Drawing List. Drawing Rev Description Date Issued
Drawing List. Drawings reference applicable industry and DLC specific standards. Contractor’s Work shall be in accordance with the referenced Standard(s). DLC Standards can be found online (see below). The following listing of Standards, which can be found online at the FTP site (see below), should be used to illustrate the kind of Standard(s) Contractor should expect on the project. DLC Construction Standards FTP site: Address: xxx.xxxxxxxx.xxx/xxxxxxxxxxxxx Username: ConstructStds2 * Password may change due to password change periodicity. If password does not work, please contact Xxxx Xxxxx. All applicable codes, standards, specification, and requirements referenced or noted in the this SOW.
Drawing List. Sheet Number Title Firm Valhalla Sewer Relocation Odor Control 1 Cover, Vicinity Map, Table of Contents PMX 2 Design Data Summary, Piping Schedule PMX 3 I&C Legend CH 4 Mechanical Legend CH 5 Structural Notes/Design Criteria CH 6 Electrical Legend and Abbreviations CH 7 P&ID – 2 Stage Odor Control (Biofilter, Carbon) CH 8 I&C Details CH 9 Structural/Mechanical Plan CH 10 Structural/Mechanical Sections CH 11 Details CH 12 Electrical Plan and One-line Diagram CH 13 Electrical Schedules, Motor Control Diagram, Details CH 14 Existing Conditions Plan PMX 15 Proposed Conditions, Utilities PMX 16 Grading and Drainage PMX 17 Erosion Control, Landscape and Irrigation Plan PMX 18 Air Jumper Plan/Profile PMX 19 Forcemain Plan/Profile PMX 20 Forcemain Plan/Profile PMX 21 Forcemain Plan/Profile PMX 22 Forcemain Plan/Profile PMX 23 Forcemain Plan/Profile WG 24 Forcemain Details CH 25 Traffic Control – Mt Washington Drive CH
Drawing List. The Scope of Work is further delineated in the architectural/engineering drawings prepared by IPS, Inc. for which a drawing list appears below. Al Architectural Floor Plan A2 Architectural Reflected Ceiling Plan Ml Heating, Ventilating and Air Conditioning Floor Plan M2 Heating, Ventilating and Air conditioning Equipment, Schedules and Details P1 Underground Plumbing and Potable Water Piping Systems P2 Details, Schedules and Process Equipment Hookups PS Sprinkler Requirements E1 Electrical Power Requirements E2 Electrical Lighting Requirements SP-2 Space Plan drawing by IPS Integrated Project Services dated 1/14/94 are attached as Exhibit D. EXHIBIT E ELECTRICAL MODIFICATIONS Landlord shall provide a 480 volt, 800 amp electrical service to the Lot. The Landlord is responsible for the cost of providing the electrical service and primary meter. Tenant will require electrical power over and above what is required for the use and operation of normal office equipment. Additional power is required to power research related items such as, but not limited to, ice machines, autoclaves, compressors, reheat coils, Neslab coolers, hoods, freezers, refrigerators, glass washers, dry heat oven, homogenizer, centrifuges, and other miscellaneous lab equipment. Tenant agrees that Tenant's electric requirements will not exceed the capacity of a 480 volt, 800 amp electrical service. EXHIBIT F HAZARDOUS MATERIALS Tenant will comply with all federal, state, and local ordinances for the use of hazardous materials. Tenant will use small quantities of organic compounds (e.g. alcohol, acetone, hydrogen peroxide, etc.) for cleaning and research purposes. Quantities will be limited by the limitation set forth in the latest edition of the BOCA code. It is Tenant's responsibility to obtain all permits required for the handling, storage, and disposal of these materials. EXHIBIT G RESEARCH ANIMALS
A. Regulations pertaining to the animals
1. No animal shall weigh more than 10 pounds.
2. No more than 20 animals shall be present within the Leased Premises at any point in tine.
3. The only types of animals permitted in the Leased Premises are laboratory rats, mice and rabbits.
4. No audible noise or odor shall emanate beyond the perimeter walls of the Leased Premises.
5. Transportation of animals in and out of the Leased Premises shall only occur through the loading docks in the rear of the Building and in a concealed manner.
6. Storage of animals shall be within a closed space at least 10 f...
Drawing List. The following table provides a preliminary drawing list for Camas PFAS Evaluation and Design Project. Drawing List Well 13