Need for Dispatching Engineers from Facility Construction Contractor Sample Clauses

Need for Dispatching Engineers from Facility Construction Contractor. While unskilled workers can be procured in Solomon Islands, there is a need to conduct work under the guidance of skilled technicians specializing in borehole drilling, aggregate production, concrete production, framework and steel bar works, waterproofing, installation of electrical facilities and machinery, etc. because of the reasons described below. Therefore, specialized skilled technicians engaging in borehole drilling, civil and building works, and mechanical and electrical equipment works need to be dispatched from Japan or a third country. • Particularly with respect to borehole works, there are no construction machines and facilities in the country, and there are no workers experienced in borehole works. Considering the extreme importance of borehole works, the progress of which may determine the term of completion of this Project, it is necessary to employ well-experienced borehole contractors who are familiar with local conditions, either from Japan or from a third country. • Because appropriate and reliable execution of works is needed, it is necessary to ensure that local workers sufficiently understand the different types of works to be performed in parallel and to provide practical instruction to them regarding the arrangements at construction sites and work procedures. In particular, the construction of reinforced concrete structures requires water-tight, uniform, and quality controlled concrete production, conveyance, and laying. In addition, it is necessary to ensure smooth execution of a series of works including framework scaffolding, support timbering, assembly and installation of framework, processing and assembly of steel bars, and concrete production, conveyance, and laying. For these reasons, it is necessary that skilled workers with sufficient experience in working abroad in aggregate production, concrete production, scaffolding, support timbering, framework, steel bar works, waterproofing, etc. are employed and sent from Japan or a third country. • Because many of the construction sites are adjacent to existing water supply facilities, sufficient attention and precautions shall be required to minimize the possibility of disruption of water supply to inhabitants either resulting from a fault during work or for reasons related to the work. Because construction sites are near the living areas of inhabitants in the neighborhood, sufficient measures shall be taken to ensure the safety and hygiene of workers and inhabitants during wor...
AutoNDA by SimpleDocs

Related to Need for Dispatching Engineers from Facility Construction Contractor

  • Construction Phase - Administration of the Construction Contract 1.6.1 The Construction Phase shall commence with the acceptance of the Construction Manager’s Guaranteed Maximum Price (or acceptance of a partial Guaranteed Maximum Price for a stage or phase) and issuance of a Notice to Proceed with Construction Services and terminate sixty (60) days after Final Payment to the Contractor is made, or when all of Architect/Engineer’s services have been satisfactorily performed, whichever occurs later.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • BUILDER’S RISK FOR NEW CONSTRUCTION PROJECTS If the project is NEW CONSTRUCTION, then the following provisions apply:

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.

  • BUILDER’S RISK FOR CONSTRUCTION RENOVATION PROJECTS If the project is CONSTRUCTION RENOVATION of an existing structure, and the State has already determined that Contractor will not be obligated to obtain and maintain Builder’s Risk insurance, then the following provisions apply:

  • CONSTRUCTION AND RELATED ENGINEERING SERVICES A. General construction work for buildings (CPC 512) 1) Unbound* 2) None 3) None 1) Unbound* 2) None 3) None

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.