Permits, Plans, and Specifications Sample Clauses

Permits, Plans, and Specifications. A. Prior to commencing any work within the Franchise Area on any county road or right-of-way, the Grantee shall comply with and obtain all necessary permits to do such work. Permits required may include, but are not limited to, Right-of-Way Use Permits, Approach Permits, Conditional Use Permits, Haul Road Permits and/or any other County, State or Federal Permit required. Refer to the Garfield County Utility Accommodation Policy, Comprehensive Plan and other County Development Regulations for necessary county permitting. Right-of-Way Use permits will require, at a minimum, plans and specifications in duplicate showing: the position, depth, and location of Facilities to be constructed within the Franchise Area at that time and their positions in relation to any involved county road and their locations within the right-of-way. These plans, all drawn to scale, shall be known as the “map of definite location”. Specifications will include class and type of materials and equipment to be used, manner of excavation, construction, installation, and backfill; location of temporary and permanent structures to be erected; description of road facilities which will be disturbed and plans for their restoration; traffic controls; traffic turnouts and detours; road obstructions; and such other details as are required by the County Engineer. To the extent that work is permitted under a then-existing permit issued by the County in connection with the detailed plans and specifications stated above are not required. Grantee shall pay all costs and expenses incurred by the County in reviewing plans and specifications, as and to the extent required by applicable provisions of the Garfield County Utility Accommodation Policy.
AutoNDA by SimpleDocs
Permits, Plans, and Specifications. A. All work performed by Grantee within the Franchise Area in connection with the construction of the Facilities shall be done in accordance with the technical standards set forth in the attached Appendix 2. The following permit requirements will apply to any work performed by Grantee on Facilities within the Franchise Area under this Franchise: Prior to commencing any new construction or major reconstruction work within the Franchise Area, other than maintenance and repairs of existing Facilities within the Franchise Area, Grantee shall apply for and receive a permit to do such work from the County pursuant to the County Utility Policy. Such application will include plans and specifications in duplicate showing: the position, depth, and location of Facilities to be constructed within the Franchise Area at that time and their positions in relation to any involved county road and their locations within the right-of-way. These plans, all drawn to scale, shall be known as the “map of definite location”. Specifications will include class and type of materials and equipment to be used, manner of excavation, construction, installation, and backfill; location of temporary and permanent structures to be erected; description of road facilities which will be disturbed and plans for their restoration; traffic controls; traffic turnouts and detours; road obstructions; and such other details as are required by the County Engineer. Grantee shall pay all reasonable and standard costs and expenses incurred by the County in reviewing plans and specifications, as and to the extent required by applicable provisions of the County Utility Policy. If and to the extent Grantee reasonably determines that action on Grantee's part is necessary to respond to an emergency situation involving Grantee's Facilities within the Franchise Area, and such action would otherwise require the notice specified above, the County hereby waives the requirement that Grantee give such notice as a prerequisite to undertaking such activity; provided, however, Grantee shall notify the County Engineer, verbally or in writing, as soon as practicable and no later than 24 hours following the emergency if the roadway shoulders, embankment or cut slopes, or drainage facilities are disturbed.
Permits, Plans, and Specifications. A. Prior to commencing any work within the Franchise Area on any County road or right-of-way, the Grantee shall comply with and obtain all necessary permits to do such work, including a County encroachment permit. Consent to Use County roads and right-of-way in the Franchise Area will require, at a minimum, plans and specifications showing: the position, depth, and location of Facilities to be constructed within the Franchise Area at that time and their positions in relation to any involved County road and their locations within the right-of-way. These plans, all drawn to scale, shall be known as the “map of definite location”. Specifications will include class and type of materials and equipment to be used, manner of excavation, construction, installation, and backfill; location of temporary and permanent structures to be erected; description of road facilities which will be disturbed and plans for their restoration; traffic controls; traffic turnouts and detours; road obstructions; and such other details as are required by the Director. Grantee shall pay all costs and expenses incurred by the County in reviewing plans and specifications.

Related to Permits, Plans, and Specifications

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents.

Time is Money Join Law Insider Premium to draft better contracts faster.