Evaluation Documentation Sample Clauses

Evaluation Documentation. 1. Evaluations required under paragraph A.3 above shall be documented using the appropriate evaluation report form attached hereto as Appendices 5B and 6. Categories entitled “Factors Influencing Teacher Performance Adversely” and “Optional Teacher Comment” on Appendices 5B and 6 may be completed only by the employee. In addition to documenting each employee's performance in each major performance category as set forth in the appropriate evaluation criteria, the evaluator shall rate the overall performance of the employee as satisfactory or unsatisfactory on the evaluation report form. Such overall performance rating shall reflect the evaluator's judgment as to the overall performance of the employee.
AutoNDA by SimpleDocs
Evaluation Documentation. 9.5.1 The evaluation of the unit member shall be reduced to writing, and a copy thereof shall be transmitted to the unit member no later than thirty (30) days before the last school day scheduled on the school calendar adopted by the governing board for the school year.
Evaluation Documentation. All formal evaluations shall be reduced to writing and a copy shall be given to the employee at the evaluation conference. The employee may attach written comments to the written evaluation if the employee wishes. Both the evaluation and the comments of the employee attached thereto shall be placed in the employee's personnel file.
Evaluation Documentation. All evaluations shall be reduced to writing and a copy given to the employee within ten (10) school days of the formal observation. Both the evaluator and the employee shall sign the evaluation at the post observation conference. The employee's signature indicates only that he/she has seen the evaluation. If the employee feels the written evaluation was incomplete or inaccurate, he/she may put the objections in writing which shall be attached to the evaluation placed in his/her personal file. The employee shall be provided a copy of the signed evaluation and all attachments within ten (I0) school days of the post-evaluation conference.
Evaluation Documentation. 1. Evaluations required under paragraph A.3 above shall be documented using the appropriate evaluation report form attached hereto as Appendices 5 and 6. In addition to documenting each employee's performance in each major performance category as set forth in the appropriate evaluation criteria, the evaluator shall rate the overall performance of the employee as satisfactory or unsatisfactory on the evaluation report form. Such overall performance rating shall reflect the evaluator's judgment as to the overall performance of the employee.
Evaluation Documentation. Faculty performance will be evaluated for salary increments, promotion, and tenure according to the General Criteria, above, and specifications outlined in the CBA (section 10.110). It is the responsibility of the individual faculty member under review to submit his/her own IPR and documentation. The individual faculty member under review should specify the review period (CBA 10.210) and his/her request for Normal, Merit, Tenure, and/or Promotion.‌
Evaluation Documentation. At the beginning of each contract year, employees will be given a copy of the evaluation and other evaluation tools to be used that year. Employees will sign that the documents have been received.
AutoNDA by SimpleDocs

Related to Evaluation Documentation

  • Construction Documents The architectural and engineering documents setting forth the design for the Project prepared by the Design Professional. Construction Documents include, but are not limited to, the Specifications, the Drawings, the Supplementary Conditions, the General Conditions, and all Addenda.

  • Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner.

  • Product Documentation You should review the policy documents carefully to ensure they accurately reflect the cover, conditions, limits and other terms that you require. Particular attention should be paid to policy conditions and warranties as failure to comply with these could invalidate your policy. Claims can arise, under certain types of insurance contract, long after the expiry of the policy. It is therefore important that you retain and keep safely all documents associated with your policy.

  • Project Documentation All documentation provided to the City other than Project drawings shall be furnished on a Microsoft compatible compact disc.

  • Supporting Documentation Upon request, the HSP will provide the LHIN with proof of the matters referred to in this Article.

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

  • Statistical Sampling Documentation a. A copy of the printout of the random numbers generated by the “Random Numbers” function of the statistical sampling software used by the IRO.

  • Construction Documents Phase 2.2.1.5. Bidding or Negotiation Phase: 2.2.1.6. Construction Administration Phase

Time is Money Join Law Insider Premium to draft better contracts faster.