ENGINEERING DESIGN PACKAGE. Based on the review of the System(s), Site(s), and infrastructure, Contractor shall design (or have designed by consulting engineers) a System(s) (including all layout, civil, electrical, and structural components) that will produce the required electricity and that is capable of being operated in a safe, normal, reliable, and continuous manner as required by the contract documents at all operating conditions and modes specified in these specifications. The system design shall comply with all applicable laws and regulations and applicable permits. MUSD may utilize a third-party or independent engineering consultant to perform technical reviews. Studies prepared by the Contractor or any third- party consultants to the Contractor shall be provided to MUSD for review. Design review shall consist of three phases of submittals: Schematic Design, Design Development, and Construction Documents. For Schematic Design specifically, the Engineering Design Package shall not be submitted until all of the following work is complete: • Site Audits • Geotechnical Studies • Site Surveys and obtaining Title Reports • Fire Department review and approval of layouts The intent of the Schematic Design Engineering Design Package is to determine and finalize site layouts, equipment locations, and system sizing. All site related work that may impact these factors, including location of easements, must be complete prior to submitting the Schematic Design Engineering Design Package. It is expected that Contractor submit drafts and informal schematics in order to communicate progress and site-related issues to MUSD, as well as to facilitate review with the Fire Department. However, MUSD will not conduct a formal review of the Schematic Engineering Design Package until Contractor certifies that all site-related information impacting the layout of the system(s) has been collected, verified, and incorporated into the design. Contractor may not order materials and equipment (e.g., modules, inverters, racking) until MUSD has reviewed and approved the Schematic Engineering Design Package, thereby documenting final system sizes and locations. Contractor shall submit each Engineering Design Package to MUSD for review and approval. MUSD review time shall not be more than ten business days per phase. Each Engineering Design Package must be approved by MUSD prior to submittal of a subsequent package. Required design submittals are further detailed in Exhibit D, “Required Contract Submittals.” S...
AutoNDA by SimpleDocs
ENGINEERING DESIGN PACKAGE. ADA will develop an Engineering Design Package, in the English language, in such form as ADA shall deem appropriate for the particular product applicable thereto. Each Engineering Design Package will include, without limitation, schematics, drawings, bills of materials, product specifications, assembly drawings, approved supplier lists and test procedures. Each engineering design package will accurately reflect the design of the applicable Product and will be in sufficient detail to permit the manufacture of the Product.

Related to ENGINEERING DESIGN PACKAGE

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. Forest Service engineering shall be completed according to the schedule in A8. Should Forest Service be unable to perform the designated survey and design by the completion date or other agreed to time, upon written agreement, Purchaser shall assume responsibility for such work. In such event, Contracting Officer shall revise:

  • Project Completion Part 1 – Material Completion

  • Engineering Services Definition: Engineering Services includes any service or creative work, the adequate performance of which requires education, training and experience in the application of special knowledge in consulting, investigating, evaluating, planning and designing, engineering principles. Engineering Services covered by the Xxxxxx Architect-Engineers Act (40 U.S.C. 1102) are not covered in the primary scope of OASIS SB. Examples: Service areas that are included under the Engineering Services discipline include, but are not limited to the following:

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Engineering Report Lender shall have received a current Engineering Report with respect to the Property, which report shall be in form and substance reasonably satisfactory to Lender.

  • Engineering Reports 45 Section 8.08

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.