Work Package Sample Clauses

Work Package. 6.5.1 The Work Packages shall be in accordance with Appendices A1-A2 and shall set out the specifications and special requests concerning the Services, and shall include, among others the following items:
AutoNDA by SimpleDocs
Work Package is a deliverable at the lowest level of the WBS, and may be divided into activities and used to identify and control work flows in the organization. Article 2
Work Package. Please describe your confidence that the total remaining Work Package funds per cost category are sufficient to complete the Work Package activities. For example, do you expect to incur new or unplanned costs in order to complete the Work Package activities.
Work Package. 2 According to RB DG and UIC 719R, the embankment/excavated surface soils are categorized into four different soil quality classes (QS classes) as described in Table 2. These soil quality classes have an impact on the actions taken during the designing and construction phase. Based on the embankment soil quality class, a prepared subgrade layer (with QS3 soil quality class) shall be constructed on top of the embankment/excavated surface with a given thickness to achieve necessary bearing capacity class P3 for the railway. The aim of Work Package 2 is to calculate necessary prepared subgrade thicknesses for each of the embankment/excavated soil quality class and propose feasible technical solutions how to improve QS0 and QS1 soils with “high plasticity and fines content more than 15%”.
Work Package. 4.1.1 As a material consideration for entering into this Agreement, DB Contractor hereby commits, and TxDOT is relying upon DB Contractor’s commitment, to develop the Project in accordance with the time periods set forth in this Agreement. Except where this Agreement expressly provides for an extension of time, the time limitations set forth in the Contract Documents for DB Contractor’s performance of its covenants, conditions and obligations are of the essence, and DB Contractor waives any right at law or in equity to tender or complete performance beyond the applicable time period, or to require TxDOT to accept such performance.
Work Package. 1 First part of the Work Package 1 consists of assessing the properties of aggregates produced in Latvia based on the requirements stated in the RB DG (see Annex A), UIC 719R and this document (see Table 1 and Annex B). For this purpose, sampling and testing must be carried out by the Consultant in Latvia. Only active quarries in Latvia with appropriate and valid Certificate of Factory Production Control (FPC) 2 Definitions “the Tenderer” and “the Consultant” are considered as equal in terms of their meaning. shall be included in the Study. The quarries must provide most recent Declaration of Performance (DoP) or Declaration of Conformity (DoC) for the material(s) which shall be included to this Study. The Study shall include suitable quarries within a range of 60 km from the Rail Baltica corridor in Latvia. This range can be extended only if appropriate quarries don’t exist within the aforementioned range.
Work Package. 3: Enhancements of Vulnerability Assessment techniques
AutoNDA by SimpleDocs
Work Package. 4 tools TL-W4-01: WP4 CAA prototype integration. - Develop / deploy tools for the formats conversion between proprietary formats and the TO. - Deploy the tools. - Test the tools integration. TL-W4-02: WP4 CAA integration. - Develop / deploy tools for the formats conversion between proprietary formats and the TO. - Deploy the tools. - Test the tools integration. TL-W4-03: WP4 PoS modules integration. - Develop / deploy tools for the formats conversion between proprietary formats and the TO. - Deploy the tools. - Test the tools integration.
Work Package. 5 tools TL-W5-01: WP5 aligners. - Develop / deploy tools for the formats conversion between proprietary formats and the TO. - Deploy the tools. - Test the tools integration. TL-W5-02: WP5 Bilingual Dictionary Extractor integration. - Develop / deploy tools for the formats conversion between proprietary formats and the TO. - Deploy the tools. - Test the tools integration. TL-W5-03: WP5 Transfer Grammar Extractor. - Develop / deploy tools for the formats conversion between proprietary formats and the TO. - Deploy the tools. - Test the tools integration.
Time is Money Join Law Insider Premium to draft better contracts faster.