EQUIPMENT INSTALLATION AND COMMISSIONING Sample Clauses

EQUIPMENT INSTALLATION AND COMMISSIONING. In specifying, procuring, installing and commissioning Equipment, the parties will be subject to and will comply with the terms of Clause 16, Schedule Part 9 (Outline Commissioning Programme) and the Final Commissioning Programme [for the relevant Phases]. The parties will liaise and agree a schedule of delivery around Group 2 Equipment and Group 3 Equipment as part of the Final Commissioning Programme [for the relevant Phase] to ensure the Works are designed and completed to enable the installation of the Equipment supplied by the Authority, taking into account loading, ventilation and fixing requirements. In accordance with Clause 16.6 and the Final Commissioning Programme [for the relevant Phase], early access to server rooms will be made available to allow the Authority to install, commission and monitor Group 3 Equipment, access being required until the [relevant Phase] Actual Completion Date. In addition: the server rooms must be completed, secure and completely cleaned by hubco prior to installation of Group 3 Equipment by the Authority, and this will be reflected in the Final Commissioning Programme [for the relevant Phase]; for the avoidance of doubt, no part of the Works will be carried out in the server rooms during or following installation of the Group 3 Equipment by the Authority, save to the extent authorised by the Authority acting reasonably; and there shall be no access to the server rooms by hubco following Group 3 Equipment installation in the server room save to the extent authorised by the Authority or otherwise by this Agreement.
AutoNDA by SimpleDocs
EQUIPMENT INSTALLATION AND COMMISSIONING. The goal of this task is to install the necessary equipment for this project, to commission the equipment, and to integrate the equipment into normal facility operations. The Recipient shall: • Install the equipment as outlined in Design Report and Site Preparation and Equipment Procurement Report as follows: o Shut down facility processes as required; o Install new equipment; o Install measurement and verification (M&V) meters and equipment; and o Conduct pre-startup safety review. o Perform cold commissioning, which will include: ▪ Completion and system check out; and ▪ Confirmation of operational readiness. o Perform hot commissioning, which will include: ▪ Performance testing of new systems; ▪ Performance testing of integration with existing food production system; ▪ Performing a test run of production; and ▪ Optimize system performance in response to testing in order to meet stated performance specifications. • Provide an Equipment Installation Report that shall include, but not be limited to: o Summary of the equipment installation requirements for each demonstration site; o Identification of barriers involved during installation and discuss the steps taken to overcome those barriers; and o Discuss results of equipment start-up and commissioning at each site with respect to whether the equipment as installed meets the stated performance specifications. • Prepare CPR Report #2 in accordance with subtask 1. (CPR Meetings). • Participate in CPR meeting. Products: • Equipment Installation Report (draft and final) • CPR Report #2
EQUIPMENT INSTALLATION AND COMMISSIONING. The ShoreKat’s modular design will facilitate a shipping and delivery approach that is greatly simplified over what was required for the METS-1 system. This approach will eliminate field construction and will convert those activities to a short assembly process. This approach will also allow full functional testing at the factory, greatly reducing troubleshooting in the field during April 2, 2018 April 27, 2018
EQUIPMENT INSTALLATION AND COMMISSIONING. 2.1. The cost of installing and switching on the Equipment is paid by the Contractor.
EQUIPMENT INSTALLATION AND COMMISSIONING. The goal of this task is to install and commission the transcritical CO2 refrigeration systems for this project. The Recipient shall: • Disconnect electrical connections and cut refrigeration-piping connections in order to remove existing equipment, including condensing units, piping, valves, air units, and glycol chillers. • Set refrigeration racks and heat rejection equipment in place, one rack system at a time. • Install new piping runs on the roof to each individual load from the refrigeration racks. • Electrically connect new refrigeration racks. • Install new air units (evaporators) in the various refrigerated spaces. • Install new glycol chillers. • Install new spiral freezer equipment. • Fabricate, program, and install new refrigeration control panels for each rack system. • Commission equipment to meet stated performance specification. • Provide an Equipment Installation Memo for installation phases 1-3 that shall include, but not be limited to: o Summary of the equipment installation requirements for each demonstration site; o Identification of barriers involved during installation and discuss the steps taken to overcome those barriers; o Discussion of results of equipment commissioning at each site with respect to whether the equipment as installed meets the stated performance specifications. • Submit CPR Report #1 and participate in CPR meeting in accordance with subtask 1.3.

Related to EQUIPMENT INSTALLATION AND COMMISSIONING

  • Equipment Installation In order to meet its obligations under this Agreement, a Party that owns, rents, or leases equipment (the equipment owner) may require installation of such equipment on property owned by another Party (the property owner), provided that the property is being used for an electric utility purpose and that the property owner shall not be required to do so if it would thereby be prevented from performing its own obligations or exercising its rights under this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.