Non-Circular Roundabout Configuration Validation Sample Clauses

Non-Circular Roundabout Configuration Validation. Task 1 Site Visit with Survey
AutoNDA by SimpleDocs
Non-Circular Roundabout Configuration Validation. Task 1 Site Visit with Survey Subtotal Hours: 4.0 4.0 4.0 4.0 16.0 Task 2 Roundabout Geometric Design 1 Roundabout Concept Design 2.0 8.0 24.0 40.0 74.0 2 Stakeholder Coordination 2.0 2.0 2.0 2.0 8.0 3 Preliminary Lighting 2.0 8.0 24.0 34.0 4 Preliminary Signing 2.0 4.0 16.0 22.0 5 Technical Memorandum 2.0 2.0 2.0 8.0 14.0 6 Roundabout Geometric Revisions 3.0 3.0 24.0 24.0 54.0 Subtotal Hours: 9.0 19.0 64.0 114.0 206.0 Total Phase Hours: 13.0 23.0 68.0 118.0 222.0 Total Phase Direct Labor: $912.60 $1,198.53 $3,598.56 $4,925.32 $10,635.01 Phase 6 30% Design Task 1 Roadway 1 Horizontal Layout 8.0 40.0 40.0 88.0 2 Vertical Layout 2.0 4.0 24.0 24.0 54.0 3 Technical Memorandum 4.0 4.0 16.0 24.0 Job #: 23-000742 File Name: 23-000742_FEE_20240610.xlsm Xxxxxxx Xxxx Xxx Xxxxxxxx Xxxx Xxxxxxxx Xxx Xxxx Xxxxxx Xxxxx Xxxx Xxxx Xxxxx Xxxxxx Xxxxxxx Xxx Phase & Phase & Task Title Task No. Principal E4 Engineer Senior Technician E3 Engineer Senior Project Manager Senior Planner P4 Planner Project Accountant Total Direct Labor Hours & Cost Subtotal Hours: 2.0 16.0 68.0 80.0 166.0 Task 2 Stormwater 1 Basin Analysis 2.0 2.0 16.0 20.0 2 Modeling 2.0 2.0 16.0 20.0 3 Layout 2.0 24.0 26.0 4 Draft Stormwater Site Plan 2.0 2.0 16.0 20.0 Subtotal Hours: 6.0 8.0 72.0 86.0 Task 3 Preliminary Channelization and Signing 1 Channelization and Signing 2.0 8.0 16.0 26.0 Subtotal Hours: 2.0 8.0 16.0 26.0 Task 4 30% Plans 1 30% Plans X Cover Sheet (1) 2.0 4.0 6.0 X Design Baseline Horizontal Control Plan (4) 2.0 4.0 10.0 16.0 X Roadway Sections (3) 2.0 2.0 8.0 12.0 X Roadway/Stormwater Plan and Profile (12) 2.0 8.0 34.0 44.0 X Pvaing Plans (12) 2.0 8.0 28.0 38.0 X Pavement Markings (12) 2.0 8.0 28.0 38.0 X Illumination sheets (6) 2.0 4.0 16.0 22.0 Subtotal Hours: 14.0 34.0 128.0 176.0 Task 5 30% Cost Estimate 1 30% Cost Estimate 4.0 8.0 16.0 28.0 Subtotal Hours: 4.0 8.0 16.0 28.0 Task 6 30% Specifications 1 List of all nonstandard itmes 1.0 1.0 4.0 6.0 Subtotal Hours: 1.0 1.0 4.0 6.0 Task 7 Basis of Design Report 1 Draft Basis for Design Report 2.0 4.0 4.0 8.0 18.0 2 Draft Maximum Extent Feasible (MEF) documentation 2.0 2.0 4.0 8.0 16.0 Subtotal Hours: 4.0 6.0 8.0 16.0 34.0 Total Phase Hours: 12.0 51.0 127.0 332.0 522.0 Total Phase Direct Labor: $842.40 $2,657.61 $6,720.84 $13,857.68 $24,078.53 Phase 7 Environmental Permitting Task 1 SEPA Checklist Compliance 1 Site Visit 4.0 4.0 2 Draft SEPA Checklist 4.0 32.0 36.0 Subtotal Hours: 8.0 52.0 60.0 Task 5 Permitting 1 NPDES Permit 4.0 2.0 6.0 ...

Related to Non-Circular Roundabout Configuration Validation

  • Scope of Work For the 2022/2023 Grant Period, the Provider will maintain a victim services program that will be available to provide direct services to victims of crime who are identified by the Provider or are presented to the Provider, as specified in the Provider’s 2022/2023 Grant Application as approved by the OAG and incorporated herein by reference.

  • Training a. The employer, in consultation with the local, shall be responsible for developing and implementing an ongoing harassment and sexual harassment awareness program for all employees. Where a program currently exists and meets the criteria listed in this agreement, such a program shall be deemed to satisfy the provisions of this article. This awareness program shall initially be for all employees and shall be scheduled at least once annually for all new employees to attend.

  • Scope of Services The specific scope of work for each job shall be determined in advance and in writing between TIPS Member, Member’s design professionals and Vendor. It is permitted for the TIPS Member to provide a general scope description, but the awarded vendor should provide a written scope of work, and if applicable, according to the TIPS Member’s design Professional as part of the proposal. Once the scope of the job is agreed to, the TIPS Member will issue a PO and/or an Agreement or Contract with the Job Order Contract Proposal referenced or as an attachment along with bond and any other special provisions agreed by the TIPS Member. If special terms and conditions other than those covered within this solicitation and awarded Agreements are required, they will be attached to the PO and/or an Agreement or Contract and shall take precedence over those in this base TIPS Vendor Agreement.

  • Safety Where an employee is prevented from working at the employee’s particular function as a result of unsafe conditions caused by the inclement weather, the employee may be transferred to other work in the employee’s classification on site, until the unsafe conditions are rectified. Where such alternative is not available and until the unsafe conditions are rectified, the employee shall remain on site. The employee shall be paid for such time without reduction of the employees’ inclement weather entitlement.

  • HOURS OF WORK i) Where employees are now working a longer daily tour, the provisions set out in this Article governing the regular hours of work on a daily tour shall be adjusted accordingly.

  • GRIEVANCE PROCEDURE 7.01 For purposes of this Agreement, a grievance is defined as a difference arising between the parties relating to the interpretation, application, administration or alleged violation of the Agreement including any question as to whether a matter is arbitrable.

  • Modification This Agreement shall not be changed, modified, terminated, or discharged, in whole or in part, except by an instrument in writing signed by both parties hereto, or their respective successors or assignees.

  • Services FASC agrees to provide to the Adviser the services indicated in Exhibit A to this Agreement (the “Services”).

  • Introduction The Texas Health and Human Services Commission ("HHSC") and the Contractor named in Section I (HHSC and Contractor may be referenced in this document collectively as the “Parties” and individually as the “Party") hereby enter into this Community Services Contract - Provider Agreement (the “Contract”) for the provision of services under the Contract type specified in Section I for the considerations set forth herein. The Contract Begin Date specified in Section I is not valid until this Contract is signed by both parties.

  • Subcontracting 6.1 The Grantee is responsible for the performance of its obligations under this Agreement, including in relation to any tasks undertaken by subcontractors.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!