Construction Protection Plan Sample Clauses

Construction Protection Plan. A. During final design, DTS, in cooperation with its contractors and FTA, will develop a Construction Mitigation Plan (CMP). The CMP will include a Noise and Vibration Mitigation Plan. Per requirements to be included in the FTA Record of Decision (ROD) and FTA guidance entitled, Transit Noise and Vibration Impact Assessment, FTA-VA-90-1003-06 (2006) (FTA Guidance Manual), DTS shall perform quantitative assessments of both noise and vibration which will inform the CMP. Noise and vibration control plans will be updated every six (6) months. The updated plans should predict the construction noise and vibration impacts at sensitive receptor locations based upon the proposed construction equipment and methods. Appropriate construction plan noise and vibration mitigation measures shall be employed as identified in FTA’s Guidance Manual. Numeric limits and monitoring measures will be developed to minimize noise and vibration impacts. Vibration criteria included in Table 12-3, Construction Vibration Damage Criteria, of the FTA Guidance Manual will be applied. Note that most historic properties in the corridor are non- engineered timber or masonry; a criterion of 0.2 inches per second of peak particle velocity would be applicable to these structures. Noise and vibration mitigation strategies will be included in the Noise and Vibration Mitigation Plan.
AutoNDA by SimpleDocs
Construction Protection Plan. 1. To avoid Project-related construction damage to any Built Property and any additional Built Property that may not have been previously identified, as set forth below in I.C., MTA NYCT, in consultation with FTA and SHPO and all other appropriate New York City agencies, will develop Construction Protection Plans for Built Properties. Annexed hereto as Exhibit E is a list of procedures that will be included in Construction Protection Plans, which will be developed prior to construction of the Project. MTA NYCT shall ensure that any Built Property that could be adversely affected by Project construction will be included in a Construction Protection Plan, and MTA NYCT shall implement such plans as appropriate.
Construction Protection Plan. A. Prior to the commencement of any Project-related construction, demolition, or site disturbance, the Developer will develop, in consultation with the SHPO, and implement a Construction Protection Plan (Plan) to safeguard adjacent historic properties and landscape features within the Upper Campus from inadvertent damage during Project construction. The Plan will include input from an historical architect on how to best protect Muskego Church. The Plan shall detail measures for monitoring and protection of historic properties during Project construction as well as address issues related to ground-borne vibrations caused by Project construction in an effort to avoid additional adverse effects to Muskego Church and historic landscape features within the Upper Campus. Once finalized, the Developer shall include the Plan within appropriate contract construction documents in order to inform contractors of their responsibilities for protection of historic properties.
Construction Protection Plan. 1. Prior to the commencement of any construction activities associated with the Project, CSX shall develop a Construction Protection Plan (CPP) based upon standard measures and best practice techniques for similar projects. The CPP will be developed in consultation with the Signatories and will be used to assist CSX and its contractors to avoid and minimize adverse effects on known historic properties. CSX shall prepare and revise the draft CPP until it is approved by the Signatories pursuant to the process outlined in Stipulation IV of this MOA.
Construction Protection Plan. Project construction, which includes excavation work in roadbeds to create utility service connections, is anticipated to occur within 90 feet of the following eight (8) historic properties:

Related to Construction Protection Plan

  • Overdraft Protection Plan If we have approved an overdraft protection plan for your account, we will honor checks drawn on insufficient funds by transferring funds from another account under this Agreement or a loan account, as you have directed, or as required under the Credit Union’s overdraft protection policy. The fee for overdraft transfers, if any, is set forth on the Rate and Fee Schedule. This Agreement governs all transfers, except those governed by agreements for loan accounts.

  • Construction Safety Prior to contract award, the successful bidder must provide a Certificate of Recognition or Letter of Good Standing issued by an occupational health and safety organization approved by the Workers’ Compensation Board of Nova Scotia.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • System Protection Facilities The Interconnection Customer shall, at its expense, install, operate and maintain System Protection Facilities as a part of the Large Generating Facility or the Interconnection Customer’s Interconnection Facilities. The Participating TO shall install at the Interconnection Customer's expense any System Protection Facilities that may be required on the Participating TO’s Interconnection Facilities or the Participating TO’s Transmission System as a result of the interconnection of the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities.

  • System Protection To prevent compromise of systems which contain DSHS Data or through which that Data passes:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Whistle Blower Protection Provided a nurse has followed reasonable policies or procedures issued by the Employer concerned to protect the Employer’s entitlement to investigate and address any allegation of wrongdoing, nurses will not be subject to discipline or reprisal for the reasonable exercise of their professional obligations, including those related to patient advocacy.