The Drainage and Erosion Control clause establishes requirements for managing water runoff and preventing soil erosion on a property. Typically, it outlines the responsibilities of parties—such as property owners or contractors—to install and maintain appropriate drainage systems, like gutters, swales, or retaining walls, and to implement measures that minimize soil displacement during and after construction. This clause ensures that water is properly directed away from structures and neighboring properties, thereby reducing the risk of property damage, environmental harm, and disputes related to water flow or erosion.
Drainage and Erosion Control a. Cross-drainage devices should be installed to:
i. Reduce water movement in ditches.
ii. To help prevent sedimentation into streams, divert water from the ditch into the surrounding forest.
iii. Provide cross-movement spillways or down-spouts where the drainage occurs on unstable or bare soil.
b. A variety of erosion control methods may be used, including geotextiles, mulches, spreading slash, straw ▇▇▇▇▇ and re-vegetating. The height of any erosion control devices should not exceed the top edge of the ditch.
c. A grass seed mix, approved by The Ministry of Environment and made up of native species, should be used for erosion control where needed along ditches and stream crossings.
Drainage and Erosion Control. WORK TO BE DONE: Construct sedimentation and erosion control measures and appurtenances. The works are to be performed in accordance with the engineering drawings prepared by ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Engineering Ltd. bearing Town File No. SD-580. SPECIFICATIONS: All work is to be performed in accordance with the latest revised Town of Oakville Standard Drawings and Specifications as of the date of the agreement. Siltation Control $ 71,820.00 15% Contingency and Engineering $ 10,773.00 TOTAL OWNER’S ESTIMATED COST $ 82,593.00 WORK TO BE DONE: All fencing, grading, sodding, seeding, planting and pathway works as shown on the plans prepared by ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇ SPECIFICATIONS: All work is to be performed according to the latest Town of Oakville Standard Drawings and Specifications as of the date of the agreement. ESTIMATED TOTAL COST $ 2,049,397.50 LESS: Estimated Cost of Works to be done on behalf of the Town pursuant to Schedule “K” Village Square (.274 ha. @ $1,404,510.00/ha) $ 385,000.00 NHS Core Trails (380 m @ $664.67/m) $ 175,000.00 ▇▇▇▇▇▇▇’▇ Creek Rehabilitation (.18 ha @ $353,353.00/ha) $ 490,000.00 TOTAL COST OF WORKS ON BEHALF OF TOWN $ $1,050,000.00 OWNER’S COST: Street Trees $ 378,900.00 Rear Lot Acoustic Fencing $ 74,850.00 Walkway Blocks 385 & 386 Landscaping $ 32,300.00 SWM Pond Landscaping $ 285,600.00 Sub Total $ 771,650.00 15% Contingency and Landscape Architect $ 115,747.50 The owner will provide to the Town postponements of any outstanding encumbrances in favour of the Subdivision Agreement with the Town. The owner shall dedicate the following lands free of charge and with clear title (free and clear of encumbrances) and any necessary easements. A Certificate of Title shall be provided, in a form satisfactory to the Town, Region or other authority: Words indicating proposed uses in this schedule are intended to be descriptive only and are not intended to limit the use of the land in the hands of the Town. All Block numbers refer to the latest draft “M” plan filed with the Town unless otherwise indicated.
Drainage and Erosion Control. WORK TO BE DONE: Construct storm sewers, catchbasins, and other appurtenances. The works are to be performed in accordance with the engineering drawings prepared by ▇▇▇▇/Detech Group Corporation bearing Town File SD573 SPECIFICATIONS: All work is to be performed in accordance with the latest revised Town of Oakville Standard Drawings and Specifications as of the date of the Agreement. Siltation controls $ 3,600.00 15% Contingency and Engineering $ 540.00 All fencing, grading, sodding, seeding, planting and pathway works as shown on the plans prepared by Strybos SPECIFICATIONS: All work is to be performed according to the latest Town of Oakville Standard Drawings and Specifications as of the date of the agreement. LESS: Estimated Cost of Works to be done on behalf of the Town pursuant to Schedule “K” Rear Lot Chain Link Fencing (125 lm) $ 8,750.00 OWNER’S COST: Naturalization of Open Space and Park Block $ 100,000.00 15% Contingency and Landscape Architect $ 15,000.00 The Owner will provide to the Town postponements of any outstanding encumbrances in favour of this Subdivision Agreement with the Town prior to registration of the Plan. The Owner shall dedicate the following lands free of charge and with clear title (free and clear of encumbrances) and any necessary easements. A Certificate of Title shall be provided, in a form satisfactory to the Town, Region or other authority:
Drainage and Erosion Control. If drainage pipes are located on a Lot, the owner of said Lot shall be responsible to keep such unclogged, free-flowing and in good condition. The owner's builder must sign an agreement to abide by the erosion control rule as set forth by the Indiana Department of Environmental Management and applicable county and local rules and ordinances. In particular, the rule requires that erosion control practices be used during development and construction that will minimize soil erosion and sediment-laden water from flowing from the building sites and it requires the streets to be kept free of transported soil from the building site. As required, the erosion control plan for the Subdivision has been submitted to the ▇▇▇▇▇▇▇ County Soil and Water Conservation District. One (1) part of the plan pertaining to individual l ots requires that prior to the start of construction, a rock driveway must be installed and entrance to the building site for all deliveries and workers should be over the driveway. To minimize sediment-laden water from being discharged into the streets and drainage ways, sand bags, straw ▇▇▇▇▇ and silt fences shall be used on all individual building sites. No owner nor builder shall be permitted to disturb the vegetation on any adjoining building site for any reason, and shall be held fully responsible for any loss or damage resulting therefrom. In connection with the foregoing, by accepting transfer of ownership of a Lot, the owner recognizes that Developer has no responsibility for erosion control and indemnifies Developer from any loss or damage that Developer may suffer by reason of the breach by the owner of erosion control responsibilities as herein set forth and under applicable law.
Drainage and Erosion Control. The Harvest Contractor will drain all snig tracks and major road access after harvest completion in accordance with Queensland’s Vegetation Management ▇▇▇ ▇▇▇▇, as amended, and Forest Practices Code. All associated costs of drainage will be borne by the Harvest Contractor.
Drainage and Erosion Control. WORK TO BE DONE: Construct siltation controls and drainage and erosion control works. The works are to be performed in accordance with the engineering drawings prepared by ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇ Limited., bearing Town File SD400.8 (Phase 8). SPECIFICATIONS: All work is to be performed in accordance with the latest revised Town of Oakville Standard Drawings and Specifications as of the date of the Agreement. Siltation controls $ 27,350.00 15% Contingency and Engineering $ 4,102.50 TOTAL ESTIMATED COST: $ 31,452.50 SPECIFICATIONS: All work is to be performed according to the latest Town of Oakville Standard Drawings and Specifications. Boulevard topsoil & sod $ 11,925.00 Park Works (Part 6): Sidewalk $ 4,800.00 Fine Grading $ 5,700.00 Topsoil & Sod $ 2,565.00 15% Contingency and Engineering $ 3,748.50 Words indicating proposed uses in this schedule are intended to be descriptive only and are not intended to limit the use of the land in the hands of the Town. All ‘part’ numbers refer to the latest draft R-Plan prepared by MMM Geomatics Ontario Limited, Ontario Land Surveyors, (Drawing Number ▇▇-▇▇-▇▇▇-▇▇▇) filed with the Town unless otherwise indicated.
Drainage and Erosion Control. A. Installed and maintain sediment trapping system.
B. Discharge surface runoff from any disturbances to the site into silt containment basins. Siltation prevention measures utilizing haybale and geotextile fences for containment shall be taken before discharge to drainage systems.
C. Provide additional work if necessary to control erosion and siltation throughout the duration of construction activities.
Drainage and Erosion Control. The PDBT shall maintain drainage within and through the work areas. Earth dams will not be permitted in paved areas. Temporary dams of sandbags, asphaltic concrete or other acceptable material will be permitted when necessary to protect the Work, provided their use does not create a hazard or nuisance to the public. Such dams shall be removed from the site as soon as their use is no longer necessary.
Drainage and Erosion Control a. Cross-drainage devices should be installed to:
i. Reduce water movement in ditches.
ii. To help prevent sedimentation into streams, divert water from the ditch into the surrounding forest.
iii. Provide cross-movement spillways or down-spouts where the drainage occurs on unstable or bare soil.
b. A variety of erosion control methods may be used, including geotextiles, mulches, spreading slash, straw ▇▇▇▇▇ and re-vegetating. The height of any erosion control devices should not exceed the top edge of the ditch.
Drainage and Erosion Control. WORK TO BE DONE: Construct siltation controls and drainage and erosion control works. The works are to be performed in accordance with the engineering drawings prepared by ▇. ▇▇▇▇▇▇▇▇▇ & Associates bearing Town File SD-530.3. SPECIFICATIONS: All work is to be performed in accordance with the latest revised Town of Oakville Standard Drawings and Specifications as of the date of the Agreement. Siltation controls $ 25,000.00 15% Contingency and Engineering $ 3,750.00 TOTAL ESTIMATED COST: $ 28,750.00 WORK TO BE DONE All grading, sodding and planting, as shown on plans prepared by Cosburn Nauboris Ltd.