MACHINERY OPERATION Clause Samples

POPULAR SAMPLE Copied 1 times
MACHINERY OPERATION. The Tenant will not, without the written consent of the Landlord, use any apparatus, machinery, or equipment or device in, on or about the Premises which may cause any excessive noise or may set up any excessive vibration or excessive floor loads or which in any way would increase the normal amount of electricity agreed to be furnished or supplied under this Lease, or as specified in the Building Standards Criteria, and further, the Tenant shall not connect with water any apparatus, machinery, equipment or device, other than an office type coffee maker, without the prior written consent of the Landlord, which consent shall not be unreasonably withheld. The Tenant shall, at the Tenant's sole cost and expense, comply with all of the requirements of all municipal, state and federal authorities now or hereafter in force, pertaining to said Premises, and shall faithfully observe in the use of said Premises and Property all municipal ordinances and regulations and state and federal statutes and regulations now or hereafter in force and effect.
MACHINERY OPERATION. All Power Shovels, Backhoes, Draglines, Clamshells and Cranes used in work covered by this Agreement where such machinery is rated by the manufacturer as having a capacity of one cubic (1) yard or over, or over twenty (20) ton lifting capacity, Autograde, 3*Formless Curb and Gutter Machine 36 inches in width and over, Roto Mill Grinder, Slip-Form Paver, Concrete Paver 27E and over, Central Mix Plants, Asphalt Plants, Batch Plants and Trenching Machine 30 inches and over, shall require an Engineer and Oiler (Apprentice), regardless of motive power, and/or mode of control. All Lattice Boom Cranes originally manufactured after 1990 shall require an Engineer and an Oiler or Apprentice. All Lattice Boom Cranes originally manufactured prior to 1990 with an original lifting capacity of under 20 tons, shall require an Engineer, but shall not require an Oiler or Apprentice. All Lattice Boom Cranes 20 tons and under manufactured prior to 1990, the Engineer shall receive one-half (½) hour grease time. If another person is required on any of the above cranes, it shall be a member of the bargaining unit. Hydraulic Machines other than Front-end Loaders that are designed to use bucket attachments of various sizes and the manufacturer rates such machine as weighing over one hundred fifteen thousand (115,000) pounds shall require an Oiler. Machines that do not require an Oiler pursuant to the above, shall be subject to preparation time pursuant to Section 1(A) of this Article, with the exception of Combination Backhoe Front-end Loader machine. Non-Lattice Boom Truck Cranes having three (3) axles or less shall not require an Oiler. All Non-Lattice Boom Truck Cranes having four (4) axles or more, including dolly (dolly shall count as an axle) shall require an Engineer and Oiler, except as heretofore limited. In the event machines of a new make, model, design, weight or capacity become available and a dispute arises in regard to the application of the foregoing, a committee comprised of an equal number of representatives of the Union and the Association signatory herein shall meet and based on available information and the manufacturers specifications issue a majority decision. In the event a majority decision cannot be reached, the dispute shall be processed pursuant to the Grievance and Arbitration Article of this Agreement.
MACHINERY OPERATION. The Tenant will not, without the written consent of the Landlord, use any apparatus, machinery, equipment or devices in, on or about the Premises which may cause, alone or in the aggregate, any excessive noise or may set up any excessive vibration or excessive floor loads or which in any way would increase the normal amount of electricity agreed to be furnished or supplied under this Lease, or as specified in the Building Standards Criteria, and further, the Tenant shall not connect with water any apparatus, machinery, equipment or device without the prior written consent of the Landlord. The Tenant shall, at the Tenants sole cost and expense, comply with all requirements of municipal, state and federal authorities now or hereafter in force, pertaining to said Premises, and shall faithfully observe in the use of said Premises and Property such laws, ordinances, regulations and other requirements now or hereafter in force and effect
MACHINERY OPERATION. To ensure the safety of employees and damage to equipment, the Company shall ensure that machinery and equipment shall be operated only by duly personnel who have been properly instructed in its’ safe operation.
MACHINERY OPERATION. (a) All Power Shovels, Draglines, Clamshells and Cranes used on work covered by this Agreement where such machinery is rated by the manufacturer as having a capacity of over one and one-quarter (1-1/4) cubic yards or Truck Cranes rated by the manufacturers as having a capacity of over thirty (30) ton, Crawler Cranes rated by the manufacturer as having a capacity of thirty five (35) tons or over, Hammerhead Cranes and Trenching Machines thirty (30) inches or over shall require an Engineer and Oiler or Apprentice regardless of motive power. (b) All hydraulic type cranes used on work covered by this Agreement where such crane is rated by the manufacturer as having a capacity of fifty (50) tons or more shall require an Engineer and Oiler or Apprentice regardless of motive power.
MACHINERY OPERATION. Tenant will not, without the prior written consent of Landlord, use any apparatus, machinery, equipment, appliance or device in, on or about the Premises which may cause any excessive noise or sounds or any excessive vibration or excessive floor loads or which disturb the quiet and peaceful enjoyment of other tenants or which in any way would increase the normal amount of utilities agreed to be furnished or supplied under this Lease, and further, Tenant shall not connect any apparatus, machinery, equipment, appliance or other device without the prior written consent of Landlord.
MACHINERY OPERATION. All Power Shovels, Cable Backhoes, Cable Draglines, Cable Clamshells and Cranes used in work covered by this Agreement where such machinery is rated by the manufacturer as having a capacity of one (1) cubic yard or over, or over twenty (20) ton lifting capacity, Autograde, 4Formless Curb and Gutter Machine thirty-six inches (36”) in width and over, Roto Mill Grinder thirty-six inches (36”) in width and over, Slip-Form Paver, Concrete Paver 27E and over, Central Mix Plants, Asphalt Plants, Batch Plants and Trenching machine thirty inches (30”) and over, shall require an engineer and oiler (Apprentice), regardless of motive power. All Hydraulic Cherry Picker and Telescopic Crawler Crane type machines under twelve (12) ton lifting capacity shall not be subject to preparation time. All Hydraulic Cherry Picker and Telescopic Crawler Crane type machines of twelve (12) ton lifting capacity to a gross vehicle weight up to one hundred ten thousand (110,000) pounds shall be subject to preparation time.
MACHINERY OPERATION. LEAVE OF ABSENCE ARTICLE Section ARTICLE ARTICLE ARTICLE JOB HEALTH &SAFETY STATUTORY ARTICLE ARTICLE ARTICLE