Building Plan. The Developer has obtained sanctioned and / or approved Plan No. DMC/BP/ CB/ 89 /18, Date 02.03.2019 of the Building/s sanctioned by Durgapur Municipal Corporation (“Building Plan”) for construction of the Project. The Developer shall have the right to change, alter and/or modify the Building Plan if so recommended by the Architect or directed by the authorities concerned or decided by the Developer in the best interest of the Project, but in accordance with law and the approval of authorities concerned, and where such changes are substantial in nature then in only after obtaining consent of the majority of the Xxxxxxx Buildcon Pvt Ltd.
AutoNDA by SimpleDocs
Building Plan. Any Accepted Project, SU Submitted Project, Accepted Integration Project, Unopposed SU Submitted Integration Project, or SU Generation Interconnection to which this Agreement applies will be built and owned in accordance with the following (the “Building Plan”):
Building Plan. Flat Area: M x M Tentative carpet area: SQM Building layout : Annexure - II Details of Flat:- Flat No- Flat Type: Block-C Basic Sale Price of Flat being Rs………………./-In Words (Rupees Only) Against which we have remit herewith a sum of Rs /- in words Rupees.(Rupees ……………………………. Only) Towards Provisional booking / Allotment an unit (Adjustable in basic sale price). I agree to make payment for allottee Flat as per payment schedule Mentioned below:-Payment Schedule :-) PAYMENT PLAN At the time of Booking 10% Plinth Level 5% Ground Floor Slab 5% First Floor Slab 5% Second Floor Slab 5% Third Floor Slab 5% Fourth Floor Slab 5% Fifth Floor Slab 5% Sixth Floor Slab 5% Brick Work 10% Inner Plaster 10% Outer Plaster 10% Colour 10% Flooring 8% At the time of Possession 2% Other Charges will be paid by the allotte at the time of Registry Each Car Parking 1,00,000/- Garden Facing 1,00,000/- Maintenance 1,00,000/- External Electrification Charges 50,000/- Water Charges 25,000/- GST as per actual Registry Charges as per actual Signature/s Agreement and Registry charges (Sale deed exp) with applicable Stamp Duty and fees, Mutation charges, Meter charges, Maintenance charges, Parking Charges, Water Charges, Garden Facing and all applicable taxes of Central Govt./State Govt, and Local body are extra and shall be paid by me. I agree that Builder/Developer/Allotter reserves the right to accept or reject/ revoke and booking/ allotment without giving any reason. Signature Xxxxxxxx XXX Specifications of Flat. Structure : RCC framed structure Walls : Brick masonry with inside outside plaster Flooring : 2*2 vitrified tiles drawing/dining, bedrooms, antiskid tiles in bathroom, balconies and utility/wash area. Doors : flush doors with Hard wood framed door Windows: 3 track powder coated aluminum window with glass. Kitchen: Granite platform with steel sink, glazed tiles upto 2 ft height above platform Plumbing & Sanitation : CPVC pipe and fittings , ceramic tiles upto 7 ft height in toilets Electrification : ISI mark modular electrical switches, wires and Electrical wiring in conclead pvc conduits Water supply: by a tube well/sump well/overhead tank Telephone point in drawing hall Tv point : conclead tv point in drawing and master bedroom Painting:external and internal walls finished by emulsion paint Annexure IV Common amenities of project.: • Underground Sewerage • Electricity NetworkStreet Lights for common areas • Underground water supply line • Landscaped garden • Roads • Water...
Building Plan. The Developer has obtained sanction of the building plan from Gopalpur Gram Panchayat, P.S-Kanksa, District- Burdwan vide Sanction No. BZP/DGP-Divn/79 dated 23 May 2012 (“Building Plan”) for construction of the Project. The Developer shall have the right to change, alter and/or modify the Building Plan if so recommended by the Architect or directed by the authorities concerned or decided by the Developer in the best interest of the Project, but in accordance with law and the approval of authorities concerned, and where such changes are substantial in nature then in only after obtaining consent of the majority of the Greenview Acquirers.
Building Plan. The Developer has obtained sanctioned and / or approved Plan No. 01/2017-2018, Dated 27/04/2017 of the Building/s sanctioned by Jemua Gram Panchayet (“Building Plan”) for construction of the Project. The Developer shall have the right to change, alter and/or modify the Building Plan if so recommended by the Architect or directed by the authorities concerned or decided by the Developer in the best interest of the Project, but in accordance with law and the approval of authorities concerned, and where such changes are substantial in nature then in only after obtaining consent of the majority of the Ashiyana Society Acquirers.
Building Plan. There are commercial entities situated on the ground floor and their total floor area is 760m2. Ceilings are of hollow concrete slabs. The height of the floors is 3 meters with the ceiling height of 2.7m. The load bearing structures are brick walls, hollow slab floors, and prefabricated reinforced concrete belts at each floor. The main carrying structures are 4 longitudinal brick walls that are crossed by 10 transversal brick walls. The wall thickness from the basement to the 8th floor is 40cm. The wall bearing structures of the building are in good condition, without cracks and major damages. The residential building has three entrances and is covered with a flat roof with loft. The loft is constructed of 40cm thick cold weather concrete (base) slabs. Hollow slabs and prefabricated concrete belt. The loft height is 120cm. The roof sloping is arranged with broken pumice and covered with three layers of ruberoid. The attached photos clearly indicate that the building is not of a high artistic-architectural value, right from the beginning. Later in time its appearance has deteriorated further and now it has an unpleasant exterior that can be often seen in Vake-Saburtalo district.
Building Plan. The Developer shall within three (3) months from the planning approval, submit to the local authority for the approval of the complete building plan elevation, section and specification or any amendments thereof for the construction of the development of the Land.