Review Existing Data Sample Clauses

Review Existing Data. At the start of the project, the A-E will collect and review existing information pertaining to the project. Potential sources of information include the following:
AutoNDA by SimpleDocs
Review Existing Data. While we have reviewed a great deal of utility mapping data, previous reports, and other available information, we will conduct additional reviews to fill the remaining data gaps. This includes but is not limited to land ownership, utility information not previously obtained, and the City of Laramie Pavement Study. Wood contacted Black Hills Energy to review natural gas pipeline mapping for the area but did not receive a response. Other utilities, such as Rocky Mountain Power, CenturyLink, and Charter Communications will be researched and included in design plan reviews. Conduct Field Investigations Field investigations will include a geotechnical investigation, utility potholing, and surveying. • Geotechnical – Wood has identified eight locations for geotechnical borings, as shown in Figure 3. Soil borings will be conducted by Drilling Engineers, who have supported Wood on previous City projects. The geotechnical investigation will be directed, logged, and analyzed by Wood staff. Wood will review the pavement sections in the City’s current Pavement Study to determine whether thicker sections are needed.
Review Existing Data. Contractor shall collect and review existing data including project area plats, utility as-builts (Copper Valley Electric Association, Copper Valley Telephone Cooperative, GCI Cable), roadway as-builts, historic soil borings, previous soils reports, and other relevant project information.
Review Existing Data. A. Data collection and review:
Review Existing Data. Consultant shall:
Review Existing Data. Following award of the contract, the A-E Team Members will meet with OC Waste & Recycling staff to identify and collect available technical documentation that will be required to develop the design deliverables described below in Tasks 2, 3, 4 and 5. The A-E Team Members understand that this information includes but is not limited to the following:  As-built documents, geological and geotechnical characterization reports, hydrogeological reports, and slope stability reports  Historical landslide monitoring data  Planning-related constraints as contained in CEQA and NCCP documents  Historical aerial photographs of the site  Latest revisions to the Master Development Plan (MDP) and Joint Technical Document (JTD)  Facility permits including waste discharge requirements (WDR), solid waste facility permit (SWFP), and U.S. Army Corps of Engineers and California Department of Fish and Game permits In preparing the current General Development Plan (GDP) for the Prima Deshecha Landfill, the A-E Team Members conducted preliminary geotechnical and hydrogeological studies for Zone 1 (Geotechnical Investigation Report Zone 1, dated 2000) and Zone 4 (Geotechnical Investigation Report Zone 4, dated 2002). Additional geological, hydrogeological, and geotechnical studies have subsequently been conducted by A-E Team Member at the Prima Deshecha Landfill in support of groundwater protection systems for Phases A, A1, B, B1/A2, C1, C2, and C3 as well as on adjacent properties by A-E Team Member. Recent geologic mapping has occurred for the Phase C3 development and its shear key excavations, as well as for a geological investigation of the north access road. The A-E Team Members will review and synthesize the data from other more recent studies. The synthesized data will be used to finalize the field work plan to identify all data gaps and to resolve any discrepancies between the interpretations made in the Phase C3 and upper access road geologic studies and previous geologic interpretations. Once compiled, the A-E Team Members will initiate a field investigation as described below in Task 2 to fill data gaps and prepare a Geotechnical Investigation Report for the Xxxx 0 Xxxxx X Liner Design area. Task 1 Deliverables: Geotechnical Investigation Field Work Plan and one copy of the Health and Safety Plan approximately one week before commencement of the field investigation.
Review Existing Data. The Consultant will review the existing water quality data, system operating data, and operations for each of the Municipalities. The Consultant shall develop a corrosion control plan that complies with the IEPA and the EPA’s requirements to identify optimal corrosion control for the water change over to Lake Michigan. The Municipalities will provide the following information:
AutoNDA by SimpleDocs

Related to Review Existing Data

  • OIG INSPECTION, AUDIT, AND REVIEW RIGHTS ‌ In addition to any other rights OIG may have by statute, regulation, or contract, OIG or its duly authorized representative(s) may conduct interviews, examine or request copies of Xxxxxx’x books, records, and other documents and supporting materials and/or conduct on-site reviews of any of Xxxxxx’x locations for the purpose of verifying and evaluating: (a) Xxxxxx’x compliance with the terms of this IA and (b) Xxxxxx’x compliance with the requirements of the Federal health care programs. The documentation described above shall be made available by Xxxxxx to OIG or its duly authorized representative(s) at all reasonable times for inspection, audit, and/or reproduction. Furthermore, for purposes of this provision, OIG or its duly authorized representative(s) may interview Xxxxxx and any of Xxxxxx’x employees or contractors who consent to be interviewed at the individual’s place of business during normal business hours or at such other place and time as may be mutually agreed upon between the individual and OIG. Xxxxxx shall assist OIG or its duly authorized representative(s) in contacting and arranging interviews with such individuals upon OIG’s request. Xxxxxx’x employees and contractors may elect to be interviewed with or without a representative of Xxxxxx present.

  • How to Update Your Records You agree to promptly update your registration records if your e-mail address or other information changes. You may update your records, such as your e-mail address, by using the Profile page.

  • Inspection Report The Client and the Company agree that the Company, and its inspector(s), will prepare a written home inspection report which shall:

  • Evaluation Reports Where a formal evaluation of an employee's performance is carried out, the employee shall be provided with a copy to read and review. Provision shall be made on the evaluation form for an employee to sign it. The form shall provide for the employee's signature in two (2) places, one indicating that the employee has read and accepts the evaluation, and the other indicating that the employee disagrees with the evaluation. The employee shall sign in one of the places provided within seven (7) calendar days. No employee may initiate a grievance regarding the contents of an evaluation report unless the signature indicates disagreement with the evaluation. The employee shall receive a copy of the evaluation report at the time of signing. An evaluation report shall not be changed after an employee has signed it, without the knowledge of the employee, and any such changes shall be subject to the grievance procedure.

  • Agreement Exceptions/Deviations Explanation If the proposing Vendor desires to deviate form the Vendor Agreement language, all such deviations must be listed on this attribute, with complete and detailed conditions and information included. TIPS will consider any deviations in its proposal award decisions, and TIPS reserves the right to accept or reject any proposal based upon any deviations indicated below. In the absence of any deviation entry on this attribute, the proposer assures TIPS of their full compliance with the Vendor Agreement. No response

  • Environmental Inspection at End of Agreement Term A. At Authority’s discretion, at least one hundred and twenty (120) days before the expiration or early termination of the Term as provided herein, Company will conduct an environmental inspection and examination of the Company Premises. At its discretion, Authority may complete environmental reviews to determine if recognized environmental conditions exist that could warrant soil and groundwater sampling. If warranted by the findings of Company or Authority’s inspection or if requested by Authority, a compliance audit or site assessment will be performed within the aforementioned time period by a qualified professional acceptable to Authority who will report the findings to Authority. The cost for professional consulting or engineering services required for such audit will be at the expense of Company. If a site assessment is conducted, Company agrees to pay all associated laboratory and testing fees incurred to test and analyze samples collected during the site assessment process. The Authority may also choose to conduct the compliance audit or site assessment. If the results of the assessment indicate that the Company Premises have been impacted by the release of Hazardous Substances, Company will immediately take such action as is necessary and will provide a substantial guaranty in a form and content acceptable to Authority that Company will clean up the contamination at its own expense, at no expense to Authority, and in accordance with Applicable Laws to the extent that it is obligated to do so by virtue of the foregoing provisions of this Article.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!