Project Documentation All documentation provided to the City other than Project drawings shall be furnished on a Microsoft compatible compact disc.
Project Documents In addition to any other pertinent and necessary Project documents, the following documents shall be used in the development of the Project:
Product Documentation You should review the policy documents carefully to ensure they accurately reflect the cover, conditions, limits, and other terms that you require. Particular attention should be paid to policy conditions and warranties as failure to comply with these could invalidate your policy. It is important that you retain and keep safely all documents associated with your policy so that you can refer to them in the event of a claim.
Construction Contract Documents The Construction Contract Documents shall consist of the plans and specifications prepared by the Engineer, and any addenda and change orders thereto, and the Owner-Contractor Agreement, all of which shall be compatible and consistent with this Agreement.
ENVIRONMENTAL DOCUMENTATION Each environmental service provided by the Engineer shall have a deliverable. Deliverables shall summarize the methods used for the environmental services, and shall summarize the results achieved. The summary of results shall be sufficiently detailed to provide satisfactory basis for thorough review by the State, The Federal Highway Administration (FHWA), and (where applicable) agencies with regulatory oversight. All deliverables shall meet regulatory requirements for legal sufficiency, and shall adhere to the requirements for reports enumerated in the State’s NEPA MOU.
Design Development Documents See Section 2, Part 1, Article 2.1.5.
Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.
Project contract 1. For each approved project a project contract shall be concluded between the Programme Operator and the Project Promoter.
Project Implementation 2. The Borrower shall:
Project Construction Budget The project construction cost allowance specifically stated in writing as the ‘revised’ or ‘current’ ‘Project Construction Budget’ by the Trustees at each applicable phase of plan development.