Accelerated Operable Unit 1 (AOU Sample Clauses

Accelerated Operable Unit 1 (AOU. 1) AOU-1 contains the ESS located within the East Bench area of Salt Lake City. The springs and seeps are an expression of groundwater that surfaces along the Wasatch Fault (Figure 2). The investigation and remedial approach to AOU-1 has focused on defining and mitigating vapor intrusion arising from shallow groundwater contamination in this area to ensure that public health risks are minimized while the long-term planning and investigation process for the site are ongoing. AOU - 1 is within Sections 4, 5, 8, and 9, Township 1 South, Range 1 East, of the Salt Lake Base Meridian. The area is located in the residential Xxxx Xxxxxxx, Xxxx Xxxxxxx Xxxx, Xxxxxxxxx and Gilmer Park neighborhoods on the Xxxx Xxxxx xx Xxxx Xxxx Xxxx, XX (see Fig. 3). AOU - 1 boundary is tentatively defined between 800 South and Michigan Avenue and 1100 East and 1300 East. The general topography slopes to the west with an average elevation of 4,520 feet above mean sea level (USGS, 1975). A portion of the Wasatch Fault is located in AOU - 1; it is a normal fault because the displacement is mostly vertical with the mountain block (Wasatch Range) moving upward relative to the adjacent downward-moving valley block (UOS, 1996). Red Butte Creek is located to the south of AOU-1 and runs to the west towards Liberty Park Pond. The goal of AOU - 1 remedial investigation (RI) is to identify the potential for, and if necessary, mitigate vapor intrusion, early in the Site’s remedial investigation process using removal action authority to address individual locations, if necessary The AOU - 1 Remedial Investigation Work Plan (RIWP) focuses on indoor air; groundwater and surface water characterization within and adjacent to the ESS and providing data for assessment of the human health risk posed by exposure to the contaminated groundwater and vapors that originate from the contaminated groundwater. An environmental risk screening is also done at any habitat location sampled during the RI. The RIWP includes all required plans (Health and Safety Plan, Sampling Analysis Plan, Quality Assurance Project Plan, Risk Assessment Work Plan, etc.) needed to support evaluation of the potential for vapor intrusion in residences, businesses, and schools. AOU - 1 field work commenced in late Fall 2014/Early Winter 2015 with interviews of property owners who volunteered during the March and September 2014 public meetings. The initial phase of indoor air and soil gas sampling commenced in early January 2015 and wa...
AutoNDA by SimpleDocs

Related to Accelerated Operable Unit 1 (AOU

  • CLEC OUTAGE For a problem limited to one CLEC (or a building with multiple CLECs), BellSouth has several options available for restoring service quickly. For those CLECs that have agreements with other CLECs, BellSouth can immediately start directing traffic to a provisional CLEC for completion. This alternative is dependent upon BellSouth having concurrence from the affected CLECs. Whether or not the affected CLECs have requested a traffic transfer to another CLEC will not impact BellSouth's resolve to re-establish traffic to the original destination as quickly as possible.

  • Network Resource Interconnection Service (check if selected)

  • PROPANE GAS SYSTEM SERVICE AREA If the Property is located in a propane gas system service area owned by a distribution system retailer, Seller must give Buyer written notice as required by §141.010, Texas Utilities Code. An addendum containing the notice approved by TREC or required by the parties should be used.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Shipping must be Freight On Board Destination to the delivery location designated on the Customer purchase order The Contractor will retain title and control of all goods until delivery is completed and the Customer has accepted the delivery. All risk of transportation and all related charges are the responsibility of the Contractor. The Customer will notify the Contractor and H-GAC promptly of any damaged goods and will assist the Contractor in arranging for inspection. The Contractor must file all claims for visible or concealed damage. Unless otherwise stated in the Agreement, deliveries must consist only of new and unused merchandise.

  • OUTCOME IF GRANTEE CANNOT COMPLETE REQUIRED PERFORMANCE Unless otherwise specified in this Statement of Work, if Grantee cannot complete or otherwise comply with a requirement included in this Statement of Work, HHSC, at its sole discretion, may impose remedies or sanctions outlined under Contract Attachment C, Local Mental Health Authority Special Conditions, Section 7.09 (Remedies and Sanctions).

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 550 MW.

  • NASPO ValuePoint eMarket Center a. In July 2011, NASPO ValuePoint entered into a multi-year agreement with SciQuest, Inc. whereby SciQuest will provide certain electronic catalog hosting and management services to enable eligible NASPO ValuePoint’s customers to access a central online website to view and/or shop the goods and services available from existing NASPO ValuePoint Cooperative Contracts. The central online website is referred to as the NASPO ValuePoint eMarket Center.

Time is Money Join Law Insider Premium to draft better contracts faster.