Post-Construction Monitoring Sample Clauses

Post-Construction Monitoring. Ongoing monitoring of the electricity output and performance is critical to the long-term success of the SfA Program. Subcontractor shall install a monitoring system that will allow DCSEU and DOEE staff and their authorized designees to monitor and analyze the historic and real-time electricity output and performance of each CREF for the Minimum CREF Commercial Operation Period. The monitoring system shall be designed to inform Subcontractor, DCSEU staff, and DOEE staff when a CREF(s) is off- line or when the electricity output is below expectations. The monitoring system capabilities shall include at a minimum the following:
AutoNDA by SimpleDocs
Post-Construction Monitoring. Subcontractor shall provide ongoing monitoring of the PV System output and performance to ensure long-term success of the Project. Subcontractor shall allow access to the DCSEU and DOEE and their authorized designees to the inverter’s monitoring system enabling the monitoring of the real-time performance of the PV System for a minimum of 20 years from the date Subcontractor receives the PTO for the PV System from PEPCO. The monitoring system shall be designed to inform Subcontractor and DCSEU and DOEE staff when the PV System is off-line or when performance is below expectations. The monitoring system capabilities shall include at a minimum the following:
Post-Construction Monitoring. The COUNTY will retain a “permitted sea turtle surveyor” to perform sea turtle monitoring as required by Specific Conditions 14 and 29 the FDEP Permit and the USF&WS Biological Opinions associated with the USACE Permit. The COUNTY will address escarpments and beach tilling for three (3) years after construction per Specific Conditions 16, 17, and 18 of the FDEP Permit. Task 1a – Year 5 (2021) Post Construction Surveys: Per Special Condition 35 of the FDEP Permit, CTC-GEC, via M&E, will perform topographic and bathymetric profile surveys of the beach and offshore area of the Project area in accordance with the approved physical monitoring plan dated October 28, 2013. Profile surveys of the Project area shall include FDEP reference monuments between R-187 (Escambia County) and R-215 (Santa Rosa County) with an additional three (3) intermediate profile surveys which shall be obtained at the general midpoint between each monument from R-208 to R-211 to evaluate changes associated with the Navarre Pier.
Post-Construction Monitoring. 9.8.1 Upon completion of all marine-based construction activities, a post-project monitoring exercise on water quality shall be carried out for 4 weeks in the same manner as the Baseline monitoring. Replicate in-situ measurements and samples collected from each independent sampling event shall be collected to ensure a robust statistically interpretable database. The measurement parameters for Post-construction monitoring shall include DO concentration and saturation, temperature, turbidity, pH, salinity and SS. The measurement shall be taken at all designated monitoring stations including control stations, 3 days per week, at mid-flood (within ± 1.75 hour of the predicted time) and mid-ebb (within ± 1.75 hour of the predicted time) tides, for at least 4 weeks. Since the southern and northern landfalls of TM-CLKL are distant from each other and based on the tentative programme available during the EIA stage the two landfall has different construction time frame, the Post-construction monitoring for each landfalls may conducted separately. The ET should review the actual implantation programme and recommend if a separate post-construction monitoring for each landfall is required.
Post-Construction Monitoring. Once facilities have become operational, or when requested, the Consultant shall provide ongoing monitoring and testing of the effectiveness of the construction project in reducing water pollution and submit reports to the Authority.
Post-Construction Monitoring. After the Project is placed into operation, the Authority will perform at least 12-months of post-construction monitoring (the “Post- Construction Monitoring Period”). The Post-Construction Monitoring Period will start no later than 3 months after the Authority certifies to the EPA and the Purchasers that the project has been placed into operation. The Authority will provide notice to the Purchasers of the conclusion of the Post-Construction Monitoring Period. The results developed during the Post-Construction Monitoring Period will be used by the Authority to determine the actual conditions Runoff and the corresponding Runoff Reduction related to the Project in the same manner and method that the results of the pre-construction monitoring were used by the Authority to determine the runoff qualities for existing conditions.
Post-Construction Monitoring. A post project water quality monitoring exercise should be carried out for four weeks upon completion of marine construction works at Aberdeen Channel, in the same manner as the impact monitoring.
AutoNDA by SimpleDocs

Related to Post-Construction Monitoring

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Post-Construction Phase A. Upon written authorization from Owner during the Post-Construction Phase, Engineer shall:

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Agreement Construction Headings or captions to the provisions of this Agreement are solely for the convenience of the parties, are not part of this Agreement, and shall not be used to interpret or determine the validity of this Agreement. Any ambiguity in this Agreement shall not be construed against the drafter, but rather the terms and provisions hereof shall be given their reasonable interpretation.

  • Special Construction If, after an order is placed, Xxxxxxx finds that third-party special construction services are needed to build, configure or install any additional facilities and/or equipment necessary for Verizon to provide Access service, Verizon will notify the Customer of any such special construction charges. If Customer does not accept the special construction charges, Customer may terminate the order(s) affected by the special construction charges, with no cancellation fee(s).

  • General construction 20.2.1. Binding Nature.............................................. 20.2.2. Entire Agreement............................................ 20.2.3. Governing Law............................................... 20.2.4. Indulgences Not Waivers..................................... 20.2.5. Titles Not to Affect Interpretation......................... 20.2.6.

  • Construction Phase - Administration of the Construction Contract 1.6.1 The Construction Phase shall commence with the acceptance of the Construction Manager’s Guaranteed Maximum Price (or acceptance of a partial Guaranteed Maximum Price for a stage or phase) and issuance of a Notice to Proceed with Construction Services and terminate sixty (60) days after Final Payment to the Contractor is made, or when all of Architect/Engineer’s services have been satisfactorily performed, whichever occurs later.

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen