Data Gathering and Review Sample Clauses

Data Gathering and Review. Objectives: The objective of this task is to review existing data pertinent to the project and also to review previous hydraulic model developed by others. Key activities include:
AutoNDA by SimpleDocs
Data Gathering and Review. The ENGINEER will review the City’s data and records of the Rancho Santa Fe 1.75 MG water storage tank. This review will include the tank dive inspection reports, and as-built construction records. Data review will be followed by a field verification visit to the site. Field verification activities will verify as-built drawing information, including the tank dimensions, overflow elevations, piping elevations, and any other missing data with respect to the final design records for the facility. Other items regarding the overall facility and site will also be reviewed such as cathodic protection system (if installed), and compliance with current OSHA regulations. Paint chip samples for Toxicity Characteristic Leaching Procedure (TCLP) testing will be collected and analyzed for hazardous substances. This will confirm the need for special disposal practices that may be needed during construction.
Data Gathering and Review. Review 2014 CSMP, FEMA and County flood plain mapping, City natural resource maps, pump station and force main as-builts, record drawings, O&M Manuals, flow records, previously completed evaluation reports, and other information made available by the City.
Data Gathering and Review. Consultant shall review background information provided by the City and will develop a formal data request for any additional information required for completion of the work. Additional data requests may be made throughout the project; however most of the data required will be requested at the beginning of the project.

Related to Data Gathering and Review

  • Monitoring and Review The Provider agrees to allow access to the Department for purposes of monitoring and review. This access includes but is not limited to client records, fiscal records, staffing records, policy and procedural manuals, facilities, staff, and children in care of the Department. The Department will conduct quality reviews, which may include site-based quality review visits.

  • COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.

  • Program Monitoring and Evaluation The Recipient shall prepare, or cause to be prepared, and furnish to the Association not later than six months after the Closing Date, a report of such scope and in such detail as the Association shall reasonably request, on the execution of the Program, the performance by the Recipient and the Association of their respective obligations under the Legal Agreements and the accomplishment of the purposes of the Financing.”

  • Evaluation, Testing, and Monitoring 1. The System Agency may review, test, evaluate and monitor Grantee’s Products and services, as well as associated documentation and technical support for compliance with the Accessibility Standards. Review, testing, evaluation and monitoring may be conducted before and after the award of a contract. Testing and monitoring may include user acceptance testing. Neither the review, testing (including acceptance testing), evaluation or monitoring of any Product or service, nor the absence of review, testing, evaluation or monitoring, will result in a waiver of the State’s right to contest the Grantee’s assertion of compliance with the Accessibility Standards. 2. Grantee agrees to cooperate fully and provide the System Agency and its representatives timely access to Products, records, and other items and information needed to conduct such review, evaluation, testing, and monitoring.

  • Felling and Bucking Felling shall be done to minimize breakage of Included Timber and dam- age to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in A2. B6.411 Felling in Clearings. Insofar as ground conditions, tree lean, and shape of clearings per- mit, trees shall be felled so that their tops do not extend outside Clearcutting Units, construction clearings, and ar- eas of regeneration cutting. B6.000 Xxxxx Xxxxxxx. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in A6, except that occasional stumps of greater heights are acceptable when Purchaser determines that they are necessary for safe and efficient conduct of logging. Unless otherwise agreed, Purchaser shall re-cut high stumps so they will not exceed heights specified in A6 and shall dispose of severed portions in the same manner as other logging debris. The xxxxx heights shown in A6 were selected with the objective of maximum reasonable utilization of the timber, unless Sale Area Map shows special areas where xxxxx heights are lower for aesthetic, land treatment, or silvicultural rea- sons.

  • Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • COMPLAINTS HANDLING AND RESOLUTION 44.1 The Supplier shall notify the Authority of any Complaints made by Other Contracting Bodies, which are not resolved by operation of the Supplier's usual complaints handling procedure within five (5) Working Days of becoming aware of that Complaint and such notice shall contain full details of the Supplier's plans to resolve such Complaint. 44.2 Without prejudice to any rights and remedies that a complainant may have at Law, including under this Framework Agreement or a Call-Off Contract, and without prejudice to any obligation of the Supplier to take remedial action under the provisions of this Framework Agreement or a Call-Off Contract, the Supplier shall use its best endeavours to resolve the Complaint within ten (10) Working Days and in so doing, shall deal with the Complaint fully, expeditiously and fairly. 44.3 Within two (2) Working Days of a request by the Authority, the Supplier shall provide full details of a Complaint to the Authority, including details of steps taken to achieve its resolution.

  • Training and Education SECTION 1 – Law Enforcement Supervisors’ Training

  • TRAINING AND EMPLOYEE DEVELOPMENT 9.1 The Employer and the Union recognize the value and benefit of education and training designed to enhance an employee’s ability to perform their job duties. Training and employee development opportunities will be provided to employees in accordance with Employer policies and available resources. 9.2 Attendance at employer-required training will be considered time worked. The Employer will make reasonable attempts to schedule employer-required training during an employee’s regular work shift. The Employer will pay the registration and associated travel costs in accordance with Article 23, Travel, for employer-required training.