Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.
Emergency Mode Operation Plan Contractor must establish a documented plan to enable continuation of critical business processes and protection of the security of electronic County PHI or PI in the event of an emergency. Emergency means any circumstance or situation that causes normal computer operations to become unavailable for use in performing the work required under this Agreement for more than twenty-four (24) hours.
Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.
TREE TRIMMING Grantee or its designee shall have the authority to trim trees on public property at its own expense as may be necessary to protect its wires and facilities.
Emergency Generator 1) During the Term as it applies to the 9449 Expansion Space, as extended from time to time, Tenant shall have the right to install a supplemental emergency generator (the “Generator”) to provide emergency additional electrical capacity to the 9449 Building. The Generator shall be placed at a location at the 9449 Building designated by Tenant and reasonably approved by Landlord. Notwithstanding the foregoing, Tenant’s right to install the Generator shall be subject to: (i) Landlord’s reasonable approval of the manner in which the Generator is installed, the manner in which any cables are run to and from the Generator to the Premises and the measures that will be taken to eliminate any vibrations or sound disturbances from the operation of the Generator; and (ii) the covenants, conditions and restrictions of record applicable to the Project, architectural review and any necessary approval by the local municipality and county governments or agencies having authority and jurisdiction over such matters. Landlord shall have the right to require Tenant to provide a reasonably acceptable enclosure (e.g. wood fencing and landscaping) to hide or disguise the existence of the Generator and to minimize any adverse effect that the installation of the Generator may have on the appearance of the 9449 Building and Project. Tenant shall be solely responsible for obtaining all necessary governmental and regulatory permits and approvals and for the cost of installing, operating, maintaining, repairing and removing the Generator. Tenant shall also be responsible for the cost of all utilities consumed and utility connections required in the operation of the Generator. 2) Tenant shall be responsible for assuring that the installation, maintenance, repair, operation and removal of the Generator does not damage the 9449 Building or Project and Tenant shall be responsible for any damages caused thereby. For avoidance of doubt, the installation, maintenance, operation, repair or removal of the Generator shall be subject to the indemnity provisions set forth in Section 10.3 of the Lease. 3) Tenant shall be responsible for the installation, operation, repair, cleanliness, maintenance and removal of the Generator and appurtenances, all of which shall remain the personal property of Tenant and shall be removed by Tenant at its own expense as of the 9449 Extended Expiration Date or any earlier expiration or termination of Tenant’s right to possession of the 9449 Expansion Space in accordance with the Lease and this Amendment. Tenant shall repair any damage caused by such removal, including the patching of any holes to match, as closely as possible, the color surrounding the area where the Generator and appurtenances were attached. Such maintenance and operation shall be performed in a manner to avoid any unreasonable interference with any other tenants or Landlord. Tenant agrees to maintain the Generator, including without limitation, any enclosure installed around the Generator, in good condition and repair. Tenant shall be responsible for performing any maintenance and improvements to any enclosure surrounding the Generator so as to keep such enclosure in good condition. 4) Tenant, subject to the reasonable rules and regulations enacted by Landlord, shall have unlimited access to the Generator and its surrounding area for the purpose of installing, operating, repairing, maintaining, using and removing the Generator. 5) Tenant shall only test the Generator before or after normal business hours. 6) Notwithstanding anything in this Amendment or the Lease to the contrary, Tenant may use the Generator for its intended purpose as and when needed (as reasonably determined by Tenant), without any restriction or hindrance from Landlord or any other tenant, subject only to applicable Laws and unreasonable disturbances to other tenants in the Project.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.
Mail Order Catalog Warnings In the event that, the Settling Entity prints new catalogs and sells units of the Products via mail order through such catalogs to California consumers or through its customers, the Settling Entity shall provide a warning for each unit of such Product both on the label in accordance with subsection 2.4 above, and in the catalog in a manner that clearly associates the warning with the specific Product being purchased. Any warning provided in a mail order catalog shall be in the same type size or larger than other consumer information conveyed for such Product within the catalog and shall be located on the same display page of the item. The catalog warning may use the Short-Form Warning content described in subsection 2.3(b) if the language provided on the Product label also uses the Short-Form Warning.
Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.
Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.