Risk of Loss or Damage; Maintenance and Repair of Work Sample Clauses

Risk of Loss or Damage; Maintenance and Repair of Work. 10.3.1 DB Contractor shall be responsible for maintenance of the Work and the Site in accordance with Section 19 of the Technical Provisions. Upon Substantial Completion, TxDOT shall assume the maintenance obligations (except for landscape maintenance during the establishment period in accordance with Good Industry Practice); provided, however, that, upon the issuance of Maintenance NTP1 under the Capital Maintenance Agreement, the Maintenance Contractor shall be responsible for the Maintenance Services pursuant to the terms of the Maintenance Agreement Documents. DB Contractor shall be relieved from responsibility for maintenance of all other portions of the Project completed and accepted at Substantial Completion, except that DB Contractor shall be responsible for: (a) maintenance of improvements owned by third parties until control of and maintenance responsibility for such improvements has been formally transferred to the third parties, and (b) maintenance of mitigation sites in accordance with the Environmental Compliance and Mitigation Plan required by Section 4.3.2 of the Technical Provisions and any other extended maintenance responsibilities set forth in the Technical Provisions, including landscape maintenance during the establishment period in accordance with Good Industry Practice. This Section 10.3.1 shall not apply to, or limit DB Contractor’s obligations, under the Capital Maintenance Agreement.
AutoNDA by SimpleDocs
Risk of Loss or Damage; Maintenance and Repair of Work. 10.3.1 Developer shall be responsible for maintenance of the Work and the Project Site in accordance with Section 19 of the Technical Provisions. Upon Final Acceptance and TxDOT’s issuance of Maintenance NTP1, Maintenance Contractor shall assume the maintenance obligations and provide Maintenance Services pursuant to the terms of the Comprehensive Maintenance Agreement Documents. Developer shall be relieved from responsibility for maintenance of the Project completed and accepted at Final Acceptance. This Section 10.3.1 shall not apply to, or limit Developer’s obligations, under the Comprehensive Maintenance Agreement.
Risk of Loss or Damage; Maintenance and Repair of Work. 10.3.1 Developer shall be responsible for maintenance of the Work and the Project Site in accordance with Section 19 of the Technical Provisions. Upon Substantial Completion of each Segment, TxDOT shall assume the maintenance obligations (except for landscape maintenance during the establishment period) in accordance with Good Industry Practice; provided, however, (i) effective as of the date on which the Project or any portion thereof is opened to traffic, Developer shall be relieved of maintenance liability and responsibility for repair of damage caused by the traveling public to the opened portions of the Project, and (ii) the Maintenance Contractor shall be responsible for the Maintenance Services pursuant to the terms of the Maintenance Agreement Documents. Developer shall be relieved from responsibility for maintenance of all other portions of the Project completed and accepted at each Substantial Completion, except that Developer shall be responsible for: (a) maintenance of improvements owned by third parties until control of and maintenance responsibility for such improvements has been formally transferred to the third parties, and (b) maintenance of mitigation sites in accordance with the Environmental Compliance and Mitigation Plan required by Section 4.3.2 of the Technical Provisions and any other extended maintenance responsibilities set forth in the Technical Provisions, including landscape maintenance during the establishment period in accordance with Good Industry Practice. This Section 10.3.1 shall not apply to, or limit Developer’s obligations, under the Maintenance Agreement.
Risk of Loss or Damage; Maintenance and Repair of Work. 10.3.1 DB Contractor shall be responsible for maintenance of the Work and the Project Site in accordance with Section 19 of the Technical Provisions. Upon Substantial Completion and TxDOT’s issuance of Maintenance NTP, the Maintenance Contractor shall assume maintenance responsibility and be responsible for the Maintenance Services pursuant to the terms of the Comprehensive Maintenance Agreement Documents. DB Contractor shall be relieved from responsibility for maintenance of the Project at Substantial Completion, except that DB Contractor shall be responsible for: (a) maintenance of improvements owned by third parties until control of and maintenance responsibility for such improvements has been formally transferred to the third parties, and
Risk of Loss or Damage; Maintenance and Repair of Work. 10.3.1 DB Contractor shall be responsible for maintenance of the Work and the Project Site in accordance with Section 19 of the Technical Provisions. Upon Substantial Completion of each of Section 1A, Section 1B and Segment 2, as applicable, TxDOT shall assume the maintenance obligations (except for landscape maintenance during the establishment period) for such Section or Segment in accordance with Good Industry Practice; provided however, (i) effective as of the date on which the Project or any portion thereof is opened to traffic, DB Contractor shall be relieved of maintenance liability and responsibility for repair of damage caused by the traveling public to the opened portions of the Project, and (ii) if TxDOT issues Maintenance NTP1 under the CMA, (a) DB Contractor shall be responsible for the Maintenance Services for Section 1A pursuant to the terms of the Capital Maintenance Agreement Documents, and (b) upon Substantial Completion of each of Section 1B and Segment 2, DB Contractor shall be responsible for the Maintenance Services of such Section 1B or Segment 2, as applicable, pursuant to the terms of the Capital Maintenance Agreement. DB Contractor shall be relieved from responsibility for maintenance of each of Section 1A, Section 1B and Segment 2 completed and accepted at each Substantial Completion, except that DB Contractor shall be responsible for: (a) maintenance of improvements owned by third parties until control of and maintenance responsibility for such improvements has been formally transferred to the third parties, and (b) maintenance of mitigation sites in accordance with the Environmental Compliance and Mitigation Plan required by Section 4.3.2 of the Technical Provisions and any other extended maintenance responsibilities set forth in the Technical Provisions, including landscape maintenance during the establishment period in accordance with Good Industry Practice. This Section 10.3.1 shall not apply to, or limit DB Contractor’s obligations, under the Capital Maintenance Agreement.
Risk of Loss or Damage; Maintenance and Repair of Work. 10.3.1 DB Contractor shall be responsible for maintenance of the Construction Work and the Site in accordance with Section 19 of the Technical Provisions. The Authority will be responsible for operation and maintenance of the Toll Lanes and the Authority Improvements from and after Substantial Completion, although DB Contractor will still be responsible for completing all aspects of the Work in order to achieve Final Acceptance of the Toll Lanes. Upon Final Acceptance, TxDOT shall assume the maintenance obligations for all other portions of the Project completed and accepted at such Final Acceptance, with the Authority remaining responsible for the maintenance obligations of the Toll Lanes and the Authority Improvements, and DB Contractor shall be relieved from responsibility for maintenance of such portions of the Project; provided, however, that DB Contractor shall be responsible for maintenance of improvements owned by third parties until control of and maintenance responsibility for such improvements has been formally transferred to the third parties.
Risk of Loss or Damage; Maintenance and Repair of Work. 10.3.1 DB Contractor shall be responsible for maintenance of the Work and the Site in accordance with Section 19 of the Technical Provisions. Upon Substantial Completion of each Segment, TxDOT shall assume the maintenance obligations (except for landscape maintenance during the establishment period in accordance with Good Industry Practice); provided, however, that if TxDOT issues Maintenance NTP1 under the Capital Maintenance Agreement, the Maintenance Contractor shall be responsible for the Maintenance Services pursuant to the terms of the Maintenance Agreement Documents. DB Contractor shall be relieved from responsibility for maintenance of all other portions of the Project completed and accepted at each Substantial Completion, except that DB Contractor shall be responsible for: (a) maintenance of improvements owned by third parties until control of and maintenance responsibility for such improvements has been formally transferred to the third parties, and (b) maintenance of mitigation sites in accordance with the Environmental Compliance and Mitigation Plan required by Section
AutoNDA by SimpleDocs

Related to Risk of Loss or Damage; Maintenance and Repair of Work

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Maintenance and Repair (a) Except for any Alterations that Tenant is permitted to make pursuant to this Lease, Tenant shall at all times put, keep and maintain the Leased Premises (including, without limitation, the roof, landscaping, walls, footings, foundations and structural components of the Leased Premises) in the same (or better) condition and order of repair as exists as of the Commencement Date, except for ordinary wear and tear, and shall promptly make all repairs and replacements of every kind and nature, whether foreseen or unforeseen, which may be required to be made upon or in connection with the Leased Premises in order to keep and maintain the Leased Premises in the order and condition required by this Paragraph 11(a). Tenant shall do or cause others to do all shoring of the Leased Premises or of foundations and walls of the Improvements and every other act necessary or appropriate for preservation and safety thereof, by reason of or in connection with any excavation or other building operation upon any of the Leased Premises, whether or not Landlord shall, by reason of any Legal Requirements or Insurance Requirements, be required to take such action or be liable for failure to do so. LANDLORD SHALL NOT BE REQUIRED TO MAKE ANY REPAIR, WHETHER FORESEEN OR UNFORESEEN, OR TO MAINTAIN ANY OF THE LEASED PREMISES IN ANY WAY, AND TENANT HEREBY EXPRESSLY WAIVES THE RIGHT TO MAKE REPAIRS AT THE EXPENSE OF THE LANDLORD, WHICH RIGHT MAY BE PROVIDED FOR IN ANY LAW NOW OR HEREAFTER IN EFFECT. Nothing in the preceding sentence shall be deemed to preclude Tenant from being entitled to insurance proceeds or condemnation awards for Restoration pursuant to Paragraphs 13(c) and 14(g). Tenant shall, in all events, make all repairs for which it is responsible hereunder promptly (but in any event shall commence actions to initiate such repairs as quickly as possible after the date Tenant becomes aware that such repairs are necessary, or, in the event of a Restoration pursuant to Paragraph 13(c) or 14(g), within sixty (60) days of the date insurance proceeds or a condemnation award has been paid to the Trustee (it being understood that Tenant shall take such steps as are reasonably necessary to protect and preserve the integrity and safety of the Leased Premises pending such payment) and shall diligently pursue such repairs to completion), and all repairs shall be made in a good, proper and workmanlike manner.

  • Maintenance and Repairs 7.1 Tenant shall, at its expense, throughout the Term and all renewals and extensions thereof, maintain in good order, condition and repair the Premises, including but not limited to heating and air conditioning equipment, walls, floors and ceilings, window exteriors, mechanical and electrical systems and equipment exclusively serving the Premises, electric light fixtures, bulbs, tubes and tube casings, doors, floor coverings, dock doors, levelers, plumbing system and plumbing fixtures, Tenant’s signs and utility facilities not maintained by Landlord. Landlord shall use reasonable efforts to extend to Tenant the benefit from warranties on such items, if any, that have been made by Landlord’s contractors or vendors and to extend to Tenant, as and if available, any bulk buying power that Landlord may have with such contractors or vendors. If any portion of the Premises or any system or equipment in the Premises which Tenant is obligated to repair cannot be fully repaired, Tenant shall promptly replace the same, regardless of whether the benefit of such replacement extends beyond the Term. Tenant shall, at Tenant’s expense, maintain a preventive maintenance contract providing for the regular inspection (at least quarterly) and maintenance of the heating and air conditioning system by a licensed and qualified heating and air conditioning contractor, or Tenant shall perform such HVAC inspection and maintenance with duly licensed and qualified employee. The cost of such preventive maintenance contract shall be paid by Tenant and an expense solely chargeable to Tenant; but if Landlord so elects, same may be billed directly by Landlord to Tenant where Landlord on Tenant’s behalf enters into such preventive maintenance contract and in such case shall be deemed Additional Rent (Landlord alone may so elect whether to enter into such preventive maintenance contract on Tenant’s behalf). Landlord shall have the right, upon notice to Tenant, to undertake the responsibility for preventive maintenance of any other system or component at Tenant’s expense. Tenant shall be responsible for janitorial services and trash removal from the Premises, at Tenant’s expense. Landlord and Tenant intend that, at all times during the Term, Tenant shall maintain the Premises in good order and condition and appearances reasonably commensurate with the balance of the Property. All of Tenant’s obligations to maintain and repair shall be accomplished at Tenant’s sole expense. If Tenant fails to maintain and repair the Premises as required by this Section, Landlord may, on 10 days’ prior written notice (except that no notice shall be required in case of emergency), enter the Premises and perform such maintenance or repair on behalf of Tenant; provided such entry is made in compliance with Applicable Laws, including but not limited to, the Marijuana code. In such cases, Tenant shall reimburse Landlord immediately upon demand for all costs incurred in performing such maintenance or repair plus an administration fee equal to 5% of such actual and reasonable costs or expenses.

  • Installation and Maintenance Except for the bi‐directional and production metering equipment owned by the City, all equipment on Customer’s side of the delivery point, including the required disconnect device, shall be provided and maintained in satisfactory operating condition by Customer and shall remain the property and responsibility of the Customer. The City will bear no responsibility for the installation or maintenance of Customer’s equipment or for any damage to property as a result of any failure or malfunction thereof. The City shall not be liable, directly or indirectly for permitting or continuing to allow the interconnection of the Facility or for the acts or omissions of Customer or the failure or malfunction of any equipment of Customer that causes loss or injury, including death, to any party.

  • Repair of Damage If the Relevant Space is damaged in part or whole from any cause and the Relevant Space can be substantially repaired and restored within one hundred and fifty (150) days from the date of the damage using standard working methods and procedures if the Landlord’s mortgagee provides adequate assurances to Landlord that it will make sufficient insurance proceeds available to substantially repair and restore within one hundred fifty (150) days (the “Repair and Restoration Funds”), and if Tenant is not in default at the time the damage occurs or at the time the Repair and Restoration Funds are received by Landlord, Landlord shall at its expense promptly and diligently repair and restore the Relevant Space to substantially the same condition as existed before the damage. This repair and restoration shall be made within one hundred and fifty (150) days from the date of the damage (the “Repair and Restoration Period”) unless the delay is due to causes beyond Landlord’s reasonable control; provided, however, that the Repair and Restoration Period may be extended by Landlord for an additional ninety (90) days if at the end of one hundred and fifty (150) days Landlord is making a prompt and diligent effort to repair and restore the Relevant Space, but has not completed doing so. The term “Repair and Restoration Period” includes any extension thereof provided for under this paragraph. If the Relevant Space cannot be repaired and restored within the one hundred and fifty (150) day period or if Landlord’s mortgagee does not provide adequate assurances to Landlord as to the availability of Repair and Restoration Funds as aforesaid (the “Adequate Assurances”), then either party may, within ten (10) days after determining that the repairs and restoration cannot be made or the Adequate Assurances cannot be given within one hundred and fifty (150) days (as prescribed in paragraph 6.01(c)), cancel the Lease by giving notice to the other party; provided, however, Tenant may not cancel the Lease if Landlord agrees to repair and restore the Relevant Space even though Landlord has not received the Adequate Assurances. Nevertheless, if the Relevant Space is not repaired and restored within the Repair and Restoration Period, then Tenant may cancel the Lease at any time after the end of the Repair and Restoration Period and before the end of a period terminating thirty (30) days after the end of the Repair and Restoration Period. Tenant shall not be able to cancel this Lease if its willful misconduct causes the damage unless Landlord is not promptly and diligently repairing and restoring the Relevant Space.

  • Routine Maintenance, Construction, and Repair The NYISO or Connecting Transmission Owner may interrupt interconnection service or curtail the output of the Small Generating Facility and temporarily disconnect the Small Generating Facility from the New York State Transmission System or Distribution System when necessary for routine maintenance, construction, and repairs on the New York State Transmission System or Distribution System. The NYISO or the Connecting Transmission Owner shall provide the Interconnection Customer with five Business Days notice prior to such interruption. The NYISO and Connecting Transmission Owner shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer.

  • Repair and Maintenance Except in the case of damage to or destruction of the Leased Premises, the Building, the Outside Areas or the Property caused by an act of God or other peril, in which case the provisions of Article 10 shall control, the parties shall have the following obligations and responsibilities with respect to the repair and maintenance of the Leased Premises, the Building, the Outside Areas, and the Property.

  • Maintenance and Repair – Line Sharing 3.6.1 C.M. shall have access for repair and maintenance purposes to any Loop for which it has access to the High Frequency Spectrum. If C.M. is using a BellSouth owned splitter, C.M. may access the Loop at the point where the combined voice and data signal exits the central office splitter via a bantam test jack. If C.M. provides its own splitter, it may test from the collocation space or the Termination Point.

  • Installation, Inspection, and Maintenance The Contractor is responsible for installation and maintenance of the BMPs as a part of its Bid. The Design Professional shall obtain the services of a qualified testing laboratory to inspect the BMPs in accordance with the permits, the costs of such inspections to be borne by the Owner. In the event of Abnormal Weather Conditions or force majeure, the Contractor shall be compensated for re-installation of BMPs at established Unit Prices.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!