Stormwater Pump Station Site Design Sample Clauses

Stormwater Pump Station Site Design. Basis of EstimateProposed DesignStandard Drawing Details The total proposed supplemental fee for professional engineering and additional services including Topographic Survey, Geotechnical Investigations, H&H analysis, Detention Pond and pump station design will be $240,257.01. A detailed breakdown of the level of effort with the fee for the supplemental engineering services is attached with this letter. Please review and let me know if you have any comments or clarifications regarding the scope of services submitted. Original Contract Amount $781,514.12 Amendment 1 Contract amount $159,964.94 Amendment 2 Contract amount $240,257.01 Total Contract Amount $1,181,736.07 Sincerely, Xxxxxx Made, P.E., PMP, ENV SP Project Manager Isani Consultants, LP "EXHIBIT B" - Compensation for Professional Services (Supplemental for Additional H&H and Detention Pond) Project Name: West Sycamore Road Segment 3 2.1 Existing Condition Analysis $ 9,240.00 2.2 Proposed Condition Analysis $ 19,990.00 2.3 Drainage Report $ 27,520.00 Project Limits: From South Post Oak Boulevard to FM 521 FBC Project Number: 17123x | Isani Project Number: 20PV100 1 Preliminary Design (Including Coordination with Subs & Project Management) $ 12,600.00 $ 56,750.00 3 Detention Pond Design (Supplemental) 3.1 Detention Pond Design $ 27,315.00 3.2 Electrical Design for Stormwater Pump Station $ 33,620.00 3.3 Stormwater Pump Station Site Design $ 29,420.00 3.4 Project Management $ 5,180.00 $ 95,535.00 4 Geotechnical Investigations (Supplemental) 4.1 Detention Pond (10 acres pond) $ 34,073.00 $ 34,073.00 5 Survey (Supplemental) 5.1 Detention Pond (10 acres pond) $ 33,847.32 $ 33,847.32 TOTAL FOR BASIC SERVICES (1-5) $ 232,805.32 6 Survey 6.1 Create Parcel Plat Map, M&B Description (2 Parcel )@ $3,725.85/Parcel) $ 7,451.69 TOTAL FOR OPTIONAL ADDITIONAL SERVICES (6) $ 7,451.69 TOTAL FOR BASIC & OPTIONAL ADDITIONAL SERVICES (1-6) $ 240,257.01 EXHIBIT B Employee Classification No. of Sheets Principal Project Manager QA/QC Engineer Project Engineer Graduate Engineer CAD Technician Admin Total Labor Hrs & Costs Total Contract Rate Per Hour $285.00 $195.00 $170.00 $150.00 $130.00 $115.00 $90.00 A1 PRELIMINARY ENGINEERING/DESIGN $ - A2 DRAINAGE ANALYSIS (H&H) 54 12 120 200 2 388 $ 56,750.00 A3 GEOTECHNICAL INVESTIGATIONS (BY Associated Testing Laboratories, Inc.) $ 34,073.00 A4 TOPOGRAPHIC SURVEY AND ROW MAPS (BY Landtech, Inc) $ 41,299.01 A5 PROJECT MANAGEMENT 24 32 24 80 $ 12,600.00 A6 OTHER EXPENSES DRAI...
AutoNDA by SimpleDocs

Related to Stormwater Pump Station Site Design

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Access to Project Site Redeveloper shall permit the representatives of the City to enter Project Site at any and all reasonable times, as the City may deem necessary for the purposes of this Redevelopment Agreement, including but not limited to work and inspection of all work being performed in connection with the construction of the Redeveloper Improvements. Similarly, the City shall permit Redeveloper such entry upon the public rights of way for such purposes. No compensation shall be payable nor shall any charges be made in any form by any party for the access or inspection provided for in this Section. The City’s right of access granted under this Section shall terminate upon issuance by the City of the Redeveloper’s Certificate of Completion of Redeveloper Improvements. Notwithstanding the above, Redeveloper shall not be relieved of the provisions contained in Chapter 14.29 of the Lincoln Municipal Code regarding the use of streets for private construction purposes.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Developer Attachment Facilities Developer shall design, procure, construct, install, own and/or control the Developer Attachment Facilities described in Appendix A hereto, at its sole expense.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following: A. Company is required to submit a Notice of Intent to use the State of Florida Multi-Sector Generic Permit for Stormwater Discharge Associated with Industrial Activity. Authority and Company both acknowledge that close cooperation is necessary to ensure compliance with any stormwater discharge permit terms and conditions, as well as to ensure safety and to minimize the cost of compliance. Company acknowledges further that it may be necessary to undertake actions to minimize the exposure of stormwater to “significant materials” (as such term may be defined by applicable stormwater rules and regulations) generated, stored, handled, or otherwise used by Company by implementing and maintaining “best management practices” (BMPs) (as such term may be defined in applicable stormwater rules and regulations). Company will establish a BMP plan for the Premises and submit a copy to Authority. B. Company will be knowledgeable of any stormwater discharge permit requirements applicable to Company and with which Company will be obligated to comply. The submittal of a Notice of Intent will be made by Company to the FDEP, and a copy will be submitted to Authority. Company is required to comply with the following requirements including, but not limited to, certification of non-stormwater discharges; collection of stormwater samples; preparation of a Stormwater Pollution Prevention Plan or similar plans; implementation of BMPs; and maintenance and submittal of necessary records. In complying with such requirements, Company will observe applicable deadlines set by the regulatory agency that has jurisdiction over the permit. Company agrees to undertake, at its sole expense, those stormwater permit requirements for which it has received written notice from the regulatory agency and that apply to the Premises, and Company agrees that it will hold harmless and indemnify Authority for any violations or non-compliance with any such permit requirements.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!