAWINGS / MAPS means the drawing/map or drawings/maps mentioned in NIT and any modifications of them approved by the Employer or any further Working drawings/maps or sketches by the Employer or any further working drawings/maps or sketches which may be furnished or approved in writing by the Employer.

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • as constructed plans means as constructed plans as defined in the Building Code;

  • Structural Alterations means any Alterations involving the structural, mechanical, electrical, plumbing, fire/life safety or heating, ventilating and air conditioning systems of the Building.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.