Construction Clarifications Sample Clauses

Construction Clarifications. Respond in writing to Contractor’s Request for Information (RFI) regarding design documents during the 8-month construction period. A total of 15 RFI responses have been included in this task. MC shall issue interpretations and clarifications of the Contract Documents, along with associated support materials, as requested by the Contractor. Those interpretations will be rendered and a response prepared and submitted to the Contractor within 3 to 5 working days.
AutoNDA by SimpleDocs
Construction Clarifications. (Please consider the following in reviewing our proposal) ➢ No cost for hidden damages or unseen decay is included in this proposal. ➢ Our cost includes all labor, material, supervision, profit and overhead to complete the scopes of work as specified. ➢ Material costs are subject to change based on current market rate at the time of purchase. ➢ Any additional costs will be addressed during contract negotiations. ➢ Special inspections if required have not been considered for proposal. ➢ No cost has been included for any additional engineering and or architectural design and plans. ➢ We have excluded cost for soil testing or compaction of any soils. Western Valley Construction a division Of X. Xxxxxx & Xxxxxx Enterprises, Inc. is not responsible for design. ➢ Engineering, drawings, plans, permits, processing, plan check, design and code upgrades are not included in this proposal but are reimbursable costs if needed. ➢ Due to the nature of the project we will use reasonable care around the existing landscaping of common areas. We have not included costs for landscaping repairs. Existing landscaping, i.e.; shrubs, trees, etc., will need to be cut back prior to start of project by others. Abatement of hazardous materials (e.g. asbestos, mold, lead), if necessary, has not been included in this proposal. ➢ The Contractor is not responsible for temporary housing, the removal and put back of any satellite dishes, cable, phone lines, blinds, furniture, any owner added devices or personal items, and the moving of personal property in order to perform the task necessary to complete the scope of work. ➢ We are not responsible for broken or faulty door bells or doorbell buttons.

Related to Construction Clarifications

  • Construction Activities Please list all major construction activities, both planned and completed, to be performed by Seller or the EPC Contractor. Activity EPC Contractor / Subcontractor Completion Date __/__/____ (expected / actual) __/__/____ (expected / actual)

  • Construction Safety Prior to contract award, the successful bidder must provide a Certificate of Recognition or Letter of Good Standing issued by an occupational health and safety organization approved by the Workers’ Compensation Board of Nova Scotia.

  • Construction Change Directive A written order prepared and issued by the District, the Construction Manager, and/or the Architect and signed by the District and the Architect, directing a change in the Work.

  • Clarifications It is the Bidder’s responsibility to become familiar with and fully informed regarding the terms, conditions and specifications of this Invitation for Bids. Lack of understanding and/or misinterpretation of any portions of this Invitation for Bids shall not be cause for withdrawal of your bid after opening or for subsequent protest of award. Bidder’s must contact the Procurement Division, at the phone number on the bid cover sheet prior to bid opening, should clarification be required. Modification or alteration of the documents contained in the solicitation or contract shall only be valid if mutually agreed to in writing by the Bidder and the County.

  • Construction Plans Tenant shall prepare final plans and specifications for the Tenant Improvements that (a) are consistent with and are logical evolutions of the Approved Schematic Plans and (b) incorporate any other Tenant-requested (and Landlord-approved) Changes (as defined below). As soon as such final plans and specifications ("Construction Plans") are completed, Tenant shall deliver the same to Landlord for Landlord's approval, which approval shall not be unreasonably withheld, conditioned or delayed. All such Construction Plans shall be submitted by Tenant to Landlord in electronic .pdf, CADD and full-size hard copy formats, and shall be approved or disapproved by Landlord within ten (10) business days after delivery to Landlord. Landlord's failure to respond within such ten (10) business day period shall be deemed approval by Landlord. If the Construction Plans are disapproved by Landlord, then Landlord shall notify Tenant in writing of its objections to such Construction Plans, and the parties shall confer and negotiate in good faith to reach agreement on the Construction Plans. Promptly after the Construction Plans are approved by Landlord and Tenant, two (2) copies of such Construction Plans shall be initialed and dated by Landlord and Tenant, and Tenant shall promptly submit such Construction Plans to all appropriate Governmental Authorities for approval. The Construction Plans so approved, and all change orders approved (to the extent required) by Landlord, are referred to herein as the "Approved Plans."

  • Construction Change Directives 7.3.1 A Construction Change Directive is written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting accordingly.

  • Construction Work The regulation at 41 C.F.R. § 60-1.3 defines “construction work” as the construction, rehabilitation, alteration, conversion, extension, demolition or repair of buildings, highways, or other changes or improvements to real property, including facilities providing utility services. The term also includes the supervision, inspection, and other onsite functions incidental to the actual construction.

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Construction Sequencing In general, the sequence of the proposed dates of Initial Operation of Interconnection Customers seeking interconnection to the Transmission System will determine the sequence of construction of Network Upgrades.