Signal Warrant Analysis Sample Clauses

Signal Warrant Analysis. For any intersections for which an acceptable warrant study is not on file, the Engineer will perform an abbreviated warrant analysis process that makes use of the count data otherwise needed for the project. As a first step, the turning movement count data will be used to develop estimates of the hourly volumes for at least four peak hours. This will be done by applying a factor of 1.25 to the 45-minute volumes (i.e. the two halves of the 90-minute periods actually counted) to approximate the hourly volumes. These volumes will be compared against the criteria for Warrant 2 (Four-Hour Vehicular Volume). Based on experience from the TAP corridors, this method will be adequate to demonstrate that approximately 90 percent of the intersections meet Warrant 2. Warrant 3 (Peak Hour) is to be applied only in unusual cases (office complexes, manufacturing plants, etc.) that attract or discharge large numbers of vehicles over a short time. As applicable, the TMC data will be used to determine whether or not the volume component of Warrant 3 is met. Warrant 8 (Roadway Network) is applicable at the common intersection of two or more major routes. As applicable, the TMC data will be used of determine whether or not the volume component of Warrant 8 is met. This scope does not include additional data collection or analysis to determine whether or not at least one of the other signal warrants are met.
AutoNDA by SimpleDocs
Signal Warrant Analysis. Xxxxxxx Xxxx will prepare a Traffic Signal Warrant Analysis at the subject intersection(s) based upon industry standards and in accordance with requirements of the Approving Agency. [NOTE: For purposes of this proposal, the Approving Agency refers to TxDOT.] Included in this item:  Contact the Approving Agency representative to confirm the specific study parameters and other aspects of the required study.  Collect current traffic volumes on subject roadways sufficient for the study.  Apply appropriate adjustments (if any) to the current traffic volumes to represent anticipated, future conditions with the proposed traffic signal.  Analyze the traffic-volume-related warrants (Warrants 1, 2 and/or 3) from the Texas Manual On Uniform Traffic Control Devices for the subject intersection to determine if the criteria of one or more warrants are satisfied.  As needed, recommend physical modifications to the subject intersection to better facilitate a traffic signal including storage length for left turn lanes. (Recommendations shall be conceptual only and is not considered a detailed design.)  Prepare a Technical Memorandum summarizing the background, analyses, findings, and recommendations of the Traffic Signal Warrant Analysis for submittal to the Approving Agency. 4060 Xxxxxx Xxxxx Road ■ Xxxx Xxxxx, XX 00000-0000 ■ 817.412.7155 ■ xxxx.xxx
Signal Warrant Analysis. It is our understanding that Signal Warrant Analysis is not included in this scope of work. However, if required by TxDOT the Consultant will submit a scope change request to the Client who will secure authorization for this task to be included in this scope of work.
Signal Warrant Analysis. The CONSULTANT shall perform an analysis of an existing unsignalized intersection in order to determine if signal warrants are met and if so, a signal should be installed. This analysis may include geometric and phasing improvements to increase capacity and operational efficiency. Task 4: Roundabout Intersection Analysis The CONSULTANT shall be responsible for determining all input parameters and obtaining all field data for the roundabout analysis. The field review will include identifying any utilities discernible from a ground level view. This may include electrical transmission lines, natural gas pipelines, other utilities (water, wastewater, etc.) correspondent easements, railroads, etc. The review will also document any potential site characteristics that may influence the roundabout feasibility such as adjacent wetlands or other drainage features, parks or historic properties, structures, property access, or other environmental concerns. The CONSULTANT shall perform a cursory geometric screening to review potential impacts based upon the estimated roundabout size. The review will be conducted over scaled aerial photography (rectified) with the intent to highlight any potential issues identifiable in this cursory screening. This could include expected needs for additional Right-of-Way (ROW), possible environmental or utility impacts, expected needs for approach realignments that could impact adjacent properties, etc. These items will be coordinated with appropriate CITY staff to determine possible options to be explored as part of the concept development. The CONSULTANT shall use SIDRA 6 computer software to compare the existing conditions of an intersection to the proposed roundabout alternative. The CONSULTANT should refer to FDOT’s Traffic Analysis Handbook for guidance regarding accepted methodologies and input parameters. The CONSULTANT shall identify the existing operating mode of the intersection and a minimum of three periods will be analyzed (normally the morning, midday and evening peak hours). For existing signalized intersections, the CONSULTANT will obtain existing signal timings from the maintaining agency for use in the analysis. The analysis should include a sensitivity analysis to determine the longevity of the roundabout and its capacity to accommodate future growth. The results of the SIDRA 6 analyses for the existing and proposed roundabout shall be tabulated. The results shall include the delay and queue lengths by approach.
Signal Warrant Analysis. Using the traffic count data Task 1, applicable signal warrant criteria as published in the Indiana Manual on Uniform Traffic Control Devices (IMUTCD) will be evaluated. Based on the general traffic characteristics and surrounding land uses at the study intersections, the analysis will include the following IMUTCD traffic signal warrants: ⚫ Warrant 1 - Eight-Hour Vehicular Volume ⚫ Warrant 2 - Four-Hour Vehicular Volume ⚫ Warrant 3 - Peak Hour ⚫ Warrant 4 - Pedestrian Volume Based on the count data and review of signal warrant criteria, Xxxxxx-Xxxx will identify whether a new traffic signal at the intersection of 600 West and Brookside Parkway is warranted.

Related to Signal Warrant Analysis

  • Project Number The project number has been assigned by the Commission as the unique identifier for your project, and it cannot be changed. The project number should appear on each page of the grant agreement preparation documents to prevent errors during its handling.

  • Value Engineering The Supplier may prepare, at its own cost, a value engineering proposal at any time during the performance of the contract. The value engineering proposal shall, at a minimum, include the following;

  • TECHNICAL EVALUATION (a) Detailed technical evaluation shall be carried out by Purchase Committee pursuant to conditions in the tender document to determine the substantial responsiveness of each tender. For this clause, the substantially responsive bid is one that conforms to all the eligibility and terms and condition of the tender without any material deviation. The Institute’s determination of bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence. The Institute shall evaluate the technical bids also to determine whether they are complete, whether required sureties have been furnished, whether the documents have been properly signed and whether the bids are in order.

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Geotechnical Engineer « »« » « » « » « » « »

  • General Warranty Contractor warrants that all services, deliverables, and/or work product under this Contract shall be completed in a workmanlike manner consistent with standards in the trade, profession, or industry; shall conform to or exceed the specifications set forth in the incorporated attachments; and shall be fit for ordinary use, of good quality, with no material defects.

  • Data Analysis In the meeting, the analysis that has led the College President to conclude that a reduction- in-force in the FSA at that College may be necessary will be shared. The analysis will include but is not limited to the following: ● Relationship of the FSA to the mission, vision, values, and strategic plan of the College and district ● External requirement for the services provided by the FSA such as accreditation or intergovernmental agreements ● Annual instructional load (as applicable) ● Percentage of annual instructional load taught by Residential Faculty (as applicable) ● Fall 45th-day FTSE inclusive of dual enrollment ● Number of Residential Faculty teaching/working in the FSA ● Number of Residential Faculty whose primary FSA is the FSA being analyzed ● Revenue trends over five years for the FSA including but not limited to tuition and fees ● Expenditure trends over five years for the FSA including but not limited to personnel and capital ● Account balances for any fees accounts within the FSA ● Cost/benefit analysis of reducing all non-Residential Faculty plus one Residential Faculty within the FSA ● An explanation of the problem that reducing the number of faculty in the FSA would solve ● The list of potential Residential Faculty that are at risk of layoff as determined by the Vice Chancellor of Human Resources ● Other relevant information, as requested

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!