Drawings issued by the Employer. This is the list of drawings issued by the Employer at or before the Contract Date and which apply to this contract.
AutoNDA by SimpleDocs
Drawings issued by the Employer.  All relevant drawings can be obtained from the Service Manager or Eskom Supervisor.
Drawings issued by the Employer. All relevant electrical, mechanical and control and instrumentation drawings can be obtained from the
Drawings issued by the Employer. This is the list of drawings issued by the Employer at or before the Contract Date and which apply to this contract. Note: Some drawings may contain both Works Information and Site Information. DRA17-SVI-5400 B BY PASS SYSTEM DN 350 (450) PN100 DRA17-SVI-5400 D BY PASS SYSTEM DN 350 (450) PN100 DRA17-SVI-5401 B CONICAL PIPE DRA17-SVI-5402 A WELDING NECK FLANGE DRA17-SVI-5403 A WELDING NECK FLANGE DRA17-SVI-5404 B RING DRA17-SVI-5410 B CONNECTION PIPE DRA17-SVI-5411 A ROD DRA17-SVI 8400 C DOWNSTREAM PIPE DRA17-SVI 9900 A BY PASS DN 350 (450) TEST ARRANGEMENT DRA17-SVI 9901 A BLIND FLANGE DRA17-SVI 9902 A BLIND FLANGE 1 Principal Contractor  Appointment (drawn up by Eskom) CR 4(1)(c)  Mandatory Agreement (drawn up by Eskom) Section 37(2)  Letter Of Good Standing (COIDA) (provided by contractor)  Notification Of Construction Work (to be submitted by contractor to Department of Labour) CR 3(3) 2 Appointment Letters (to be drawn up by contractor)  Assistant to the CEO Section 16(2)  Construction Supervisor CR 6(1)  Assistant Construction Supervisor CR 6(2)  Construction Safety Officer CR 6(6)  Risk Assessor CR 7(1)  Fall Protection Planner CR 8(1)(a)  Formwork & Support work Supervisor CR 10  Scaffold Supervisor & ladder Inspector CR 14  Stacking & Storage Supervisor CR 26(a)  Batch Plant Supervisor CR 18(1)  Demolition Work Supervisor CR 12(1)  Excavation Work Supervisor CR 11(1)  Material Hoist Inspector CR 17  Tower Crane Operator CR 20  Incident Investigator GAR 8/9  First Aider GSR 3(4)  Construction Vehicle Operator CR 21(1)(d)(i)  Construction Vehicle Inspector CR 21(1)(j)  Contractor Appointment (if employing any sub-contractor) CR 5(3)(b) 3 Safety, Health & Environment Risk Assessment (to be drawn up by contractor – Risk Assessor) CR 7(2) 4 Safety Induction Training (conducted by Eskom) 5 Fall Protection Plan (drawn up by contractor where there exists a fall greater than 2 meters – Fall Protection Planner) CR 8(2) 6 Certificates  Medical Fitness Certificates (to be provided by contractor & must be conducted by OHP)  Safety Training Certificates as per Appointment Letters as per point 2 above (to be provided by contractor – training to be done by accredited SETA/DOL training providers)  Trade Test Certificates (to be provided by contractor – qualified artisans)  Letters Of Competencies (to be provided by contractor – e.g qualified artisans)  Load Test Certificates (to be provided by contractor for all lifting equipment and ma...
Drawings issued by the Employer. (Not application)
Drawings issued by the Employer. Drawing number Revision Title KBA0003B051001 0 STRUCTURAL STEEL LAYOUT AND DETAILS SHEET 0 - 0 XXX0000X000000 0 XXXXX XXXXXX AND DETAILS SHEET 1 OF 2 KBA0003B021001 0 FOUNDATION LAYOUT AND DETAILS SHEET 1 OF 1 KBA0003B001008 0 PLAN LAYOUT AND GENERAL NOTES SHEET 1 - 2 KBA0003B001010 0 GENERAL NOTES AND ARCHITECTURAL LAYOUT SHEET 1 - 5 KBA0003B051003 0 STRUCTURAL STEEL LAYOUT AND DETAILS LAYOUT SHEET 1 - 3 KBA0003B021003 0 FOUNDATION LAYOUT AND DETAILS SHEET 1 - 3 17468 CAF-4GF 1 CAF-Ground Floor HVAC Layout 17468 CAF-401 1 CAF-First Floor HVAC Layout 17468 110 0 Extract Air Handling Xxxx 0 XXX0 Xxxxx Xxxxxxx Xxxx 0 ACP2 Architectural Design 3D View 8.1 32-136 Rev 0 – Construction Safety, Health and Environment Procedure 8.2 32-95 Rev 4 – Environmental, Occupational Health and Safety Incident Management Procedure 8.3 32-421 Rev 0 – Eskom cardinal rules 8.4 Nuclear Energy Act 92 of 1982 [Public Document – not supplied] 8.5 National Key Points Act 102 of 1980 [Public Document – not supplied] 8.6 Protection of Information Act 84 of 1982 [Public Document – not supplied] 8.7 Occupational Health and Safety Act (OH&SA#85 of 1993) [Public Document – not supplied] 8.8 KSA-109 Rev 4 – Requirements for Access Authorisation at KOU 8.9 Immigration Act, Act 13 of 2002 [Public Document – not supplied] 8.10 KSA-119 Rev 2 – Management and Control of Supplemental Workers Koeberg Nuclear Power Station 8.11 KAA-611 Rev 5 – Emergency Mustering, Accountability and Evacuation 8.12 Project and Construction Management Act, 48 of 2000 [Public Document – not supplied] 8.13 Occupational Health and Safety Act No. 85 of 1993 8.14 OHSAS 18001:2007 - Occupational health and safety management standard 8.15 KFU-026 Rev 6 – Detailed Design Review Report 8.16 KSA-132 Rev 0 – Lifting and Rigging Requirements 8.17 KSM-031 Rev 0 – Scaffolding Program 8.18 KSA-106 Rev 1 – Requirements for Protective Coatings for use at Koeberg Nuclear Power Station
Drawings issued by the Employer. The employer will issue drawing to bidders upon the receipt of a signed non-disclosure agreement. Refer to Part C5.4, Annex D for site layouts. Note: Some drawings may contain both Works Information and Site Information. Part C3: Pricing Data C2.3 Vendor-Partner’s Work Information The Vendor-Partner shall provide all equipment brochures that are relevant to the solution proposed.
AutoNDA by SimpleDocs
Drawings issued by the Employer. This is the list of drawings issued by the Employer at or before the Contract Date and which apply to this contract. 0.84/2813 I Process Drainage Piping and Instrumentation Diagram 0.84/11654 5 Process Drains Sump Pumps General Arrangement Drawing 200-7384 F Process Drainage System Power Island System Description
Drawings issued by the Employer. This is the list of drawings issued by the Employer at or before the Contract Date and which apply to this contract. Note: Some drawings may contain both Works Information and Site Information. 0.18/18249 Fence layout 5 0.18/18365 sht. 1 Drainage layout 8 0.18/18365 sht. 2 Drainage alterations gate area 0 0.18/18366 Drainage details 0 0.18/33287 Access control building general arrangement 1 0.18/33572 Water supply and cable sleeve route 0 0.18/33257 sht. 1 Security lighting layout 0 0.18/33257 sht. 2 Security lighting schematic diagram 0 0.18/33257 sht.3 Access control building electrical and aircon installation 0 0.54/7515 sht.1A Access control building plan 0 0.54/7515 sht. 2 Access control building finishes schedule 2 0.54/7515 sht. 3 Access control building window and door schedule 1 0.54/7515 sht. 4 Access control building sanitary xxxx 1 0.54/7515 sht. 5 Access control building panel room access floor 0 0.54/7515 sht. 6 Access control building porch concrete roof slab 0 0.54/7515 sht. 7 Access control building window steel awning 1 0.54/7515 sht. 8 Access control building window burglar bars 0 0.54/7515 sht. 9 Access control building worktop counter 0 0.54/5578 Handrail details 0 0.54/390 sht. 1 Manhole 4 0.54/390 sht. 1A Manhole locking bar 1 0.54/390 sht. 5A Concrete lined gutter inside yard to be re-build 0 0.54/390 sht. 8 Concrete lined gutter outside on south side 5 0.54/390 sht. 13 Headwall and stilling basin 3 0.54/390 sht. 38a1 Concrete road 1 0.54/390 sht. 55 Concrete retaining wall 4 0.54/390 sht. 69 Concrete sump 0 0.54/390 sht. 73 Concrete lined gutter grid inlet 0 0.54/393 C1 – C26 Earthing standards 0.54/4963 sht. 1 to 4 Safety fence 1,0,1,1,0 0.54/8805 Security lighting pole 1 0.53/2129 Fibre optic sleeve and drawbox details 5
Drawings issued by the Employer. This is the list of drawings issued by the Employer at or before the Contract Date and which apply to this contract. Note: Some drawings may contain both Works Information and Site Information. 12225-4-08-4-001 rev 00 Ash dam discharge lines site layout 12225-4-08-4-002 rev 00 Ash dam slurry discharge lines layout 12225-4-08-4-003 rev 00 Ash dam discharge lines cross-over access platform and slopes 4&5 plan view 12225-4-08-4-004 rev 00 Ash dam discharge lines cross-over assembly details 12225-4-08-4-005 rev 00 Ash dam discharge line assembly details at slopes 1 to 5 12225-4-08-4-006 rev 00 Ash dam discharge line pipe assembly details 12225-4-08-4-007 rev 00 Ash dam discharge line bend fabrication details 1 12225-4-08-4-008 2 rev 00 Ash dam discharge line bend fabrication details 2 2225-4-08-4-009 rev 00 Ash dam discharge line bend fabrication details 3 12225-4-08-4-010 rev 00 Ash dam discharge line fabrication details (1)