Meter Hardware Sample Clauses

Meter Hardware. 4.1. A push button for reading the display manually must be provided. As mentioned in Item (3.13). 4.2. The meter shall have the facility to be read even if the power is not present. 4.3. The Non-volatile memory minimum retention time shall not be less than 20 Years which has to be confirmed by an official certificate. And the memory shall be replaceable and compatible with a slot (adapter) provided by supplier, so that the memory can be read externally in case of meter failure or damaging. 4.4. The battery shall be changeable easily (inside sealed cover) and the lifetime shall not be less than 15 years which has to be approved. And the meter shall continue to operate even if the battery is lost for any reasons. The battery should not be used if the meter is connected to power. 4.5. The lifetime of the offered meter has to be not less than (20 years) which has to be confirmed by an official certificate. 4.6. The lifetime of the offered LCD has to be not less than (20 years) which has to be confirmed by official certificate. 4.7. During the meter lifetime it doesn’t require any calibration or maintenance, stability of meter accuracy should be guaranteed. The lifetime of the meter has to be confirmed by an official organization. A certificate to this effect has to be provided. 4.8. The meter shall be equipped with four LED’s: 4.8.1. Active Energy Impulse LED for meter testing, and the meter constant shall be in from of impulse/ KWh. And this LED should have not less than 2 cm from any other LED. 4.8.2. Reactive Energy Impulse LED for meter testing, and the meter constant shall be in from of impulse/ KVARh. And this LED should have not less than 2 cm from any other LED. 4.8.3. Alarm LED: the description is in point 7.0. 4.8.4. Power and Relay LED: the description is in point 10.0. 4.9. The meters shall not generate waves or harmonics which might affect the neighboring electrical instruments or super imposed on power lines and shall not be affected by power failure that may prevent control of the meters. 4.10. The meter shall have a case which provides an ingress protection rating of IP54 in accordance with IEC 60529:1989 with extended terminal cover having rigid and homogeneous thickness without knock out grooves (weak areas) to prevent access to the feeding wires. 4.11. The enclosures of meters should be capable of being easily sealed with lead and two steel wire seals (the seals will supplied and installed by IDECO as per our xxxxxxx with 1mm diameter for e...
AutoNDA by SimpleDocs
Meter Hardware. 3.1. A push button for reading the display manually must be provided. And this list of registers shall be separate from the auto cycle mentioned in Item (2.15). 3.2. The meter shall have the facility to be read even if the power is not present. 3.3. The battery shall be changeable easily (inside sealed cover) and the lifetime shall not be less than 15 years which has to be approved. And the meter shall continue to operate even if the battery is lost for any reasons. The battery should not be used if the meter is connected to power. 3.4. The lifetime of the offered meter has to be not less than (20 years) which has to be confirmed by an official certificate.
Meter Hardware. 4.1. A push button for reading the display manually must be provided. And this list of registers shall be separate from the auto cycle mentioned in Item (3.13). 4.2. The meter shall have the facility to be read even if the power is not present. 4.3. The Non-volatile memory minimum retention time shall not be less than 20 Years which has to be confirmed by an official certificate. And the memory shall be replaceable and compatible with a slot (adapter) provided by supplier, so that the memory can be read externally in case of meter failure or damaging. 4.4. The battery shall be changeable easily (inside sealed cover) and the lifetime shall not be less than 15 years which has to be approved. And the meter shall continue to operate even if the battery is lost for any reasons. The battery should not be used if the meter is connected to power. 4.5. The lifetime of the offered meter has to be not less than (20 years) which has to be confirmed by an official certificate. 4.6. The lifetime of the offered LCD has to be not less than (20 years) which has to be confirmed by official certificate. 4.7. During the meter lifetime it doesn’t require any calibration or maintenance, stability of meter accuracy should be guaranteed. The lifetime of the meter has to be confirmed by an official organization. A certificate to this effect has to be provided. 4.8. The meter shall be equipped with four LED’s: 4.8.1. Active Energy Impulse LED for meter testing, and the meter constant shall be in from of impulse/ KWh. And this LED should have not less than 2 cm from any other LED. 4.8.2. Reactive Energy Impulse LED for meter testing, and the meter constant shall be in from of impulse/ KVARh. And this LED should have not less than 2 cm from any other LED. 4.8.3. Alarm LED: the description is in point 7.0. 4.8.4. Power LED 4.9. The meters shall not generate waves or harmonics which might affect the neighboring electrical instruments or super imposed on power lines and shall not be affected by power failure that may prevent control of the meters. 4.10. The meter shall have a case which provides an ingress protection rating of IP54 in accordance with IEC 60529:1989 with extended terminal cover having rigid and homogeneous thickness without knock out grooves (weak areas) to prevent access to the feeding wires. 4.11. The enclosures of meters should be capable of being easily sealed with lead and two steel wire seals (the seals will supplied and installed by IDECO as per our xxxxxxx with 1...
Meter Hardware. Item Approved Deviation 4.1 4.2 4.3 4.4
Meter Hardware. A push button for reading the display manually must be provided. And this list of registers shall be separate from the auto cycle mentioned in Item (2.15).
Meter Hardware. 3.1. A push button for reading the display manually must be provided. And this list of registers shall be separate from the auto cycle display. 3.2. The meter registers shall have the facility to be read even if the power is not present. 3.3. The battery shall be changeable easily (inside sealed cover) and the lifetime shall not be less than 15 years which has to be approved and the meter shall continue to operate even if the battery is lost for any reasons. The battery should not be used if the meter is connected to power. 3.4. The lifetime of the offered meter has to be not less than (15 years) which has to be confirmed by an official certificate. 3.5. During the meter lifetime it doesn’t require any calibration or maintenance, stability of meter accuracy should be guaranteed. The lifetime of the meter has to be confirmed by an official organization. A certificate to this effect has to be provided. 3.6. The meter shall have a case which provides an ingress protection rating of IP51 in accordance with IEC 60529:1989 with extended terminal cover having rigid and homogeneous thickness without knock out grooves (weak areas) to prevent access to the feeding wires. 3.7. Materials of the main cover of the meter shall be non-transparent color and the terminal cover shall be transparent both cover must be high resistive to fire hazards. It should be of sufficient strength to protect the working parts and to be adequate to protect the meter against mechanical injury. It shall not be affected by chemical materials used for cleaning purposes specially the meter's LCD. The quality of materials should be fully complying with the all tests according to IEC. 3.8. The meter should be of the front-connected type with a hanging device provided and fitted on the base compatible with test rack fixings. 3.9. The equipment in this specification should be capable of accepting any size of conductor in the range
Meter Hardware. Item Priority weight Notes and clarification 4.1 1 4.2 1 4.3 2 Factory Guarantee could be accepted 4.4 2 Factory Guarantee could be accepted 4.5
AutoNDA by SimpleDocs

Related to Meter Hardware

  • Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.

  • Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: xxxxx://xxxxxxx.xxxxxxxx.xxx/guides/signer-guide- signing-system-requirements.

  • Customer Equipment Customer represents and warrants that it owns or has the legal right and authority, and will continue to own or maintain the legal right and authority during the term of this Agreement, to place and use the Customer Equipment as contemplated by this Agreement. Customer further represents and warrants that its placement, arrangement, and use of the Customer Equipment in the Internet Data Centers complies with the Customer Equipment Manufacturer's environmental and other specifications.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Hardware and Software In order to use the Services, you must obtain and maintain, at your expense, compatible hardware and software as specified by Credit Union from time to time. Credit Union is not responsible for any third party software you may need to use the Services. Any such software is accepted by you as is and is subject to the terms and conditions of the software agreement you enter into directly with the third party software provider at time of download and installation.

  • Equipment and Software To use the Mobile Remote Deposit Services, you must obtain and maintain at your expense, compatible equipment and software that we may specify from time to time.

  • Hardware Warranty Company warrants that for a period of one (1) year from delivery of Hardware, Hardware will be free from defects in material and workmanship in normal use, but does not cover any of the following: (i) improper installation, maintenance, adjustment, repair or modification by Customer or a third party; (ii) misuse, neglect, or any other cause other than ordinary use, including without limitation, accidents or acts of God; (iii) improper environment, excessive or inadequate heating or air conditioning, electrical power failures, surges, water damage or other irregularities; (iv) third party software or software drivers; or (v) damage during shipment.

  • Equipment and Materials CONTRACTOR shall provide all equipment, materials, and supplies necessary for the performance on the Agreement except:

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Warranty Work Failure by the Contractor to take corrective action within twenty four (24) hours after personal or telephonic notice by the County's OC Public Works on items affecting essential use of the facility, safety or the preservation of property, and within ten (10) calendar days following written notice on other deficiencies, will result in the County taking whatever corrective action it deems necessary. All costs resulting from such action by the County will be claimed against Contractor or, if necessary, the Contractor's Performance Bond.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!