Rest and Meal Periods Employees shall be entitled to relief periods during the shift on the basis of fifteen
Meal Periods (a) Meal periods shall be scheduled as close as possible to the middle of the scheduled hours of work. The length of the meal period shall be agreed to at the local level and shall be not less than 30 minutes nor more than 60 minutes. (b) An employee shall be entitled to take their meal period away from the workstation. Where this cannot be done, the meal period shall be considered as time worked.
Meal Period A Contractor shall schedule an unpaid period of not more than 1/2 hour duration at the work location between the 3rd and 5th hour of the scheduled shift. A Contractor may, for efficiency of operation, establish a schedule which coordinates the meal periods of two or more crafts. If an employee is required to work through the meal period, the employee shall be compensated in a manner established in the applicable Schedule A.
Renewal Periods Renewal of registered names may be made in one (1) year increments for up to a maximum of ten (10) years. For the avoidance of doubt, renewal of registered names may not extend their registration period beyond ten (10) years from the time of the renewal.
Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.
Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities (including required control technologies and protection systems) and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer’s Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.
Switching System Hierarchy and Trunking Requirements For purposes of routing PNG traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to PNG, the subtending arrangements between PNG Tandem Switches and PNG End Office Switches shall be the same as the Tandem/End Office subtending arrangements that PNG maintains for the routing of its own or other carriers’ traffic.
Trial Periods Where you take a product or service on a trial basis for a full, reduced or zero charge for a fixed period, unless otherwise advised to you in writing, you need to give us notice in writing if you wish to cancel the Service at the end of the trial. If you fail to give us notice then we will automatically invoice you for the product or service at the end of the trial for the remainder of the agreed contract term (or where there is no agreed term, for a minimum of twelve months). For the avoidance of doubt, unless otherwise agreed in writing you will be liable for all usage charges during the trial period. Should you wish to cancel after the trial then you agree to return, at your own cost, any equipment to us in full working order.
Retention Periods Documentation which serves as evidence of orderly and proper data processing must be retained by ATOSS in accordance with the applicable statutory retention periods beyond the end of the contract. To relieve itself of this obligation, ATOSS may turn said documentation over to the Customer at the end of the contract.
Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.