Prepare Final Contract Documents Sample Clauses

Prepare Final Contract Documents. Address and incorporate comments from 90% design review into the final contract documents ready for bidding. Contract documents will include bidding requirements, contract forms, conditions of the contract, general requirements and technical specifications. The Consultant shall submit the final bid ready contract documents, including construction drawings and detailed specifications bearing the seal of the appropriate professional engineers, to the City for use in building permits and the construction bidding phase. Prepare a revised engineer’s opinion of cost and project schedule. Task Deliverables
AutoNDA by SimpleDocs
Prepare Final Contract Documents. Based on input received at review meeting, prepare the final (100%) contract documents (i.e., drawings and technical specification) and cost estimate. Conduct a 100% completion stage project peer review to provide QA/QC of the final contract documents and cost estimate prior to submittal. The review will include final interdisciplinary checks, general coordination and constructability issues. Furnish four (4) sets of the final (100%) contract documents and opinion of probable construction cost for the bid package. Approximately two weeks after delivery of the final (100%) contract documents schedule a final review meeting so that any changes that may be necessary to meet the project's budgetary requirements can be incorporated. This does not include out of scope changes outside of the recommendations identified in the final preliminary design memorandum. The purpose of the meeting is to collect City input on the 100% complete contract documents. Meeting minutes will be prepared and distributed to summarize discussions of the meeting. Comments received from City during review of the 100% complete contract documents review meeting will be incorporated and a final version of the contract documents will be prepared. Ten (10) copies 100% complete contract documents will be submitted to the City.
Prepare Final Contract Documents. Prepare complete set of biddable contract documents and final engineer’s opinion of probable construction costs. Revisions will be substantially based upon comments and recommendations provided by NapaSan for the 100% submittal. GHD will meet with NapaSan to review the 100% submittal and receive NapaSan’s 100% submittal review comments. Timing for this meeting will be determined near the completion of the 100% submittal documents. This scope of services does not include any submittals subsequent to the Final Submittal.

Related to Prepare Final Contract Documents

  • Construction Contract Documents The Construction Contract Documents shall consist of the plans and specifications prepared by the Engineer, and any addenda and change orders thereto, and the Owner-Contractor Agreement, all of which shall be compatible and consistent with this Agreement.

  • Contract Documents The contract documents shall consist of the following:

  • THE CONTRACT DOCUMENTS The Contract Documents consist of the State-Contractor Agreement, the Conditions of the Contract (General, Supplementary and other Conditions), the Drawings, the Specifications, and all Addenda issued prior to bid opening and any Change Orders after execution of the Contract.

  • REVIEW OF CONTRACT DOCUMENTS 4.2.1 The Contractor shall carefully study and compare the Contract Documents and shall immediately report in writing to the Architect and the State any error, inconsistency or omission he may discover. The Contractor shall not be liable to the State or the Architect for any damage resulting from any such errors, inconsistencies or omissions in the Contract Documents. The Contractor shall perform no portion of the Work at any time without Contract Documents or, where required, approved Shop Drawings, Product Data or Samples for such portion of the Work.

  • INTENT OF CONTRACT DOCUMENTS 1.1. It is the intent of the Contract Documents to describe a functionally complete Project (or portion thereof) to be constructed in accordance with the Contract Documents. Any work, materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for. When words which have a well-known technical or trade meaning are used to describe Work, materials or equipment, such words shall be interpreted in accordance with that meaning. Reference to standard specifications, manuals or codes of any technical society, organization or association or to the Laws or Regulations of any governmental authority having jurisdiction over the Project, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, Law or Regulation in effect at the time the Work is performed, except as may be otherwise specifically stated herein.

  • Construction Schedules Construction Manager shall incorporate the relevant portions of the Project Schedule, into its Construction Schedules. Construction Manager shall include with its Estimated Contract Sum preliminary Construction Schedules for Owner Parties’ review. After Owner approves the Project budget, Construction Manager shall update and distribute with the Progress Report its approved Construction Schedules throughout the duration of the Work. Each such updated Construction Schedule shall conform to the Contract Documents’ requirements and shall accurately reflect progress and remaining estimated durations of applicable Work.

  • Project contract 1. For each approved project a project contract shall be concluded between the Programme Operator and the Project Promoter.

  • Project Documents In addition to any other pertinent and necessary Project documents, the following documents shall be used in the development of the Project: