Retrofit Isolation Energy Audit for Option A Verified ECMs. HONEYWELL will provide Option A energy guarantee auditing services as detailed in Attachment D, and Exhibits to Attachment D for specific Energy Conservation Measures (ECMs) identified in Attachment D and/or Exhibits to Attachment D as using Option A methodologies for Measurement and Verification. HONEYWELL will provide this one-time determination of the quantity of energy avoidance of the CUSTOMER’S facility for the First Guarantee Year only. Option A methods will be applied on an ECM specific basis (i.e., isolated to the retrofit) and Energy Cost Avoidance for a Guarantee Year will be quantified and summarized on an ECM basis. After the ECM's potential-to-save has been verified (Section B.1.3) HONEYWELL shall either stipulate the quantity of cost avoidance or determine the cost avoidance from engineering calculations and measurement of specific variables as described in Section D.1.
1.1. Utility bill auditing (Option C) and reconciliation of Option A results to utility meter bill data is not included. The Option A retrofit isolation method was selected by the CUSTOMER to provide an economical reconciliation method and to minimize the interactive effects on the determination of cost avoidance due to changes to the site or facilities from the baseline conditions. HONEYWELL will provide a single (1) reporting submission of the determination of energy avoidance for the First Guarantee Year. The Energy Avoidance quantified in the First Guarantee Year will be stipulated as the annual Energy Avoidance for each Guarantee Year of the remaining contract term. Reporting of Cost Avoidance will occur each year of the term and the monetization of Cost Avoidance will be determined as described in Section D.1.1.1.
Retrofit Isolation Energy Audit for Option A Verified ECMs. HONEYWELL will provide Option A energy guarantee auditing services as detailed in Attachment D, and Exhibits to Attachment D for specific Energy Conservation Measures (ECMs) identified in Attachment D and/or Exhibits to Attachment D as using Option A methodologies for Measurement and Verification. HONEYWELL will provide this one-time determination of the quantity of energy avoidance of the CUSTOMER’S facility for the First Guarantee Year only. Option A methods
Retrofit Isolation Energy Audit for Option A Verified ECMs. HONEYWELL will provide Option A energy guarantee auditing services as detailed in Attachment D, and Exhibits to Attachment D for specific Energy Conservation Measures (ECMs) identified in Attachment D and/or Exhibits to Attachment D as using Option A methodologies for Measurement and Verification. HONEYWELL will provide this one-time determination of the quantity of energy avoidance of the CUSTOMER’S facility for the First Guarantee Year only. Option A methods will be applied on an ECM specific basis (i.e., isolated to the retrofit) and Energy Cost Avoidance for a Guarantee Year will be quantified and summarized on an ECM basis. After the ECM's potential-to-save has been verified (Section B.1.3) HONEYWELL shall either stipulate the quantity of cost avoidance or determine the cost avoidance
Retrofit Isolation Energy Audit for Option A Verified ECMs. Honeywell will provide Retrofit Isolation Methodology (RIM) with Pre and Post Retrofit Measurement energy guarantee auditing services as detailed in Schedule C for specific Conservation Measures (ECMs) identified in Schedule C, as using Option A methodologies for Measurement and Verification. Honeywell will provide this one-time determination of the quantity of energy avoidance of the Customer’s facility for the First Guarantee Year only. RIM methods will be applied on an ECM specific basis (i.e., isolated to the retrofit) and Energy Cost Avoidance for a Guarantee Year will be quantified and summarized on an ECM basis. After the ECM's potential- to-save has been verified Honeywell shall either specify the quantity of cost avoidance or determine the cost avoidance from engineering calculations and measurement of specific variables. Annual verification of potential to perform will be verified by visual inspection or data collection as described in Schedule C. Whole Building Analysis using Utility bill auditing (Option C) and reconciliation of RIM results to utility meter bill data is not included. The RIM was selected by the Customer to provide an economical reconciliation method and to minimize the interactive effects on the determination of cost avoidance due changes to the site or facilities from the baseline conditions. Honeywell will conduct walk-through observations of the ECMs noted under Work Coverage for this section (see below). It will be the responsibility of the Customer to investigate deficiencies beyond the contracted site visit frequency. It will be the responsibility of the Customer to correct the reported deficiencies. The report will be limited to information that can be inferred from non-intrusive observations made during the allotted time for the walk-through observation and from the documents provided by the Customer to Honeywell. During the walk through, Honeywell will:
1. Verify through visual observation that each ECM is still installed.
2. Verify to the limits of visual observation that each ECM is still functional.
3. Record current manual set points and manual settings. Record changes in the operation, control sequences and control set points of the CMs from original installed conditions.
4. Record observations about the current status of the building (i.e. occupancy, use), compare to Customer records, and compare against the contractual baseline and required post-retrofit operating conditions.
5. Record observed addition or delet...