Building Prototype and Measure Package Development Sample Clauses

Building Prototype and Measure Package Development. The goal of this subtask is to develop cost-optimized integrated energy efficiency retrofit packages that will serve as the basis of design for the demonstration projects. ● Create Baseline Models using building simulation software such as EnergyPlus and discuss in Baseline Energy Models Report. This report will provide all the assumptions and calculations used for each of the multifamily building typologies represented in the Building Characterization Matrix created in Subtask 3.1. ● Use the baseline models to evaluate the relative impact of the technologies reviewed in Subtask 3.1 and discuss results in a Summary of Evaluation of Technologies. ● Identify screening criteria based on technology fit (site and performance), potential impact (energy and market), readiness for demonstration (i.e. level of previous testing, patent status, previous deployments), and maturity of the manufacturer and/or service provider. Document technology selection process in Emerging Technologies Assessment Criteria Document. ● Identify high potential emerging technologies that could be applied to retrofit packages in the Emerging Technology Report. ● Develop a set of Integrated Energy Efficiency Retrofit Packages PowerPoint Slides based on Subtasks 3.1 and 3.2 to inform the demonstration site selection process and to inform building owners of the value proposition of implementation. ● Prepare a CPR Report #1 and participate in a CPR meeting, per Subtask 1.3. In addition, CPR Report #1 must address how the market scaling activities described in Task 6 could be supported beyond the grant term, including the costs, fees that will need to be charged, and the engagement and partnership strategy for consortiums, financing partners, energy service providers, manufacturers, utilities and others. ● Baseline Energy Models Report ● Summary of Evaluation of Technologies ● Integrated Energy Efficiency Retrofit Package PowerPoint Slides (draft and final) ● Emerging Technologies Assessment Criteria Document (draft and final) ● Emerging Technologies Report ● CPR Report #1 The goal of this subtask is to lab test and/or build construction mockups of innovative and emerging measures as necessary to ensure performance, constructability, and ease of delivery. ● In parallel with Subtask 3.2 determine retrofit measures or integrated measures requiring lab performance testing or construction mockups. ● Work with contractor and manufacturer advisory groups to identify constructability issues. ● Develo...
AutoNDA by SimpleDocs

Related to Building Prototype and Measure Package Development

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.6.1. The ARCHITECT/ENGINEER shall prepare from the approved Schematic Design Studies, the Design Development Documents consisting of drawings (including at least architectural, landscaping, civil, structural, mechanical and electrical plans, building sections; and finish schedule), outline specifications following the Construction Specification Institute "CSI" Format and other necessary documents to fix and describe the size and character of the entire Project as to its site, structural, mechanical, and electrical systems, materials and other such essentials as may be appropriate, for and until approved by the State. 1.1.6.2. The ARCHITECT/ENGINEER shall conduct meetings with the State, Efficiency Vermont, and relevant members of the design team, to review the Design Development Documents for the purposes of furthering the energy efficiency objectives of the Project. 1.1.6.3. The ARCHITECT/ENGINEER shall prepare for the State a revised accounting of how the Project is responding to LEED criteria. 1.1.6.4. The ARCHITECT/ENGINEER shall submit to the State a revised Statement of Probable Construction Cost based thereon for and until approved by the State.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK

  • Software Development Software designs, prototypes, and all documentation for the final designs developed under this agreement must be made fully transferable upon direction of NSF. NSF may make the software design, prototype, and documentation for the final design available to competitors for review during any anticipated re-competition of the project.

  • Placement of EPP probes Probes for measuring EPP parameters shall be placed inside or close to Registrars points of access to the Internet across the different geographic regions; care shall be taken not to deploy probes behind high propagation-­‐delay links, such as satellite links.

  • Completion of Development 7.4.1 Upon the completion of the whole development or complete phases of the development, Council may review this Agreement, in whole or in part, and may: (a) retain the Agreement in its present form; (b) negotiate a new Agreement; (c) discharge this Agreement; or (d) for those portions of the development which are completed, discharge this Agreement and apply appropriate zoning pursuant to the Municipal Planning Strategy and Land Use By-law for Halifax Peninsula as may be amended from time to time.

  • Staff Development ‌ The County and the Association agree that the County retains full authority to determine training needs, resources that can be made available, and the method of payment for training authorized by the County. Nothing in this subsection shall preclude the right of an employee to request specific training.

  • Design XXX XXX XXXXX Plan and Aligned Budget

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!