Lethabo Quality Control Inspectors Sample Clauses

Lethabo Quality Control Inspectors. Quality control inspections will be conducted on behalf of Eskom by a quality inspector from Maintenance Support Services Section. The quality inspector must be authorised by the Power Station Maintenance Manager in terms of LMA10002. The inspections will be carried out to provide an assessment of conformance to specification and quality requirements. These • Inspections do not take any responsibility away from the supervisor or artisan performing the work. • The quality inspector’s responsibilities include the following: • Reviewing maintenance procedures and work instructions and indicating witness and hold points. • Verifying that specified quality requirements have been achieved by inspecting work in progress and indicating acceptance on the quality control plan. • Ensuring that quality control plans conform to the requirements of Lethabo Power Station and that these quality control plans are completed for all valves overhauled. The quality control plan must be made available by the Employer’s Representative prior to commencement of work for review. • Ensuring that acceptable maintenance practice and all relevant codes, standards and statutory requirements are adhered to. • The quality inspector has the authority to stop work where an inadequacy threatens the safety of plant or personnel. It is the responsibility of the person performing the activity to inform the quality inspector prior to reaching a witness or hold point. In the case of a major outage the quality inspector must be informed at least one day in advance. Quality Control and Assurance • The Contractor shall produce and submit a quality control plan (QCP) for approval before work is started. • The QCP shall comply with Employer’s LBQ35005 (QCP requirements). • The QCP shall indicate relevant hold and witness points to be agreed upon by the Employer. Safety, Health and Environment (SHE) Requirements • The Contractor shall comply with Employer’s Health, Safety and Environmental Specification for Contractors (LBA 00067). • The Contractor shall submit the SHE file that shall be audited and approved by the Employer before works commence. • For all SHE file requirements, the Contractor shall refer to annexure F of LBA 00067. • • The Contractor shall provide a safety records to Safety Risk Management for the past two years. • • The Contractor shall submit a sample of an activity based risk assessment with the tender returnables. • The Contractor shall compile and submit the environmental managem...
AutoNDA by SimpleDocs

Related to Lethabo Quality Control Inspectors

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Use; Quality Control a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos.

  • Quality Control A. Controlled Affiliate agrees to use the Licensed Marks and Name only in connection with the licensed services and further agrees to be bound by the conditions regarding quality control shown in attached Exhibit A as they may be amended by BCBSA from time-to-time.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • DEMONSTRATIONS/SAMPLES 9.1 Bidders shall demonstrate the exact item(s) proposed within seven (7) calendar days from receipt of such request from the Owners.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.

  • Data Quality 4.1 Each party ensures that the shared Personal Data is accurate.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

Time is Money Join Law Insider Premium to draft better contracts faster.