Construction Worker Grade Sample Clauses

Construction Worker Grade. 2 Aluminium alloy structural erector Assistant powder monkey Assistant rigger Bar bending machine operator Bitumen worker Chainman Concrete cutting or drilling Machine operator Concrete floater Concrete formwork stripper Concrete gangworker Concrete gun or pump operator Crane chaser/crane hand/gantry hand Demolition labourer Dump cart operator Fencer Gear hand Jackhammer man Kerb and gutter layer Pick or shovel man Steel erector Tradesman’s labourer.
AutoNDA by SimpleDocs
Construction Worker Grade. 5 Operator drilling machine over 155 mm to 230 mm diameter Shaft or trench sinker Tunneller 2 Winding and haulage driver Construction Worker Grade 6 Operator drilling machine over 230 mm diameter Operator, tunnel boring machine Operator tunnel excavating machine Alpine Tunneller 1 2 Classifications - Plant Operators
Construction Worker Grade. 1 • Labourer with less than three months experience in the construction industry
Construction Worker Grade. 7 (CW7) • Operates machinery and equipment requiring the exercise of skill and knowledge beyond that of an employee at CW6. • Operates a mobile crane with a lifting capacity in excess of 180 tonnes and up to and including 300 tonnes. • Tower Crane operator • Non Destructive Testing Technical Officer (or Non Destructive Technician Level 3 as defined by AS 3998 – 19992)
Construction Worker Grade. 3 Concrete batching plant operator Concrete finisher Foundation shafts man Hoist or winch driver Manhole builder Pitcher or xxxxxxx Powder monkey Power driven portable saw, Employee operating Scaffolder Spotter Steel fixer (including tack welder) Storeman Tool sharpener Traffic controller Wall builder
Construction Worker Grade. 4 (CW4) • Operates machinery and equipment requiring the exercise of skill and knowledge beyond that of an employee at CW3. • Operator Loader greater than 15 tonnes (for example, greater than or equal to Cat 950 loader) • Operator Excavator greater than 15 tonnes (for example, greater than or equal to Cat 315 Excavator) • Operator Scraper with greater than 10m3 struck capacity (for example, greater than or equal to Cat 621, 627, 623 Scrapers) • Operator Dozer larger than D9 • Operator Grader other than final trim • Operator Mobile Crane greater than 20 tonnes and less than 80 tonnes capacity • Dogman • Rigger • Multi-skilled Civil Worker
Construction Worker Grade. 8 (CW8) • Operates a crane with a lifting capacity in excess of 300 tonnes. 38 SCHEDULE THREE – RATES OF PAY Hourly Rates of Pay 1/07/2007 1/01/2008 1/07/2008 1/01/2009 1/07/2009 1/01/2010 1/07/2010 1/01/2011 1/07/2011 1/01/2012 1/01/2012 Classifica tion CW1 $22.13 $22.57 $23.02 $23.48 $23.95 $24.43 $24.91 $25.41 $25.92 $26.43 $26.96 CW2 $22.49 $22.94 $23.40 $23.86 $24.33 $24.81 $25.30 $25.81 $26.32 $26.85 $27.39 CW3 $23.05 $23.51 $23.98 $24.46 $24.95 $25.45 $25.96 $26.48 $27.01 $27.55 $28.10 CW4 $23.61 $24.08 $24.57 $25.06 $25.56 $26.07 $26.59 $27.12 $27.66 $28.22 $28.78 CW5 $24.50 $24.99 $25.49 $26.00 $26.52 $27.05 $27.59 $28.14 $28.70 $29.28 $29.86 CW6 $25.42 $25.92 $26.44 $26.97 $27.51 28.06 $28.62 $29.19 $29.78 $30.37 $30.98 CW7 $26.42 $26.95 $27.49 $28.04 $28.60 $29.17 $29.75 $30.35 $30.95 $31.57 $32.20 CW8 $27.49 $28.03 $28.60 $29.17 $29.75 $30.34 $30.94 $31.56 $32.19 $32.83 $33.49 These rates may be increased from time to time in response to movements in CPI or the general market at the Company’s sole discretion. Leading Hand Any employee specifically appointed as a leading hand shall be paid the following additional amounts: Flat Per Week i. In charge of not more than 1 person $12.70 ii. In charge of 2 and not more than 5 persons $28.40 iii. In charge of 6 and not more than 10 persons $36.00 iv. In charge of more than 10 persons $47.30
AutoNDA by SimpleDocs
Construction Worker Grade. 1 • A labourer with less than six (6) months’ experience in the industry Construction Worker Grade 2General Labourer (can include cleaning duties) • Trades Assistant (assists Employees at higher classification levels, including tradesperson) • Storeperson • Traffic controller • Chainperson • Fencer • Stripping • Concrete floater • Concrete Gang Worker or Spreader • Concrete finisher, powered • Concrete spreader, powered • Crawler tractor with power operated attachments (up to and including 2000 kg shipping mass) Dumper, rear and bottom (up to and including 2 cubic metres struck capacity) • Hand sprayer, xxxxx type • Pneumatic tyred tractor with power operated attachments (up to and including 15 kw net engine power) • Roller, vibrating (under 4 tonnes) • Second driver, navy and dragline or dredge type excavator • Trenching machine (small Ditch-Witch type) • Rigger – Basic Construction Worker Grade 3 • Pile Driver <105 kw • Steel Fixer • Drainer • Crusher Operator • Bitumen sprayer (driver) or worker • Concrete batching plant operator • Concrete paver • Crawler loader (up to and including 15,000 kg mass) • Crawler tractor with power operated attachments (over 2,000 kg up to and including 15,000 kg shipping mass) • Dumper, rear and bottom (above 2 cubic metres, up to and including 30 cubic metres struck capacity) • Excavator < 15 Tonnes • Grader < 15 Tonnes • Locomotive (not carrying passengers) • Pile driver • Pneumatic tyred tractor with power operated attachments (above 15 kw, up to and including 150 kw net engine power) • Road marker operator • Roller, vibrating (4 tonnes and above) • Track laying, fixing or levelling machine (railway construction) • Trench machine (depth up to 2.4 metres, and width up to 450 mm) and bucket wheel trencher with equivalent capacity in cubic metres per hour • Concrete Paving Machine Operator • Concrete Finisher • Operator Forklift < 3 tonnes capacity • Spotter / Accredited Traffic Controller for mobile equipment • Formworker • Fencer • Intermediate Rigger or Scaffolder (Certified) Minimum 6 months exp Construction Worker Grade 4 • Multi-skilled Civil Worker (more than 3 plant licences / tickets / certifications) • Rigger or Scaffolder Holding an advanced certification • Pile Driver > 105 kw • Operator Dozer > 15 tonnes • Operator Loader >15 tonnes • Crawler loader (above 15,000 kg mass, up to and including 60,000 kg mass) • Crawler tractor with power operated attachments (above 15,000 kg, up to and including 60,000 kg mas...
Construction Worker Grade. 2 – 96% • Operates a Mobile Crane with a lifting capacity up to 20 tonnes • Certified Rigger • Certified Scaffolder Construction Worker Grade 3 – 100% • Electrical FitterElectrical Installer Construction Worker Grade 4 – 105% • Electrician – Special Class
Construction Worker Grade. 4 • Operates a mobile crane with a lifting capacity up to 20 tonnes
Time is Money Join Law Insider Premium to draft better contracts faster.