Project Installation Sample Clauses
Project Installation a. Explain how and where renovations/upgrades/modifications would take place, or where equipment/systems will be installed
b. Would ground disturbance be required to complete the project or training? ........................... If Yes, provide total extent (depth, length, and width) of each ground- disturbing activity. Include both digging and trenching. For example, light poles and fencing have unique ground-disturbing activities (e.g., six light poles, 24” dia. x 4’ deep; trenching 12” x 500’ x 18" deep; 22 fence posts, 12” diameter x 3’ deep, and 2 gate posts, 18” diameter Yes No
Project Installation. Implementer shall assist Customer and any installation vendors, to ensure Measures are installed according to the Project timeline. Upon Customer's request, Implementer shall provide assistance, including but not limited to, bids, reviewing purchase orders, and securing financing. As a Project is being installed, Implementer shall provide periodic oversight at the Customer facility to ensure all equipment installation meets the design specification and all other Program requirements are being implemented.
Project Installation. Installation of Fibre to the Premise and Service within a designated Project area and within the Project time-frame is the most cost effective. The Customer will accommodate two Time Slots presented to the Customer by EH!tel at EH!tel's sole discretion. The first Time Slot is for the Drop Installation, the second Time Slot is for the Service Installation.
Project Installation a. Explain how and where renovations/upgrades/modifications would take place, or where equipment/systems will be installed:
b. Would ground disturbance be required to complete the project or training? Yes No • If Yes, provide total extent (depth, length, and width) of each ground-disturbing activity. Include both digging and trenching. For example, light poles and fencing have unique ground-disturbing activities (e.g., six light poles, 24" dia. x 4' deep; trenching 12" x 500' x 18" deep; 22 fence posts, 12" diameter x 3' deep, and 2 gate posts, 18" diameter x 3' deep): • If yes, describe the current disturbed condition of the area (e.g., parking lot, road right-of-way, commercial development):
c. Would the equipment use the existing infrastructure for electrical distribution systems? Yes No • If no, describe power source and detail its installation at the site:
Project Installation. Contractor shall assist Customer and any installation vendors, to ensure Measures are installed according to the Project timeline. Upon Customer's request, Contractor shall provide assistance, including but not limited to, bids, reviewing purchase orders, and securing financing. As a Project is being installed, Contractor shall provide periodic oversight at the Customer facility to ensure all equipment installation meets the design specification and all other Program requirements are being implemented.
Project Installation. Contractor agrees to perform the work in accordance with City’s specifications that are attached hereto during the project implementation period specified above. Contractor will be responsible for installing the project according to manufacturer standards and such local standards, if any, as are attached hereto.
Project Installation. Core & Main agrees to do the Work, provide the Services, and furnish the Project Materials and Supplies in accordance with Client’s specifications that are attached to this Installation Contract during the estimated construction period listed above. Core & Main will be responsible for installing the Project according to manufacturer standards and such local standards, if any, as are attached hereto as are described as follows: Neptune Warranty Core & Main will warrant the Project Materials and Supplies, the Work, and any other Services as provided in Section 10 of the Master Agreement. Client may elect to execute a Service Contract with Core & Main for additional maintenance provisions.
Project Installation. Core & Main agrees to perform the Work in accordance with Client’s specifications that are attached hereto during the Project Implementation Period specified above. Core & Main will be responsible for installing the Project according to manufacturer standards and such local standards, if any, as are attached hereto.
Project Installation. 2.1 Party B is responsible to correctly place the equipment, adjust the level and connect the equipment.
2.2 Party B should manufacture and install the supporting and mounting brackets for the installation of process pipelines and the central system pipelines hereunder.
2.3 In accordance with the drawing of process pipelines and central system pipelines, Party B should manufacture and install:
2.3.1 Party B shall connect the steam pipelines to all the equipment using steam from the steam cylinder interfaces in the workshop and condensed water pipelines to the condensed water tank.
2.3.2 Party B shall connect all the compressed-air pipeline to the compressed-air-used equipment after Party A installs such pipelines in the workshop with a length of one meter.
2.3.3 All the pipelines should be installed on the potable water equipment after Party A installs such pipelines in the workshop with a length of one meter.
2.3.4 Party B shall take charge to connect all the softened water pipes to the softened water machines after Party A installs those pipelines into the workshop for one meter
2.3.5 Party B shall connect all the iced water, purified water and circulating water pipelines to the corresponding machines after Party A installs such pipelines in the workshop with a length of one meter.
2.3.6 From the process stage, Party B should connect all process pipelines to all process equipment in the workshop.
2.3.7 From the hot water process, Party B should connect hot water pipelines to the hot water pipelines and equipment.
2.3.8 From the milk collection process, Party B should connect material pipelines to all process equipment.
2.3.9 Party B should be responsible for all unpredictable projects.
2.4 After the installation of all the pipelines, Party B should be responsible for the passivation of the welding joint, cleaning and leak inspection of the stainless steel pipelines.
2.5 Party B should test and adjust the installation of single machine, joint machine, test the equipment with water in lieu of milk as material and overall system adjustment.
Project Installation. Explain how and where renovations/upgrades/modifications would take place, or where equipment/systems will be installed: