EXCAVATION AND BACKFILL Sample Clauses

EXCAVATION AND BACKFILL. A. All excavations must be conducted in compliance with applicable law and regulations and, regardless of depth, must be shored when within the zone of influence from the railroad loading, or when necessary to protect structures, facilities, or personnel. Shoring for excavations must comply with SCRRA “Excavation Support Guidelines.” Any excavations, holes or trenches on SCRRA right-of-way must be covered, guarded and protected when work is not actively prosecuted. When leaving work site areas at night and over weekends, the areas must be secured and left in a condition that will ensure that SCRRA employees and other personnel who may be working or passing through the area are protected from all hazards. All excavations must be backfilled as quickly as practicable. B. The Contractor shall submit a plan showing the limits of all excavations within the Right-of-Way of SCRRA, and the method of support when support is required. The Contractor shall not make any excavations on SCRRA right-of-way, or within the zone of railroad load influence as defined in Figure 2-1 of SCRRA “Excavation Support Guidelines”, until the Contractor's excavation plan, its plans and calculations for the support of the excavation, and SSWP are approved in writing by SCRRA. C. Open excavation areas shall be protected per OSHA regulations and by walkways with handrails no closer than 8 feet 6 inches horizontally from the centerline of the nearest operating track, if tangent, and 9 feet 6 inches if the track is curved. Furthermore, the walkways shall be no less than 3 feet wide, and the handrails shall be no less than 3.5 feet high and capable of withstanding 250 pounds of lateral force. D. The Contractor must cease all work and notify SCRRA immediately before continuing excavation in the area if obstructions are encountered which do not appear on drawings. If the obstruction is a utility and the owner of the utility can be identified, then the Contractor must also notify the utility owner immediately. The Contractor shall not perform any work if there is any doubt about the location of underground cables or lines of any kind until the exact location of the underground facilities has been determined. There will be no exceptions to these requirements. E. The Contractor shall compact all backfill within SCRRA Right-of-Way to a minimum of 90 percent of maximum standard density in accordance with AASHTO T-99 or ASTM D-698. Where it becomes necessary to excavate beyond the normal lines of exc...
AutoNDA by SimpleDocs
EXCAVATION AND BACKFILL. Do all trenching, excavating and backfilling required for the Mechanical Sections. Include all necessary repairing, shoring, bracing, pumping and protection for safety of persons and property. Repairing shall be comparable to work cut and shall be approved by the proper authorities.
EXCAVATION AND BACKFILL. A. The Contractor shall do all necessary trenching and backfilling required for the proper installation of the system. Only mainlines will be installed with trenches. All pipe 2-1/2" and smaller shall be installed using the "pulling method". B. The Contractor shall use backfilling equipment and techniques that will tamp the backfill in such a manner that no settling will result. C. Trench bottoms and backfill material will be free from rock or stones over 1/2 inch in diameter, clodded dirt, or other unsuitable substances to prevent damage to pipe during backfill operation. The trench bottom is to be smooth and where rock or other debris is encountered, over excavation of 6 inches is required and suitable material will be used to form an adequate pipe bed. D. Backfilling of trenches containing plastic pipe shall be done when the pipe is cool to avoid excessive contraction in cold weather. All pipe embedment material should be selected and placed carefully, avoiding stones (over 1/2" in size), frozen lumps, and debris. Sharp stones and crushed rock larger than 3/4 inch which could cause significant scratching or abrasion of the pipe, should be excluded from the embedment material. E. Contractor shall perform all boring, cutting, removal, and/or repair of pavement, where pipes must be installed across existing roads, paths, walkways or other pavement. Such work shall be coordinated with the owner and/or governmental agencies to minimize time of close for any road, walkway, etc. Where cart path crossings are required, contractor shall cut and remove pavement and provide a temporary gravel repair until Contractor is able to pave prior to finalization of project.
EXCAVATION AND BACKFILL. Contractor shall do all excavation and trenching necessary to complete the work included in'this section of the Specifications. Trenching and backfilling shall to Section of the Standard icat-ions.-
EXCAVATION AND BACKFILL. A. Comply with IOWA URBAN STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS, Sections 2010, 3010, and 3020, except as modified herein. B. Excavate all materials encountered to depth indicated or specified; comply with OSHA safety rules and other state and federal government regulations. C. Pile excavated material suitable for backfill in an orderly manner sufficient distance back from edge of excavation to avoid slides or cave-ins; 2' minimum clear distance. D. Remove excavated material not suitable for backfill; waste at disposal area approved by Engineer; removal is incidental to construction. E. Where new work crosses existing utilities or utility services, excavate in advance of pipe laying; determine crossing arrangement including exact construction line and grade. F. Storm Sewer: Type R-2 pipe embedment per SUDAS detail 3010.102 is required for all RCP storm sewer pipes within roadway right-of-way, including pipes beneath pavement. G. Sanitary Sewer: Type F-3 pipe embedment per SUDAS detail 3010.103 is required for all sanitary sewers. I. Compact backfill with pneumatic or mechanical tampers adjacent to or within 12" over pipe. Rollers or vibrating plate compactors may be used after sufficient backfill has been placed to assure that such equipment will not damage or disturb the pipe.

Related to EXCAVATION AND BACKFILL

  • Excavation If an excavation shall be made upon land adjacent to the Leased Premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the Leased Premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which the Leased Premises form a part from injury or damage and to support the same by proper foundation, without any claim for damages or indemnity from Landlord, or diminution or abatement of Rent.

  • Demolition The Lessor shall remove existing abandoned electric, telephone, and data cabling and devices, as well as any other improvements or fixtures in place, to accommodate the Government’s requirements. Any demolition of existing improvements that is necessary to satisfy the Government’s layout shall be done at the Lessor’s expense.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Vaccination and Inoculation ‌ (a) The Employer agrees to take all reasonable precautions to limit the spread of infectious diseases among employees, including in-service seminars for employees. Where the Employer or Occupational Health and Safety Committee identifies high risk areas which expose employees to infectious or communicable diseases for which there are protective immunizations available, such immunizations shall be provided at no cost to the employee. The Committee may consult with the Medical Health Officer. Where the Medical Health Officer identifies such a risk, the immunization shall also be provided at no cost. The Employer shall provide Hepatitis B vaccine, free of charge, to those employees who may be exposed to bodily fluids or other sources of infection. (b) An employee may be required by the Employer, at the request of and at the expense of the Employer, to take a medical examination by a physician of the employee's choice. Employees may be required to take skin tests, x-ray examination, vaccination, and other immunization (with the exception of a rubella vaccination when the employee is of the opinion that a pregnancy is possible), unless the employee's physician has advised in writing that such a procedure may have an adverse effect on the employee's health.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When Southern Telecom or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port. 3.8.2 An unloaded 2-wire copper Loop must serve the End User. The meet point for the Voice CLEC and the Data LEC is the point of termination on the MDF for the Data LEC's cable and pairs. 3.8.3 The foregoing procedures are applicable to migration to Line Splitting Service from a UNE-P arrangement, BellSouth Retail Voice Service, BellSouth High Frequency Spectrum (CO Based) Line Sharing. 3.8.4 For other migration scenarios to line splitting, BellSouth will work cooperatively with CLECs to develop methods and procedures to develop a process whereby a Voice CLEC and a Data LEC may provide services over the same Loop.

  • CONSTRUCTION AND RENOVATION Construction and renovation projects for a state, local, territorial, or Tribal government’s principal Emergency Operations Center (EOC) as defined by the State Administrative Agency are allowable under the EMPG Program. Written approval must be provided by FEMA prior to the use of any EMPG Program funds for construction or renovation. Requests for EMPG Program funds for construction of an EOC must be accompanied by an EOC Investment Justification (located in the Related Documents tab of the EMPG xxxxxx.xxx posting) to their Regional EMPG Manager for review. Additionally, recipients are required to submit a SF-424C Form and Budget detail citing the project costs. When applying for funds to construct communication towers Sub-Recipients must submit evidence that the Federal Communication Commission’s (FCC) Section 106 review process has been completed and submit all documentation resulting from that review to Grants Program Directorate (GPD) prior to submitting materials for EHP review. Sub-Recipients are also encouraged to have completed as many steps as possible for a successful EHP review in support of their proposal for funding (e.g., coordination with their State Historic Preservation Office to identify potential historic preservation issues and to discuss the potential for project effects, compliance with all state and EHP laws and requirements). Projects for which the Sub-Recipient believes an Environmental Assessment (EA) may be needed, as defined in as defined in DHS Instruction Manual 023-01-001-01, Revision 01, FEMA Directive 108-1 and FEMA Instruction 108-1-1, must also be identified to the FEMA EMPG Regional Program Manager within six months of the award, and completed EHP review materials must be submitted no later than 12 months before the end of the period of performance. EHP review packets should be sent to xxxxxxxxxx@xxxx.xxx. EMPG Program Sub-Recipients using funds for construction projects must comply with the Xxxxx-Xxxxx Act (40 U.S.C. §§ 3141 et seq.). Grant Sub-Recipients must ensure that their contractors or subcontractors for construction projects pay workers no less than the prevailing wages for laborers and mechanics employed on projects of a character similar to the contract work in the civil subdivision of the state in which the work is to be performed. Additional information regarding compliance with the Xxxxx- Xxxxx Act, including Department of Labor (DOL) wage determinations, is available from the following website: xxxxx://xxx.xxx.xxx/whd/govcontracts/dbra.htm In general, Sub-Recipients should consult with their Grant Manager prior to making any investment that does not clearly meet the allowable expense criteria established in this Guidance.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Procurement of the Site (i) The Authority Representative, the Contractor and Authority’s Engineer shall, within 10 (ten) days of the date of this Agreement, inspect the Site and prepare a detailed memorandum containing an inventory of the Site including the vacant and unencumbered land, buildings, structures, road works, trees and any other immovable property on or attached to the Site (hereinafter referred to as the “Handover Memorandum”). Subject to the provisions of Clause 8.2 (iii), the Handover Memorandum shall have appended thereto an appendix (the “Appendix”) specifying in reasonable detail those parts of the Site to which vacant access and Right of Way has not been given to the Contractor along with details of hindrances in the Construction Zone. For sake of clarity the Handover Memorandum shall clearly specify the parts of Site where work can be executed. Signing of the Handover Memorandum, in three counterparts (each of which shall constitute an original), by the authorized representatives of the Authority, Contractor and Authority’s Engineer shall be deemed to constitute a valid evidence of giving the Right of Way to the Contractor for discharging its obligations under and in accordance with the provisions of this Agreement and for no other purpose whatsoever. (ii) Whenever the Authority is ready to hand over any part or parts of the Site included in the Appendix, it shall inform the Contractor, by notice, of the proposed date and time such of hand over. The Authority Representative and the Contractor shall, on the date so notified, inspect the specified parts of the Site, and prepare a memorandum containing an inventory of the vacant and unencumbered land, buildings, structures, road works, trees and any other immovable property on or attached to the Site so handed over. The signing of the memorandum, in three (3) counterparts (each of which shall constitute an original), by the authorised representatives of the Parties shall be deemed to constitute a valid evidence of giving the relevant Right of Way to the Contractor. If the contractor fails to join for site inspection or disputes the parts of the site available for work, the Authority’s Engineer shall decide the parts of the site where work can be executed and notify to both the parties within 3 days of the proposed date of inspection. The parties agree that such notification of the Authority’s Engineer as mentioned hereinabove shall be final and binding on the parties. (iii) The Authority shall provide the Right of Way to the Contractor in respect of all land included in the Appendix by the date specified in Schedule-A for those parts of the Site referred to therein, and in the event of delay for any reason other than Force Majeure or breach of this Agreement by the Contractor, it shall pay to the Contractor, Damages in a sum calculated in accordance with Clause 8.3. The Contractor agrees that it shall not be entitled to claim any other damages on account of any such delay by the Authority. (iv) Notwithstanding anything to the contrary contained in this Clause 8.2, the Authority shall specify the parts of the Site, if any, for which Right of Way shall be provided to the Contractor on the dates specified in Schedule-A. Such parts shall also be included in the Appendix prepared in pursuance of Clause 8.2 (i). (v) The Authority further acknowledges and agrees that prior to the Appointed Date, it shall have procured issuance of the statutory notification under Applicable Laws for vesting of all the land comprising the Project in the Authority and has taken possession of area for Construction Zone for at least 90% (ninety per cent) of the total length of the Project Highway. The Parties also acknowledge and agree that the conditions specified in this Clause 8.2 (iii) shall not be modified or waived by either Party. (vi) For the avoidance of doubt, the Parties expressly agree that the Appendix shall in no event contain sections of the Project Highway the cumulative length of which exceeds 10% (ten percent) of the total length of the Project Highway. (vii) Pursuant to signing of Handover Memorandum under clause 8.2 (i), Contractor shall submit to the Authority’s Engineer, a monthly land possession report till expiry of 180 (one hundred and eighty) days from Appointed Date, in respect of those parts of the site to which vacant access and right of way was not given to the contractor and included in Appendix to the memorandum signed under clause 8.2 (i), duly specifying the part of the site, if any, for which the right of way is yet to be handed over.

  • Removal of Improvements Grantor shall not demolish or remove any Improvements from the Real Property without Lender's prior written consent. As a condition to the removal of any Improvements, Lender may require Grantor to make arrangements satisfactory to Lender to replace such Improvements with Improvements of at least equal value.