Post-Installation Inspection Sample Clauses

Post-Installation Inspection. The work activities performed to visually observe CLC 's equipment and cable facilities and equipment installation during and shortly after the completion of the installation of such equipment and facilities to determine that all occupancies conform to the standards required by this Agreement as set forth in Frontier’s Safety Manual.
AutoNDA by SimpleDocs
Post-Installation Inspection. The work activities performed to visually observe Carrier's equipment and cable facilities and equipment installation during and shortly after the completion of the installation of such equipment and facilities to determine that all occupancies conform to the standards required by this Agreement as set forth in Frontier’s Safety Manual.
Post-Installation Inspection. 1. Notify your Utility Representative that the project has been completed and to schedule a post-installation Inspection.
Post-Installation Inspection. Customer provides access to the facility. DNV GL may conduct a post-installation inspection to verify that all measures were correctly installed and meet program specifications. Trade Ally resolves any deficiencies. The Trade Ally will have ten (10) business days to resolve any deficiencies. After ten (10) business days, part of the proposal or the entire proposal may be rejected or cancelled.
Post-Installation Inspection. After the Project Completion Date, and upon reasonable Notice, SDG&E may request that Seller engage an Evaluator to conduct a “Post-Installation Inspection” in order to re-verify that the Project still meets the criteria set forth Section 1.5(b)(i)(A)-(D); provided, the Evaluator must consider the actual energy savings of the Project since the Project Completion Date in determining whether Seller has satisfied Section 1.5(b)(i)(D). The Post-Installation Inspection must be conducted consistent with the Project Measurement and Verification Protocol and the applicable M&V Plan. The selection of any Evaluator under this subsection (i) shall be subject to SDG&E’s consent, which shall not be unreasonably withheld. SDG&E may, but is not obligated to, request up to two (2) Post-Installation Inspections in every calendar year of the Term. Each Post-Installation Inspection must be completed within sixty (60) days of SDG&E’s Notice to perform a Post-Installation Inspection. Seller shall cause the Evaluator to issue a Post-Installation Inspection Report consistent with Exhibit B within [number] [#] days after the completion of the Post-Installation Inspection. Subject to Section 1.5(c)(iv), such report shall be binding on the Parties for purposes of determining whether the criteria set forth in Section 1.5(b)(i)(A)-(D) have been satisfied. If the Post-Installation Inspection Report provides that the Project has not met all of the criteria set forth in Section 1.5(b)(i)(A)-(D), then SDG&E may terminate this Agreement pursuant to Article 7. Within thirty (30) days of receipt of a Post-Installation Inspection Report that provides that the Project has met all of the criteria set forth in Section 1.5(b)(i)(A)-(D), SDG&E shall either (x) provide Notice to Seller that it has accepted the Post-Installation Inspection Report, or (y) provide Notice that, within SDG&E’s reasonable belief, the Post-Installation Inspection Report is materially inaccurate or incomplete, does not properly determine whether the Project meets all of the criteria set forth in Section 1.5(b)(i)(A)-(D), does not provide enough information in support of finding that the Project meets all of the criteria set forth in Section 1.5(b)(i)(A)-(D), indicates that the Post-Installation Inspection Report was not conducted consistent with the Project Measurement and Verification Protocol or applicable M&V Plan, or is materially deficient in any manner whatsoever. If SDG&E provides the Notice under subsection (y), t...
Post-Installation Inspection. Customer provides access to the facility. DNV GL may conduct a post-installation inspection to verify that all measures were correctly installed and meet program specifications. Contractor resolves any deficiencies.
Post-Installation Inspection. Each Acquiring Party shall, within 30 days of installing the Simulator Equipment, contact the Authority to arrange a mutually agreeable time for an Authority representative to visit the Fire Department and observe the Simulator Equipment’s use in a training or testing exercise. If the inspection reveals that the Simulator Equipment is not operational due to malfunction, defect or other cause out of the Acquiring Party’s control, the Authority and Acquiring Party agree to work together to promptly resolve the issue.
AutoNDA by SimpleDocs
Post-Installation Inspection. Properties are subject to a post installation inspection by a CEE staff member when a permit is not required. Where a permit is required, the work must be signed-off by a City inspector prior to release of funds.
Post-Installation Inspection. (a) The Licensee must notify nbn of completion of the installation of the Permitted Equipment as soon as practicable, but in any event, no later than 2 Business Days after completion of the installation.
Post-Installation Inspection. All work and inspections required by BOROUGH to determine and verify that the Attachments have been made in accordance with the respective Approved Attachment Plan and other applicable standards.