Railway Flagger Services Sample Clauses

Railway Flagger Services. 1.05.01 The Contractor must give Railway’s Roadmaster (telephone 000-000-0000) a minimum of thirty (30) calendar days advance notice when flagging services will be required so that the Roadmaster can make appropriate arrangements (i.e., bulletin the flagger’s position). If flagging services are scheduled in advance by the Contractor and it is subsequently determined by the parties hereto that such services are no longer necessary, the Contractor must give the Roadmaster five (5) working days advance notice so that appropriate arrangements can be made to abolish the position pursuant to union requirements. 1.05.02 Unless determined otherwise by Railway’s Project Representative, Railway flagger will be required and furnished when Contractor’s work activities are located over, under and/or within twenty-five (25) feet measured horizontally from centerline of the nearest track and when cranes or similar equipment positioned beyond 25-feet from the track centerline could foul the track in the event of tip over or other catastrophic occurrence, but not limited thereto for the following conditions:
AutoNDA by SimpleDocs
Railway Flagger Services.  1.05.01 The Contractor must give Railway’s Roadmaster Xxxxx Xxxxxxxxxxx at xxxxx.xxxxxxxxxxx@xxxx.xxx and Rail Pros Field Services at xxxxxxxx@xxxxxxxxxx.xxx a minimum of thirty (30) calendar days advance notice when flagging services will be required so that the Roadmaster can make appropriate arrangements (i.e., bulletin the flagger’s position). If flagging services are scheduled in advance by the Contractor and it is subsequently determined by the parties hereto that such services are no longer necessary, the Contractor must give the Roadmaster five (5) working days advance notice so that appropriate arrangements can be made to abolish the position pursuant to union requirements.  1.05.02 Unless determined otherwise by Railway’s Project Representative, Railway flagger will be required and furnished when Contractor’s work activities are located over, under and/or within twenty-five (25) feet measured horizontally from centerline of the nearest track and when cranes or similar equipment positioned beyond 25-feet from the track centerline could foul the track in the event of tip over or other catastrophic occurrence, but not limited thereto for the following conditions:
Railway Flagger Services. A. The Contractor must give Railway’s Roadmaster Xxxx Xxxx (telephone 000-000-0000) a minimum of thirty (30) calendar days advance notice when flagging services will be required so that the Roadmaster can make appropriate arrangements (i.e., bulletin the flagger’s position). If flagging services are scheduled in advance by the Contractor and it is subsequently determined by the parties hereto that such services are no longer necessary, the Contractor must give the Roadmaster five (5) working days advance notice so that appropriate arrangements can be made to abolish the position pursuant to union requirements. B. Unless determined otherwise by Railway’s Project Representative, Railway flagger will be required and furnished when Contractor’s work activities are located over, under and/or within twenty-five (25) feet measured horizontally from centerline of the nearest track and when cranes or similar equipment positioned beyond 25-feet from the track centerline could foul the track in the event of tip over or other catastrophic occurrence, but not limited thereto for the following conditions: i) When, upon inspection by Railway’s Representative, other conditions warrant. ii) When any excavation is performed below the bottom of tie elevation, if, in the opinion of Railway's representative, track or other Railway facilities may be subject to movement or settlement. iii) When work in any way interferes with the safe operation of trains at timetable speeds. iv) When any hazard is presented to Railway track, communications, signal, electrical, or other facilities either due to persons, material, equipment or blasting in the vicinity. v) Special permission must be obtained from the Railway before moving heavy or cumbersome objects or equipment which might result in making the track impassable. C. Flagging services will be performed by qualified Railway flaggers. i) Flagging crew generally consists of one employee. However, additional personnel may be required to protect Railway Property and operations, if deemed necessary by the Railways Representative. ii) Each time a flagger is called, the minimum period for billing will be the eight (8) hour basic day. iii) The cost of flagger services provided by the Railway will be borne by City of Minneapolis. The estimated cost for one (1) flagger is approximately between $1,200.00-$2,000.00 for an eight (8) hour basic day with time and one-half or double time for overtime, rest days and holidays. The estimated cost for ea...
Railway Flagger Services.  1.05.01 The Contractor must give Railway’s Roadmaster Xxxx Xxxxxxx and BNSF’s third party flagging representative Rail Pros Field Services a minimum of thirty (30) calendar days advance notice when flagging services will be required so that the Roadmaster can make appropriate arrangements (i.e., bulletin the flagger’s position). If flagging services are scheduled in advance by the Contractor and it is subsequently determined by the parties hereto that such services are no longer necessary, the Contractor must give the Roadmaster five (5) working days advance notice so that appropriate arrangements can be made to abolish the position pursuant to union requirements.  1.05.02 Unless determined otherwise by Railway’s Project Representative, Railway flagger will be required and furnished when Contractor’s work activities are located over, under and/or within twenty-five (25) feet measured horizontally from centerline of the nearest track and when cranes or similar equipment positioned beyond 25-feet from the track centerline could foul the track in the event of tip over or other catastrophic occurrence, but not limited thereto for the following conditions:
Railway Flagger Services. 1.05.01 The Contractor must give Railway’s Roadmaster (telephone 000-000-0000) a minimum of thirty (30) calendar days advance notice when flagging services will be required so that the Roadmaster can make appropriate arrangements (i.e., bulletin the flagger’s position). If flagging services are scheduled in advance by the Contractor and it is subsequently determined by the parties hereto that such services are no longer necessary, the Contractor must give the Roadmaster five (5) working days advance notice so that appropriate arrangements can be made to abolish the position pursuant to union requirements.
Railway Flagger Services. 1.05.01 The Contractor must give Railway’s Roadmaster Xxxx Xxxxxxxxx and Railway’s contractor (Rail Pros- xxxxxxxx@xxxxxxxxxx.xxx) a minimum of thirty (30) calendar days advance notice when flagging services will be required so that the Roadmaster can make appropriate arrangements (i.e., bulletin the flagger’s position). If flagging services are scheduled in advance by the Contractor and it is subsequently determined by the parties hereto that such services are no longer necessary, the Contractor must give the Roadmaster five (5) working days advance notice so that appropriate arrangements can be made to abolish the position pursuant to union requirements.
Railway Flagger Services.  1.05.01 The Contractor must give Railway’s Roadmaster XXXXXX XXXXXXXXXX at xxxxxx.xxxxxxxxxx@xxxx.xxx and BNSF’s Flagging Contractor- Rail Pros Field Services at xxxxxxxx@xxxxxxxxxx.xxx a minimum of thirty (30) calendar days advance notice when flagging services will be required so that the Roadmaster can make appropriate arrangements (i.e., bulletin the flagger’s position). If flagging services are scheduled in advance by the Contractor and it is subsequently determined by the parties hereto that such services are no longer necessary, the Contractor must give the Roadmaster five (5) working days advance notice so that appropriate arrangements can be made to abolish the position pursuant to union requirements.
AutoNDA by SimpleDocs

Related to Railway Flagger Services

  • Surgery Services This plan covers surgery services to treat a disease or injury when: • the operation is not experimental or investigational, or cosmetic in nature; • the operation is being performed at the appropriate place of service; and • the physician is licensed to perform the surgery. This plan covers reconstructive surgery and procedures when the services are performed to relieve pain, or to correct or improve bodily function that is impaired as a result of: • a birth defect; • an accidental injury; • a disease; or • a previous covered surgical procedure. Functional indications for surgical correction do not include psychological, psychiatric or emotional reasons. This plan covers the procedures listed below to treat functional impairments. • abdominal wall surgery including panniculectomy (other than an abdominoplasty); • blepharoplasty and ptosis repair; • gastric bypass or gastric banding; • nasal reconstruction and septorhinoplasty; • orthognathic surgery including mandibular and maxillary osteotomy; • reduction mammoplasty; • removal of breast implants; • removal or treatment of proliferative vascular lesions and hemangiomas; • treatment of varicose veins; or • gynecomastia.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!