Temporary Access Roads Sample Clauses

Temporary Access Roads. Temporary access roads associated with oil and gas operations at the Well Sites shall be reclaimed and revegetated to the original state within a reasonable amount of time, taking into account planting seasons, or as directed by the landowner in a Surface Use Agreement and subject to applicable COGCC variances. Operator must control erosion while access roads are in use.
AutoNDA by SimpleDocs
Temporary Access Roads. Although the line construction activities will rely on many existing roads, certain new access roads/tracks may be built to reach tower locations, if it is absolutely necessary. Generally, maximum efforts will be made to manually transport equipment in knocked-down state to tower locations, to avoid building new access roads. Building materials to such locations would also be hand-carried wherever possible. These 3-4 m wide temporary access roads will be sited carefully to minimise the disruptions to paddy farming and other operations. These temporary access roads will be completely removed after the construction, unless the DS makes a special request to retain them on public interest for future use.
Temporary Access Roads. The Contractor shall construct and maintain temporary access roads for convenient access to the various parts of the work and for other necessary purposes incidental to the performance of the contract. The Engineer or Consulting Engineer shall approve the location of access roads prior to construction. The Department will not make separate payment for construction and maintenance of temporary access roads, unless otherwise indicated. The Contractor shall erect such temporary fences or guards as may be necessary to keep unauthorized persons away from the work. The Contractor shall provide, and maintain in good condition, all grading and surfacing of temporary access roads, excavations, fills, and embankments, whether for purposes of construction or convenience, beyond the limits of ordered excavations. The Contractor is required to maintain all roads used by its hauling equipment in a dust-controlled condition and/or cleared of snow. Upon completion, the Contractor shall return the disturbed areas to the approximate original condition as approved by the Engineer or Consulting Engineer.

Related to Temporary Access Roads

  • Temporary Roads As necessary to attain stabilization of roadbed and fill slopes of Temporary Roads, Purchaser shall employ such measures as out- sloping, drainage dips, and water-spreading ditches. After a Temporary Road has served Purchaser’s pur- pose, Purchaser shall give notice to Forest Service and shall remove bridges and culverts, eliminate ditches, out- slope roadbed, remove ruts and berms, effectively block the road to normal vehicular traffic where feasible under existing terrain conditions, and build cross ditches and water bars, as staked or otherwise marked on the ground by Forest Service. When bridges and culverts are re- moved, associated fills shall also be removed to the ex- tent necessary to permit normal maximum flow of water.

  • Temporary Work 17.01 (a) Employees shall perform any temporary work which the Management directs with the understanding that when an employee is assigned to a job with a lesser rate of pay, he shall receive his regular rate of pay.

  • Temporary Upgrade An employee in a temporary upgrade status shall have no right to grieve or arbitrate release from such temporary upgrade status.

  • Temporary Upgrading (a) In the event that an employee is temporarily transferred to a higher classification than that to which the employee is regularly assigned, he or she shall be paid at the normal wage scale for such higher classification during the period of such transfer for not less than a full tour of duty.

  • Temporary Facilities a. The Contractor shall obtain permits for, install and maintain in safe condition all scaffolds, hoisting equipment, barricades, walkways, or other temporary structures that may be required to accomplish the work. Such structures shall be adequate for the intended use and capable of safely accepting all loads that may be imposed upon them. They shall be installed and maintained in accordance with all applicable codes and regulations.

  • Temporary Positions A) The Employer may create regular temporary positions for vacation relief for more than one (1) incumbent for up to six (6) months duration.

  • Temporary Layoff The Employer may temporarily layoff an employee for up to ninety (90) days due to an unanticipated loss of funding, revenue shortfall, lack of work, shortage of material or equipment, or other unexpected or unusual reasons. An employee will normally receive seven (7) days notice of a temporary layoff.

  • Temporary Position (i) is a position that the Employer has determined will be in excess of eight

  • Temporary Services The steamfitters shall not do any other work and shall not be permitted to work more than one shift in a twenty- four hour day. When steamfitters are present during the regular working day, no temporary services steamfitter will be required. Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $41.80 Supplemental Benefit Rate per Hour: $42.76 Overtime Double time the regular rate after an 8 hour day. Double time the regular time rate for Saturday. Double time the regular rate for Sunday.

  • Temporary Layoffs A. The Employer may initiate a temporary layoff for up to twelve (12) working days per fiscal year. Employees will be given thirty (30) days’ notice before the effective date of a temporary layoff. Employees may request alternative temporary layoff days from their manager or supervisor and any requests will be considered and approved or denied in writing.

Time is Money Join Law Insider Premium to draft better contracts faster.