Differentials No evening or night differentials will be applicable for a person on flexible scheduling concepts unless some or all of the hours he/she works would have fallen within the differential period of 7:00 p.m. to 7:00 a.m. had the person not been on a flexible scheduling concept.
Differential Differential is a salary allowance in addition to the basic rate or schedule based upon additional skills, responsibilities, hours of employment, or distasteful or hazardous work.
Bilingual Differential When formally assigned in the employee’s position description, an employee assigned to interpret to or from another language to English will receive a differential of five percent (5%) of base pay.
Leadwork Differential (a) Leadwork differential shall be defined as a differential for employees who have been formally assigned by their supervisor in writing, “leadwork” duties for ten (10) consecutive calendar days (or the equivalent thereof for alternate or flexible schedules) or longer provided the leadwork or team leader duties are not included in the classification specification for the employee’s position. Leadwork is where, on a recurring daily basis, the employee has been directed to perform substantially all of the following functions: to orient new employees, if appropriate; assign and reassign tasks to accomplish prescribed work efficiently; give direction to workers concerning work procedures; transmit established standards of performance to workers; review work of employees for conformance to standards; and provide informal assessment of workers’ performance to the supervisor.
ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.
Shiftwork 38.1 Shift Penalties (Excluding Home Care Classifications)
Scaling “Scaling,” as used herein, involves:
Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.
ROAD TOLERANCES Purchaser shall perform road work within the tolerances listed below. The tolerance class for each road is listed on the TYPICAL SECTION SHEET. Tolerance Class A B C Road and Subgrade Width (feet) +1.5 +1.5 +2.0 Subgrade Elevation (feet +/-) 0.5 1.0 2.0 Centerline alignment (feet lt./rt.) 1.0 1.5 3.0 1-6 ORDER OF PRECEDENCE Any conflict or inconsistency in the road plan will be resolved by giving the documents precedence in the following order:
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.