Civil Design Sample Clauses

Civil Design. 9 The A/E shall perform civil design for new and existing 10 roads as required, in conformance to County Standards.
AutoNDA by SimpleDocs
Civil Design. Civil Design covers the layout of the proposed facilities and associated outside piping, paving, grading and drainage. Contract drawings and specifications for the civil work shall be prepared;
Civil Design. The Engineer will perform the design and plan production in accordance with the approved schedule. The Design will include the Preliminary and the Final Design for existing bridges to be replaced on Orberrender Road at Fairchilds. Plans will be submitted to FORT BEND COUNTY for review and approval at 30%, 95% and 100% design stages. The Design will include the following;
Civil Design. The Engineer will perform the design and plan production in accordance with the approved schedule. The Design will include the Preliminary and the Final Design for existing bridges to be replaced on Xxx Xxxxx Street at Fairchilds Creek Tributary. Plans will be submitted to FORT BEND COUNTY for review and approval at 30%, 95% and 100% design stages. The Design will include the following;
Civil Design. Establish the final scope of, and submit preliminary details for, on-site and off-site civil engineering work.
Civil Design. 7.1 75% Civil Design 7.2 90% and Civil Design
Civil Design. Develop preliminary design solutions for Project Site drainage systems, storm water management, grading, paving, curb cuts, utilities and fire protection. Develop preliminary design solutions for off-site utility systems improvements required for the Project.
AutoNDA by SimpleDocs
Civil Design. Documentation In this phase, the design team will: Develop conceptual design solutions for on-site utility systems, fire protection systems, drainage and paving systems.  Conceptual Site and Utility Plans  Updated Basis of Design Report Phase 3Schematic Design
Civil Design. Documentation In this phase, the design team will:  On-site and off-site utility plans. Prepare Drawings based on the approved Design Development documents.  Grading, drainage and paving plans The Construction Drawings will be submitted for City and Airport review at 35%, 65% and 95%.    Schedules / Details Calculations Specifications Address comments related to reviews.  Updated Basis of Design Report
Civil Design. Documentation In this phase, the design team will:  Preliminary on-site and off-site utility Continue development and expansion of Schematic Design plans. Documents.  Preliminary grading, Establish final scope and preliminary details for on-site and off- site work as it relates to this project.  drainage and paving plans Preliminary CalculationsOutline Specifications  Updated Basis of Design Report
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!