OTDR TESTING Sample Clauses

OTDR TESTING. All traces will be provided in hard copy and diskette form using GR 196 format. This testing will be conducted at both 1310 nm and 1550 nm wavelengths when the Leased Fiber consists of Standard Single Mode Fiber, but will be done at 1550 nm only if the Leased Fiber consists of either Dispersion Shifted Fiber (True-WaveTM, LEAFTM, etc.) or a combination of Single Mode and Dispersion Shifted fiber types. OTDR testing will be conducted on a bi-directional basis for each Leased Fiber in each span at the appropriate wavelengths for the Leased Fiber described above. However, if due to length or attenuation reasons that the Leased Fiber span exceeds the dynamic range of an OTDR, a portion or all of the span may be tested on a unidirectional basis only. Alternatively, the Leased Fiber span may be divided into shorter testing spans, to the extent reasonably possible, in order to obtain bi-directional analysis. Also, in instances where a Carrier intends to accept Leased Fiber that is not terminated at one end by MFN in a fiber distribution panel (such as in a manhole or handhole) only unidirectional testing will be performed.
AutoNDA by SimpleDocs
OTDR TESTING. All traces will be provided in hard copy and diskette form using GR 196 format. This testing will be conducted at both 1310 nm and 1550 nm only if the Leased Fiber consists of either Dispersion Shifted Fiber (True-Wave(TM), LEAF(TM), etc.) or a combination of Single Mode and Dispersion Shifted fiber types. OTDR testing will be conducted on a bi-directional basis for each Leased Fiber in each span at the appropriate wavelengths for the Leased Fiber described above. However, if due to length or attenuation reasons that the Leased Fiber span exceeds the dynamic range of an OTDR, a portion or the entire span may be tested on a unidirectional basis only. Alternatively, the Leased Fiber span may be divided into shorter testing spans, to the extent reasonably possible, in order to obtain bi-directional analysis. Also, in instances where a Customer intends to accept Leased Fiber that is not terminated at one end by MFN in a fiber distribution panel (such as in a manhole or handhole) only unidirectional testing will be performed. The turnover documentation package delivered to Customer will contain the actual traces that detail the testing parameters (including pulse width, averaging and range). The average bi-directional splice loss for all splices within each span will be 0.15 dB or less while each connector pair (such as at a FDP) will have an average bi-directional connector loss for all splices within each span of 0.5 dB or less for all connectors within each span. (Note that the front and end connector of the span can only be measured uni-directionally and will also have a loss equal to or less than 0.5 dB). In the event that OTDR acceptance testing must be done on a unidirectional basis (for reasons described above), an average per span splice loss will be 0.30 dB. All traces will be provided in hard copy and/or diskette form using GR 196 format. If the average bi-directional splice loss of each span exceeds 0.15 dB (or 0.30 dB uni-directionally), MFN will provide upon the Customer's request documentation of at least three attempts to reduce this value to below 0.15 dB dB (0.30 dB uni-directionally). The only exception to this will be in the instance of splice between two different fiber types (Standard Single-mode to Dispersion Shifted, Depressed-Clad, fibers with different mode-field diameters). Customer should also note that the loss and/or reflectance of the front-end connector (as measured using a launch cord) is only an indicator of a problem such as a...
OTDR TESTING. (a) Grantor will conduct optical time-domain reflectometer (“OTDR”) testing at both 1310 nm and 1550 nm wavelengths when the Buyer Fiber consists of Standard Single Mode Fiber, and at 1550 nm if the Buyer Fibers consist of either Dispersion Shifted Fiber (TrueWave™, LEAF™, etc.) or a combination of Single Mode and Dispersion Shifted fiber types. Grantor will conduct OTDR testing on a bi-directional basis for each Buyer Fiber in each span. However, if due to length or attenuation reasons the Buyer Fiber span exceeds the OTDR dynamic range, a portion or the entire span may be tested on a unidirectional basis. Alternatively, the Buyer Fiber span may be divided into shorter testing spans, to the extent reasonably possible, in order to obtain bi-directional analysis. Also, in instances where Xxxxx intends to accept Buyer Fibers that are not terminated at one end by Grantor in a fiber distribution panel (such as in a manhole or handhole), only unidirectional testing will be performed. Based on the foregoing OTDR testing methodology, each Buyer Fiber span must meet the following minimum performance requirements, excluding loss associated with splices and connectors: Singlemode at 1310 nm 0.35 Singlemode at 1550 nm 0.25 (b) Grantor will provide a turnover documentation package containing the actual traces detailing the testing parameters (including pulse width, averaging and range). The average bi-directional splice loss for all splices within each span must be
OTDR TESTING. 23.1 After all splice points for the fiber optic spans are completed, Contactor shall record measurements of the splice losses with an Optical Time Domain Reflectometer (OTDR). These measurements must be made after the splice cases are closed and permanently racked in manhole/handhole or lashed to strand in order to check for macro- bending problems, unless directed by Company where temporary testing splices are required. Contractor shall follow Company specifications to test the fiber optic cable as well as the specifications of the cable manufacturer and the equipment manufacturer. 23.2 Company has standardized on GN NetWorks Optical Test System Emulation Software for analyzing, reporting and printing OTDR traces. The GN Networks software is able to read GN Nettest T5 format OTDR traces or Bellcore – GR-196 CORE OTDR Data Standard (Issue 1, 9/95) format traces. Company requires the use of OTDRs that are able to produce one of these trace formats for the acceptance testing. OTDRs that are acceptable for testing on include; but not limited to; models CMA 4000/8800 and TD-3000. Operations of these OTDRs shall be in accordance with the manufacturer’s specifications. 23.3 Contractor shall note the fiber type and calibrate all testing and splicing equipment as applicable. This shall include, but not be limited to, dispersion, clad, pulse width, range, scan rate, and refractive index. Contractor shall set the machine to match the manufacturer’s recommendation for the fiber being tested. Contractor shall use the same calibration for all similar type fibers in both directions within the same fiber optic span under test. Fibers shall be tested with an OTDR at 1310 nm and 1550 nm for Standard Single Mode Fiber. 23.4 Contractor shall test all fibers bi-directionally, after splicing has occurred. If testing from a terminated end, Contractor shall utilize a minimum of a one-kilometer (1 km) launch cord / pulse suppressor. Contractor shall allow enough time during the production of a trace to allow the signal to normalize before recording. 23.5 Contractor shall analyze the results of the OTDR testing to correct deficiencies in the field splices. Company’s guidelines for individual and overall fiber optic span splice loss shall be as follows: Splice Method Glass Type Uni- Directional Guideline (+/-) Power Meter Span Splice Loss Factor (@ 1310nm) Power Meter Span Splice Loss Factor (@ 1550nm) Single Fusion Single Mode 0.20 dB 0.10 dB 0.10 dB Mass Fusion Single Mode 0.30 ...
OTDR TESTING. Optical Time-Domain Reflectometry (OTDR) traces will be taken and splice loss measurements recorded and summarized on data sheets. For any span, OTDR testing will be performed where the fiber is terminated with a connector. OTDR testing will be conducted at both 1310nm and 1550nm wavelengths. OTDR testing will be conducted on a bi-directional basis for each Fiber(s) in each Segment at the appropriate wavelengths described above. The Acceptance Package will contain the actual traces that detail the testing parameters.

Related to OTDR TESTING

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • ODUF Testing 6.6.1 Upon request from TWTC, AT&T shall send ODUF test files to TWTC. The Parties agree to review and discuss the ODUF file content and/or format. For testing of usage results, AT&T shall request that TWTC set up a production (live) file. The live test may consist of TWTC’s employees making test calls for the types of services TWTC requests on ODUF. These test calls are logged by TWTC, and the logs are provided to AT&T. These logs will be used to verify the files. Testing will be completed within thirty (30) days from the date on which the initial test file was sent.

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act. (B) All classes covered by this Agreement are designated special risk classes for drug testing purposes. Special risk means employees who are required as a condition of employment to be certified under Chapter 633 or Chapter 943, F.S. (C) An employee shall have the right to grieve any disciplinary action taken under section 112.0455, the Drug-Free Workplace Act, subject to the limitations on the grievability of disciplinary actions in Article 10. If an employee is not disciplined but is denied a demotion, reassignment, or promotion as a result of a positive confirmed drug test, the employee shall have the right to grieve such action in accordance with Article 6.

  • Follow-up Testing An employee shall submit to unscheduled follow-up drug and/or alcohol testing if, within the previous 24-month period, the employee voluntarily disclosed drug or alcohol problems, entered into or completed a rehabilitation program for drug or alcohol abuse, failed or refused a preappointment drug test, or was disciplined for violating the provisions of this Agreement and Employer work rules. The Employer may require an employee who is subject to follow-up testing to submit to no more than six unscheduled drug or alcohol tests within any 12 month period.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester. 7.2.2 No later than thirty (30) Days prior to the earlier of the Scheduled Substantial Completion Date or Substantial Completion, Design-Builder shall provide to Owner for review a detailed testing plan for the Performance Tests (other than for air emissions). Owner and Design-Builder shall agree upon a testing plan that shall be consistent with the Performance Test Protocol contained in Exhibit A hereto. After such agreement has been reached, Design-Builder shall notify the Owner five (5) business days prior to the date Design-Builder intends to commence the Performance Tests and shall notify the Owner upon commencement of the Performance Tests. Owner and Independent Engineer each have the right to witness all testing, including the Performance Tests and any equipment testing, whether at the Site or at the Subcontractor’s or equipment supplier’s premises during the course of this Agreement. Notwithstanding the foregoing sentence, Owner shall bear the costs of providing a witness to any such testing and all such witnesses shall comply at all times with Design-Builder’s, Subcontractor’s or equipment supplier’s safety and security procedures and other reasonable requirements, and otherwise conduct themselves in a manner that does not interfere with Design-Builder’s, Subcontractor’s or equipment supplier’s activities or operations. 7.2.3 Design-Builder shall provide to Owner a Performance Test report (excluding results from air emissions testing), including all applicable test data, calculations and certificates indicating the results of the Performance Tests and, within five (5) business days of Owner’s receipt of such results, Owner, Independent Engineer and Design-Builder will jointly inspect such Work and review the results of the Performance Tests to verify that the Performance Guarantee Criteria have been met. If Owner or Independent Engineer reasonably determines that the Performance Guarantee Criteria have not been met, Owner shall notify Design-Builder the reasons why Owner determined that the Performance Guarantee Criteria have not been met and Design-Builder shall promptly take such action or perform such additional work as will achieve the Performance Guarantee Criteria and shall issue to the Owner another notice in accordance with Section 7.2.2; provided however that if the notice relates to a retest, the notice may be provided no less than two (2) business days prior to the Performance Tests. Such procedure shall be repeated as necessary until Owner and Independent Engineer verifies that the Performance Guarantee Criteria have been met. 7.2.4 If Owner, for whatever reason, prevents Design-Builder from demonstrating the Performance Guarantee Criteria within thirty (30) Days of Design-Builder’s notice that the Plant is ready for Performance Testing, then Design-Builder shall be excused from demonstrating compliance with the Performance Guarantee Criteria during such period of time that Design-Builder is prevented from demonstrating compliance with the Performance Guarantee Criteria; provided however that Design-Builder will be deemed to have fulfilled all of its obligations to demonstrate that the Plant meets the Performance Guarantee Criteria should such period of time during which Design-Builder is prevented from demonstrating the Performance Criteria exceed thirty (30) Days or extend beyond the Final Completion Date.

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.

  • Product Testing No later than [**] prior to a scheduled Delivery ARIAD US shall send to ARIAD SWISSCO the Delivery Documents for review. Following such review, unless within [**] of receipt of the Delivery Documents ARIAD SWISSCO gives written notice of rejection of the Product to be delivered, stating the reasons for such rejection, the Delivery shall proceed, and both Parties shall organize the same. Upon arrival at ARIAD SWISSCO nominated site it shall visually inspect the shipment of the Product to identify any damage to the external packaging. ARIAD SWISSCO may reject any shipment (or portion thereof) of the Product that is damaged by providing to ARIAD US reasonable evidence of damage within [**] after Delivery of such Product. If ARIAD SWISSCO does not so reject any shipment (or portion thereof) of the Product within [**] of Delivery of such Product, ARIAD SWISSCO shall be deemed to have accepted such shipment of the Product; provided, however, that in the case of the Product having any Latent Defect, ARIAD SWISSCO shall notify ARIAD US promptly once it becomes aware that a Product contains a Latent Defect and subsequently may reject such Product by giving written notice to ARIAD US of ARIAD SWISSCO’s rejection of such Product and shipping a representative sample of such Product or other evidence of Non-Conformance to ARIAD US within [**] after becoming aware of such Latent Defect, which notice shall include a description of the Latent Defect.

  • Stability Testing Patheon may be requested to conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C to a Product Agreement. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within one Business Day, after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications, cGMPs, and Applicable Laws. Patheon will give Client ail stability test data and results at Client’s request.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!