ASSEMBLY AND INSTALLATION the supply and installation, including the use of labour, of all the materials, accessories and secondary components that might be required for the correct and safe operation and management of the System. Maintenance and operative capacity of the site for the entire duration of the Works;
ASSEMBLY AND INSTALLATION a) If Supplier is responsible for assembly or installation of the Goods, Supplier shall perform these services in a careful and prudent manner in compliance and conformity with safe industry practices, Applicable Policies, Assembly Instructions, and in accordance with the requirements of all applicable laws, ordinances and regulations.
b) PERI may agree to provide engineering or design services in respect of the Goods, in which case all plans, calculations, designs, method statements and design advice produced by XXXX, or its agents or consultants, before or after delivery of the Goods are intended to be only a general guide. It is the Supplier’s sole responsibility to check the adequacy, accuracy, suitability and completeness of the design advice and to notify PERI forthwith of any concerns.
ASSEMBLY AND INSTALLATION. 7.1 Unless otherwise agreed in writing, assembly/installation shall be subject to the following provisions, Customer shall provide at its own expense:
7.1.1 all earth and construction work and other ancillary work outside the scope of the work agreed to be performed by the Company, including the necessary skilled and unskilled labor, construction materials and tools;
7.1.2 the equipment and materials necessary for assembly and commissioning such as scaffolds, lifting equipment and other devices as well as fuels and lubricants;
7.1.3 energy, water and other utilities at the point of use including connections, heating and lighting;
7.1.4 suitable dry and lockable rooms of sufficient size adjacent to the site for the storage of machine parts, apparatus, materials, tools, etc. and adequate working and recreation rooms for the assembly and installation personnel, including sanitary facilities as are appropriate in the specific circumstances;
7.1.5 all measures reasonably appropriate for the protection of Xxxxxxxx’s own possessions and to protect the possessions of the Company and of the assembly and installation personnel at the site; and
7.1.6 protective clothing and protective devices needed due to particular conditions prevailing on the specific site.
7.2 Before the assembly/installation starts, Customer shall make available of its own accord architectural drawings and plans, as well as any other information or makings required concerning the location of concealed electric power, gas and water lines or of similar installations as well as the necessary structural data.
7.3 Prior to assembly or installation, the materials and equipment necessary for the work to start must be available on the site of assembly/installation and any preparatory work must have advanced to such a degree that assembly/installation can be started as agreed and carried out without interruption. Access roads and the assembly/installation site itself must be level and clear.
7.4 The Company shall make its own employees available to provide on-site installation assistance. Notwithstanding the foregoing, the Company shall not be responsible for the means, methods, techniques or procedures of installation selected by Customer or any failure of installation personnel to perform the assembly or installation in accordance with the applicable assembly instructions or Customer’s instructions. Except to the extent that the Company’s employees actually perform the assembly or installation, the Com...
ASSEMBLY AND INSTALLATION. 1. The Principal is responsible for implementing, in a correct and timely manner, all arrangements facilities and/or conditions that are necessary for setting up the product to be assembled and/or the correct operation of the product in assembled state.
2. Notwithstanding the provision of paragraph 1, the Principal shall in any event arrange that (at his own expense and risk):
a. the employees of LGMG, or the employees of its subcontractors as soon as they have arrived at the place of installation, can commence their work and continue performing their work during normal working hours and moreover, outside normal working hours if this is deemed necessary by LGMG, provided the Principal has been informed of this in good time.
b. suitable accommodation with all conveniences becomes available for the employees of LGMG or its subcontractors, as required by virtue of governmental regulations, the agreement or practice;
c. the access roads to the place of installation are suitable for the requisite transport;
d. the designated place of installation is suitable for storage and assembly;
e. the necessary lockable storage sites for equipment, tools and other matters are present;
f. the requisite and usual auxiliary workers, auxiliary equipment, additives and industrial materials (fuel and lubricants, polishing and other small materials, gas, water, electricity, steam, pressurised air, heating, lighting etc.) as well as the normal measuring and testing equipment for the business of the Principal, are available for LGMG employees and its subcontractors in good time, free of charge and in the right place;
g. all necessary safety and precautionary measures have been taken and will be maintained in accordance with the guidelines for VCA certified work and that, as regards assembly or installation undertaken by our technicians is compliant with all government regulations;
h. at the start of and during the assembly all the requisite products and materials are present in the correct place.
3. Damage and costs arising because the conditions set forth in this article have not been complied with or not in good time, are to be paid for by the Principal.
4. With regard to the assembly/installation time, article 5 is likewise applicable.
ASSEMBLY AND INSTALLATION. 13.1 The assembly and/or the installation of the Products shall not be included in the purchase price.
13.2 In the event that Escuder undertakes to carry out the assembly or the installation of the Products, the parties shall expressly agree the terms and conditions applicable to the aforesaid assembly or installation.
ASSEMBLY AND INSTALLATION. 1. The Principal is responsible vis-à-vis Machinefabriek Bolier B.V.for implementing correctly and in good time all arrangements, facilities and/or conditions that are necessary for setting up the product to be assembled and/or the correct operation of the product in assembled state, except and insofar as this work is carried out by or on behalf of Machinefabriek Bolier X.X.xx accordance with data and/or drawings made by or on behalf or the latter.
2. Notwithstanding the provision of paragraph 1, the Principal shall in any event arrange at his own expense and risk that:
a. the employees of Machinefabriek Bolier B.V., or the employers of its subcontractors as soon as they have arrived at the place of installation, can commence their work and continue performing their work during normal working hours and moreover, outside normal working hours if this is deemed necessary by Machinefabriek Bolier B.V., provided the Principal has been informed of this in good time.
b. suitable accommodation with all conveniences becomes available for the employees of Machinefabriek Bolier B.V.or its subcontractors, as required by virtue of governmental regulations, the agreement or practice;
c. the access roads to the place of installation are suitable for the requisite transport;
d. the designated place of installation is suitable for storage and assembly;
e. the necessary lockable storage sites for equipment, tools and other matters are present;
f. the requisite and usual auxiliary workers, auxiliary equipment, additives and industrial materials (fuel and lubricants, polishing and other small materials, gas, water, electricity, steam, pressurized air, heating, lighting etc.) as well as the normal measuring and testing equipment for the business of the Principal, are available for Machinefabriek Bolier B.V.employees and its subcontractors in good time, free of charge and in the right place;
g. all necessary safety and precautionary measures have been taken and will be maintained in accordance with the guidelines for VCA certified work and that, as regards assembly or installation undertaken by our technicians is complaint with all government regulations;
h. at the start of and during the assembly all the requisite products and materials are present in the correct place.
3. Damage and costs arising because the conditions set forth in this article have not been complied with or not in good time, are to be paid for by te Principal.
4. With regard to the assembly /installation tim...
ASSEMBLY AND INSTALLATION. The assembly and installation of the Hardware Components purchased by Customer shall be performed by the Customer in accordance with Myndlift’s assembly and installation instructions as specified in the Myndlift’s manual guide provided to Customer upon delivery (“Documentation”) and in the video tutorials (“Tutorials”) available under the Frequently Asked Questions and ‘free video tutorials’ on the Myndlift dashboard (xxxxxxxxx.xxxxxxxx.xxx), and at Customer’s own responsibility. Myndlift shall not assume any legal liability in relation to the assembly and installation of the Hardware Components. Myndlift shall not assume legal liability for damages caused to the Hardware Components or other accidents caused or damages incurred while the Customer is assembling or installing the Hardware Components. The foregoing shall not apply to damages arising from a cause directly attributable to Myndlift.
ASSEMBLY AND INSTALLATION. 11.1 If the supplier undertakes the assembly and installation, these works shall be included in the delivery price unless separate payment has been agreed upon.
ASSEMBLY AND INSTALLATION. Assembly and installation can never fall under the agreement between MAQ Sun Protection Solutions and the customer. The customer must at his own expense provide all support and materials required for assembly and installation. The customer must also set the limits of the screens.
ASSEMBLY AND INSTALLATION. MAINTENANCE BY THE CUSTOMER