Storage System Clause Samples

Storage System. In this section the PANACEA storage system is presented. An open source storage system has been used and modified to fulfil the PANACEA requirements.
Storage System. PGE will have the right to charge the Storage System seven (7) days per week and twenty-four (24) hours per day (including NERC holidays) using energy from any source; provided that PGE shall pay for all such Charging Energy.
Storage System. This system would be located at the Parking Lot 41 site and would store up to approximately five million gallons of industrial water. Industrial water is water that the CUP utilizes to generate steam or chilled water. Components of the system would include a storage tank, partially below-grade; a pump house building with a footprint of approximately 5,000 SF; support equipment, such as pumps, valves, variable frequency drivers, electrical equipment, switchgear, piping, controls, instrumentation, and an emergency generator; and security fencing, lighting, and other site improvements. The NIH would use this system to ensure an adequate supply of water to the chillers. The Thermal Energy Storage System and the Industrial Water Storage System would each require new or upgraded utility infrastructure at locations outside the limit of disturbance for each system. Potential locations for many components of this infrastructure have been identified during the planning process. However, precise details including piping locations and sizes are not fully developed. Examples of the types of infrastructure that the NIH may install or upgrade include additional equipment (e.g., pumps, variable frequency drives, electrical equipment, switchgear, emergency generator, control valves, backflow preventers, pressure reducing valves, controls, and instrumentation); other utility buildings; aboveground or buried piping; aboveground or buried utilities; and site improvements (e.g., repairs to existing features, new concrete slabs).

Related to Storage System

  • Supported Wage System The Supported Wage provisions are set out in Schedule E – Supported Wage System.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Transport Services Upon the conclusion of such multilateral negotiations, the Parties shall conduct a review for the purpose of discussing appropriate amendments to this Agreement so as to incorporate the results of such multilateral negotiations.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.