OPINION OF PROBABLE CONSTRUCTION COSTS Sample Clauses

OPINION OF PROBABLE CONSTRUCTION COSTS. 5.1 The Engineer’s opinion of probable construction costs, if the provision of which is included in its scope of Services, represents its judgment as a professional engineer. The Owner acknowledges that the Engineer has no control over construction costs or contractor’s methods of determining prices, or over competitive bidding, or market conditions. The Engineer cannot and does not warrant or guarantee that proposals, bids, or actual construction costs will not vary from the Engineer’s opinion of probable cost. Engineer shall not be responsible for any cost variance.
AutoNDA by SimpleDocs
OPINION OF PROBABLE CONSTRUCTION COSTS. 3. Final Bid Package in pdf format for County Purchasing Department for solicitation. Table 4-1 Stormwater Permit Drawing and Bid Document Comparison Permit Drawings Bid Document Drawings Stormwater Post-Development Drainage Plan Cover Sheet Stormwater Post-Development Drainage Plan Drawing Index and Abbreviations Proposed Southeast Basin Grading Plan Legends Northeast Stormwater Basin Grading Improvements Plan General Notes Southeast Stormwater Basin Grading Improvements Coordinate Tables Plan Southeast Stormwater Conveyance Plan, Profile Stormwater and Sediment Control Notes Relocated Northeast Pond Conveyance Pipe Plan, Stormwater Pollution Prevention Plan Profile Southeast Stormwater Basin Sections Stormwater Pollution Prevention Plan Details Energy Dissipater and Drop Inlet Details, Sections, Topographic Survey Tables Phase 1 Mining Process Erosion Control Plan Well and Boring Map Cell IA Construction Erosion Control Plan Existing Conditions Cell 1B Construction Erosion Control Plan Demolition Plan Cell 2 Construction Erosion Control Plan Stormwater Post-Development Drainage Plan Erosion and Sediment Control Details Stormwater Post-Development Drainage Plan Erosion and Sediment Control Details Proposed Southeast Basin Grading Plan Northeast Stormwater Basin Grading Plan Southeast Stormwater Basin Grading Plan Southeast Stormwater Conveyance Plan and Profile Relocated Northeast Pond Conveyance Pipe Plan Permit Drawings Bid Document Drawings Profile Southeast Stormwater Basin Sections Energy Dissipater and Drop Inlet Details, Sections, Tables 17 Permit Drawings 21 Drawings Table 4-2 Stormwater Permit Specifications and Bid Document Comparison Permit Specifications (Not Available) Bid Document Specifications1 01000 Project Requirements 01100 Summary of Work 01200 Measurement and Payment 01290 Schedule of Values 01300 Contract Administration 01310 Construction Coordination 01320 Progress Schedule 01325 Construction Photographs 01330 Submittals and Acceptance 01350 Environmental Protection 01400 Quality Requirements 01450 Testing and Laboratory Services 01500 Temporary Facilities and Controls 01520 Field Offices 01600 Materials and Equipment 01650 Delivery, Storage and Handling 01720 Field Engineering 01740 Final Cleaning 01770 Project Closeout 01780 Warranties and Bonds 01785 Record Documents 02230 Site Preparation 02300 Earthwork 02370 Erosion and Sedimentation Control 02600 Stormwater Facilities 02920 Seeding and Sodding 03301 Concrete and Reinforcing S...
OPINION OF PROBABLE CONSTRUCTION COSTS. It is recognized that neither Xxxxx-Xxxxxxx, Inc. nor its Client has control over the cost of labor, materials or equipment, over the Contractor's methods of determining bid prices, or over competitive bidding, market or negotiating conditions. Accordingly, Xxxxx-Xxxxxxx, Inc. cannot and does not warrant or represent that bids or negotiated prices to construct the part of the project for which it has provided services will not vary from the Client’s budget for the Project or from an estimate of the Cost of the Work or evaluation prepared or agreed to by Xxxxx-Xxxxxxx, Inc.
OPINION OF PROBABLE CONSTRUCTION COSTS. No fixed limit of project construction cost shall be established as a condition of the Agreement, unless agreed upon in writing and signed by the parties hereto. If a fixed limit is established, FNI shall be permitted to include contingencies for design, bidding, and price escalation in the construction contract documents to make reasonable adjustments in the scope of the project to adjust the project construction cost to the fixed limit. Such contingencies may include bid allowances, alternate bids, or other methods that allow FNI to determine what materials, equipment, component systems, and types of construction are to be included in the construction contract documents. Fixed limits, if any, shall be increased by the same amount as any increase in the contract price after execution of the construction contract. FNI will furnish an opinion of probable construction or program cost based on present day pricing, but does not guarantee the accuracy of such estimates. Opinions of probable cost, financial evaluations, feasibility studies, economic analyses of alternate solutions, and utilitarian considerations of operations and maintenance costs prepared by FNI hereunder will be made on the basis of FNI’s experience and qualifications and represent FNI’s judgment as an experienced and qualified design professional. It is recognized, however, that FNI does not have control over the cost of labor, material, equipment, or services furnished by others or over market conditions or contractors’ methods of determining prices. Accordingly, FNI cannot and does not warrant or represent that bids or cost proposals will not vary from the City’s project budget or from any estimate or opinion of probable construction or program cost prepared by or agreed to by FNI.
OPINION OF PROBABLE CONSTRUCTION COSTS. The ENGINEER’s opinion of probable construction costs, if included in its scope of services, represents its reasonable judgment based on the most up to date cost information available to the ENGINEER. The TOWN acknowledges that the ENGINEER has no control over actual construction costs or contractor’s methods of determining prices, or over competitive bidding, or market conditions. The ENGINEER cannot and does not warranty or guarantee that proposals, bids, or actual construction costs will not vary from the ENGINEER’s opinion of probable cost. ENGINEER shall not be responsible for any cost variance.
OPINION OF PROBABLE CONSTRUCTION COSTS. Topographic Survey A topographic survey will be conducted at each intersection. The scope of those surveys are as follows:
OPINION OF PROBABLE CONSTRUCTION COSTS. The Consultant will develop rough order of magnitude construction and ongoing maintenance costs, schedules for periodic maintenance, and construction timelines for each of the three locations. Assumptions • Opinion of probable construction and maintenance costs will be developed for one (1) preliminary design option at each location. Deliverables • Opinion of probable construction and maintenance costs spreadsheet EXHIBIT A: 22 | City of Bend, Oregon
AutoNDA by SimpleDocs
OPINION OF PROBABLE CONSTRUCTION COSTS. CONSULTANT’s opinion of probable construction costs, if rendered as a service under this Contract, is based on assumed labor costs and approximate quantities of material and equipment, and therefore is of a conditional character. CONSULTANT cannot and does not guarantee the cost of work to be performed by others since market or bidding conditions can change at any time and changes in the scope or quality of the project may affect estimates. OWNER xxxxxx and releases CONSULTANT from any loss, liability or claim arising out of or in any way related to CONSULTANT’s opinion of probable construction costs.
OPINION OF PROBABLE CONSTRUCTION COSTS. Any opinion of probable construction cost prepared by Veridus represents their judgment as a design professional and is supplied for the general guidance of the Client. Since Veridus has no control over the cost of labor and material, or over competitive bidding or market conditions, Veridus does not guarantee the accuracy of such opinions as compared to contractor bids or actual cost to the Client.
OPINION OF PROBABLE CONSTRUCTION COSTS. 3. Final Bid Package in pdf format for County Purchasing Department for solicitation.