As-Built Documents Sample Clauses

As-Built DocumentsThe Contract Documents showing the condition of the Work as actually built, including, without limitation, the locations of mechanical, electrical, plumbing, HVAC or similar portions of the Work that are shown diagrammatically in the Contract Documents approved by City. These documents are maintained by Contractor on the Site and delivered, along with an electronic version of the set, to City upon Final Completion.
AutoNDA by SimpleDocs
As-Built DocumentsThe Contractor shall prepare, and keep up-to-date, a complete set of “as-built” records of the execution of the Works, showing the exact as-built locations, sizes and details of the work as executed and which shall include a "history file" including design calculations and certain certification and anything else required to meet the CE Marking requirement. These records shall be kept (i) prior to the Contractor being given access to the Site, at the Contractor's factory in [to insert]; and (ii) upon being given access to the Site, on the Site and shall be used exclusively for the purposes of this sub-clause. Two copies shall be supplied to the Engineer prior to the commencement of the Tests on Completion.
As-Built Documents. As a condition of Final Completion, Contractor shall provide to Owner a complete set of As-Built Documents, in duplicate and in digital format. As-Built Documents shall depict the Project as constructed and shall reflect each change, modification, and deletion made during construction. As-Built Documents include all modifications to the Contract Documents unless otherwise directed.
As-Built DocumentsThe Construction Manager shall perform coordination, supervisory and expediting functions in connection with the contractor’s obligation to provide “as-built” documents and make recommendations for adequate withholding of retention in the event that a contractor fails to provide acceptable “as-built” documents.
As-Built DocumentsLandlord shall provide to Tenant at the conclusion of Landlord’s Work copies of the As-Built drawings of the Premises.
As-Built Documents. Operator shall deliver to the Port not later than ninety (90) days after the Opening Date full and complete “as built” drawings of the Initial Tenant Improvements in electronic format in full conformance with the Port’s CAD Standards Manual and three (3) half-size hard copies. For any equipment installed, Operator shall deliver to the Port, two
As-Built Documents. 3.10.1 Contractor shall maintain one set of As-built drawings and specifications, which shall be kept up to date during the Work of the Contract. All changes which are incorporated into the Work which differ from the documents as drawn and written shall be noted on the As-built set. Notations shall reflect the actual materials, equipment and installation methods used for the Work and each revision shall be initialed and dated by Superintendent. Prior to filing of the Notice of Completion each drawing and the specification cover shall be signed by Contractor and dated attesting to the completeness of the information noted therein. As-built Documents shall be turned over to the Owner’s Representative and shall become part of the Record Documents. Refer to Division 1.
AutoNDA by SimpleDocs
As-Built DocumentsThe Design Build Entity shall maintain one (1) set of As-Built drawings and specifications, which shall be kept up to date during the work of the Contract. All changes from the Documents as drawn and written and approved which are incorporated into the work on the Project shall be noted on the As-Built set. Notations shall reflect the actual materials, equipment and installation methods used for the work on the Project, as well as the actual location of the work, and each revision shall be initialed and dated by Superintendent. Prior to filing of the Notice of Completion, each drawing and the specification cover shall be signed by the Design Build Entity and dated, attesting to the completeness of the information noted therein. As-Built Documents shall be turned over to the City’s Representative and shall become part of the Record Documents as required by the Scope of Work.
As-Built DocumentsThe Contractor shall prepare, and keep up-to-date, a complete set of "as-built" records of the execution of the Works, showing the exact as-built locations, sizes and details of the work as executed. These records shall be kept on the Work Site and shall be used exclusively for the purposes of this Sub-Clause. Two copies shall be supplied to *Contract Awarder prior to the commencement of the Tests on Completion. In addition, the Contractor shall supply to the Contract Awarder as-built drawings of the Works, showing all Works as executed, and submit them to the Contract Awarder for review under Sub-Clause 5.2 [Contractor's Documents]. The Contractor shall obtain the consent of the Contract Awarder as to their size, the referencing system, and other relevant details. Prior to the issue of any Taking-Over Certificate, the Contractor shall supply to the Contract Awarder the specified numbers and types of copies of the relevant as-built drawings, in accordance with the Contract Awarder's Requirements. The Works shall not be considered to be completed for the purposes of taking-over under Sub-Clause 10.1 [Taking Over of the Works and Sections] until the Contract Awarder has received these documents.
As-Built Documents. Subcontractor includes the continuous maintenance and final submission of as-built documentation and delivery to FLINT upon completion of his work, and prior to final payment. This includes retaining the services of a licensed surveyor, if required, to perform an as-built survey upon completion of the work. As-built documents shall be maintained at Subcontractor’s site office and shall be current at all times during the progress of the work. XXXXX may request periodic submission or review of in-progress as-built documents to ensure continuous compliance throughout the project.