Location of the works. The designated site to be shown to the contractor is at Nkgopoleng Bakone Secondary School, Chloe Village in the Capricorn District in Limpopo Province To be communicated to the winning bidder before construction commences The drawings used for setting up the Bills of Quantities are attached on a compact disc at the back of this tender document. • Architectural drawings Three (3) sets to be provided to the successful tenderer at site hand over
Location of the works. The site of the Works is situated on the airside of Xxxx Xxxxxxx International Airport in Bloemfontein. The site is under the jurisdiction of the Airports Company South Africa (ACSA). Location of the site is shown on the Layout Plan (Drawing No. 301695-CIV-LA-003 Rev A). The contractor’s site camp will be situated within ACSA’s premises and shall be indicated at the site clarification meeting.
Location of the works. The designated site to be shown to the contractor is at Nkomo Maboko School, NKOMO VILLAGE in Mopani District of the Limpopo Province To be communicated to the winning bidder before construction commences The drawings used for setting up the Bills of Quantities are attached on a compact disc at the back of this tender document. • Architectural drawings Three (3) sets to be provided to the successful tenderer at site hand over
Location of the works. 6.1 Where location dimensions for the proposed Works are not shown on the drawings or digital file, the locations are intended to be approximate.
6.2 Unless otherwise specified, the Engineer will provide the Contractor with a copy of the digital drawing file for the Contractor and/or his surveyor to create a point file to be used for layout to perform the construction Works.
6.3 The Contractor shall perform all layout as required from the digital drawing file and shall be responsible for all dimensions and elevations determined from the digital information.
6.4 The Contractor shall satisfy himself, before commencing any Work, as to the meaning, intent, and accuracy of the information in the digital drawing file as it relates to control points, control lines, benchmarks, and the construction drawings.
6.5 Should the Contractor discover or suspect any errors in the digital drawing file provided by the Contract Administrator, he shall at once discontinue the affected Work until such errors are investigated by the Contract Administrator and, if necessary, rectified.
6.6 The Contractor shall carefully preserve bench marks, reference points and stakes. In case of willful or careless destruction or disturbance of such markers, he shall be charged with the expense of replacing them and shall be responsible for any mistakes that may be caused by their destruction, loss or disturbance.
6.7 In any dispute between the Contractor and the Contract Administrator on the correctness of grades, locations, elevations of the installations or constructed Works, the Contractor shall be responsible for proving by means of cut sheets and undisturbed stakes, that he has made the installation or construction in accordance with the layout provided.
6.8 The Contractor shall be required to maintain an "as-constructed" drawing set for the project, with all Changes and notes marked in red ink and an “as-constructed” digital survey file. This information shall be available to the Contract Administrator for review on request, and shall be submitted to the Contract Administrator prior to issuing the Notice of Acceptance.
6.9 Legal survey markers, disturbed or removed by the construction operation that existed at a horizontal distance of 1.0 m or more from the maximum allowable trench width as shown on the standard drawings, shall be replaced at the Contractor’s expense. If it is necessary to remove or disturb existing legal survey markers that are within the above limits, the Engineer shal...
Location of the works. Contract 3D.3 in reference to the BGW (reference: own study)
Location of the works. The Steenbras Power Station is a Hydroelectric Pumped Storage scheme located at Hydro street, Xxxxxx’x Bay. The Two gas turbines stations are located at Athlone Power Station, off Bhunga Avenue, and the Roggebbaai Power Station is located in Cape Town, on Xxxxxx Xxxxxxx Boulevard. See location plan attached to this document.
Location of the works. The Transnet Engineering Salt River Plant is a facility covering approximately 35 ha, encompassing various engineering workshops and administrative support buildings for the maintenance and construction of locomotives and coaches. The site is located off Voortrekker Road (R102), in Salt River, just west of Black River Parkway (M5). Refer to Part C4 for further details regarding site GPS location, site access points and proposed contractor site camp.
Location of the works. The Works is located at King Shaka International Airport at various locations which include restricted and access-controlled areas. It is crucial for the service provider to note that King Shaka International Airport is a National Key Point and governed as such.
Location of the works. The Works is located at various Airports Company South Africa operated airports within the restricted and access controlled areas. It is crucial for the Contractor to note that some ACSA Airports are National Key Point and governed as such.